Powered By Kitlog Pro v2.0
Daves Web Site
Long-EZ
Ch14 CS Spar
Work Logs Found:
54
Category Work Time:
528 Hours
Date
Hours
Work Log Summary
Details
06-21-2015
3.00
Wing to CS Spar tapes
Details
06-20-2015
10.00
Floxing the CS Spar to the Fuselage
Details
06-19-2015
10.00
Joining Spar to Fuselage Prep 2
Details
06-18-2015
5.00
Joining Spar to Fuselage Prep 1
Details
06-17-2015
10.00
Wings to Spar Prep
Details
04-02-2014
10.00
Complete CS Spar
Details
04-01-2014
10.00
Spar end pieces flox corners
Details
03-31-2014
10.00
Glassing the forward Spar face
Details
03-30-2014
10.00
Spar Forward Face prep 2
Details
03-29-2014
10.00
Spar Forward Face prep 1
Details
03-23-2014
10.00
CS Spar Outside Hardpoints 2
Details
03-22-2014
10.00
CS Spar Outside Hardpoints 1
Details
03-20-2014
10.00
Sheer web clean up
Details
03-18-2014
10.00
CS Spar Outer Sheer web 2
Details
03-17-2014
10.00
CS Spar Outer Sheer web 1
Details
03-15-2014
10.00
More CS Spar sheer web prep
Details
03-11-2014
10.00
CS Spar hardshell prep
Details
03-10-2014
10.00
CS Spar wooden inserts
Details
03-07-2014
10.00
Bottom Spar Cap cleanup
Details
03-06-2014
10.00
CS Spar Bottom Cap Layup
Details
02-27-2014
10.00
Cured top cap clean up
Details
02-26-2014
10.00
CS Spar Top Cap layup 2
Details
02-25-2014
10.00
CS Spar Top Cap layup1
Details
02-24-2014
10.00
Top Spar Cap Prep
Details
02-19-2014
10.00
CS Spar Shearweb 2
Details
02-18-2014
10.00
CS Spar Shearweb 1
Details
02-17-2014
10.00
Midpoints Revisited 4
Details
02-16-2014
10.00
Midpoints Revisited 3
Details
02-14-2014
10.00
Midpoints Revisited 2
Details
02-10-2014
10.00
Midpoints Revisited 1
Details
02-09-2014
10.00
Mid Spar Hardpoint check
Details
02-08-2014
10.00
Outer Hardpoints
Details
02-07-2014
10.00
Final Cut CS Spar cap troughs
Details
02-01-2014
10.00
Spar Tape Dispensing Tool
Details
01-29-2014
10.00
CS Spar End Trim
Details
12-30-2013
10.00
Cutting initial Spar troughs
Details
12-29-2013
10.00
Cutting initial CS Spar troughs
Details
10-13-2013
10.00
Remove spar from jig
Details
10-12-2013
10.00
Wet micro the Box
Details
10-10-2013
10.00
CS4 Spar box Lid
Details
10-09-2013
10.00
Inside bulkhead Inner Spar hardpoints
Details
09-30-2013
10.00
Outside Inner Spar hardpoints
Details
09-28-2013
10.00
Inside Spar Prep
Details
09-27-2013
10.00
Spar Bulkheads
Details
09-26-2013
10.00
Inside Spar BID layed up
Details
09-08-2013
10.00
Inside Spar layup prep
Details
08-08-2013
10.00
Manufacture Spar hard points
Details
08-05-2013
10.00
Spar box inside end pieces
Details
08-04-2013
10.00
Spar inside front
Details
08-03-2013
10.00
Spar inside back
Details
08-02-2013
10.00
Spar Inside base
Details
07-29-2013
10.00
Spar Jig assembly
Details
07-28-2013
10.00
Spar jig tweaking
Details
07-23-2013
10.00
Cutting the Centersection Spar foam
Details
SITE NAVIGATION
Contact Builder
Long-EZ Home
Category
# Logs
# Hours
All
822
6788
Avionics
1
1
Ch C HeadLight
1
6
Ch D Wheel Pants
20
152
Ch E Oxygen System
1
1
Ch10 Roncz Canard
23
227
Ch11 Elevators
34
270
Ch12 Canard Install
9
73
Ch13 Nose & NoseGear
112
935
Ch14 CS Spar
54
528
Ch16 Control System
18
93
Ch18 Canopy
2
4
Ch19 Wings & Alieron
122
1066
Ch20 Winglet/Rudder
68
510
Ch21 Wing Strakes
46
268
Ch22 Electrical
1
10
Ch24 Covers/Fairings
17
132
Ch25 Finishing
7
105
Ch3 Education
2
20
Ch4 Bulkheads
29
286
Ch5 Fuselage Sides
33
330
Ch6 Assembly
29
282
Ch7 Fuse Exterior
14
140
Ch8 Rollover/Belts
15
120
Ch9 Main Gear& Brake
69
682
ChA Cabin Oil Heater
60
334
ChB Foot Rests
3
16
Engine Installation
9
74
Ferry Tank
1
6
MILESTONES
6
6
Pitch Trim
3
10
Roll Trim
1
10
Strange Tips
2
4
Tests
8
57
Wheel Pants
1
20
Wheel Pants
1
10
Copyright © 2001-2024 Matronics. All Rights Reserved.