KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  3-27-2010
Number of Hours:  2.30
Manual Reference:  SNX-T01
Brief Description:  Vert Stab Trimming

Spent the entire time taking the vertical stabilizer on and off in order to trim it to allow full up/down elevator travel.

First turned around some improperly installed AN3-7A bolts that would have interfered with the control horn. Then I trimmed the size vertical stabilizer skins. Next to be trimmed was the bellcrank area on the control horn cross tube. Then on and off trimming and testing, trimming and testing.

Long, laborious process.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.