Larry Winger's 601XL Project
Zodiac CH 650
Avionics
Work Logs Found:
77
Category Work Time:
284 Hours
Date
Hours
Work Log Summary
Details
12-17-2012
1.25
Tested continuity to wing tips
Details
12-10-2012
2.50
2 - Completed behind the panel wire routing
Details
12-10-2012
1.75
1 - More left side wire bundling
Details
12-09-2012
2.25
3 - Bundled wires behind panel
Details
12-08-2012
2.20
Soldered roll trim wire in wing & riveted aileron
Details
12-06-2012
1.50
Rewired roll trim servo and fixed pitch trim LED
Details
12-02-2012
1.75
3 - Reattached aileron trim wire
Details
12-02-2012
1.50
2 - Installed magnetic current sensor
12-02-2012
2.50
1 - Completed wing root connectors
Details
12-01-2012
5.75
Wing connector wiring and misc.
Details
11-29-2012
2.00
2 - Wired GPS to ELT connection
Details
11-29-2012
2.20
1 - Connected OAT and finished cabin wire routing
11-28-2012
2.50
1 - Wired GPS to ELT at ELT end
Details
11-27-2012
3.50
2 - Wired roll trim, added 2nd OAT and misc.
Details
11-27-2012
2.40
1 - Soldered Dsub connections to flap LED
Details
11-26-2012
2.20
Wired flap position sensor & routed wires
Details
11-25-2012
2.25
Added panel LED for flap setting
Details
11-12-2012
0.75
2 - Connected RS232 #1 from V10 to Voyager
Details
11-11-2012
5.00
Wired RDACs to Voyager and XTreme
Details
11-10-2012
1.00
3 - Connected PTT for pilot and copilot to grip
11-10-2012
2.00
2 - Installed auxiliary & headphone jacks
Details
11-10-2012
2.00
1 - Connect RDAC, IOEX, Fuel press, & flow to pwr
Details
11-06-2012
1.00
Connected RDAC to Voyager and XTreme
Details
11-05-2012
2.50
Installed GPS antennas
Details
11-04-2012
4.50
2 - Installed V10 Comm Radio
Details
11-04-2012
2.25
1 - Wired ignition/fuel switch and trim LED
Details
11-03-2012
5.75
Connected panel and control cables
Details
11-02-2012
5.25
Finished switch wiring and installed panel
Details
11-01-2012
3.50
Wired pitot and XTreme & made labels
Details
10-31-2012
1.50
2 - Wired power to all remaining switches
Details
10-31-2012
0.50
1 - Wired transponder
Details
10-30-2012
2.00
2 - Wired Voyager and EFIS warning light
Details
10-30-2012
1.25
1 - Wired OV warning light
Details
10-29-2012
1.25
Wired V-10 comm switch and GMA 240 Audio
Details
10-28-2012
7.50
Labeled cockpit wires and started switch wiring
Details
07-29-2012
5.00
More wiring
Details
07-28-2012
7.50
Wiring marathon
Details
07-24-2012
2.50
Routed dual stick grip cables
Details
07-22-2012
3.00
Installed SP-2 magnetometer
Details
07-19-2012
3.25
Shimmed SP-4 & re-routed CHT leads
Details
07-18-2012
2.10
Installed SP-4 and RDAC X ground buss
Details
07-17-2012
0.50
Fabricated insulated common FWF ground strip
Details
07-16-2012
0.50
1 - Connected oil pressure sender
Details
07-14-2012
4.50
Installed EGT probes and wired RDAC X
Details
06-25-2012
1.25
Installed CHT probes
Details
06-24-2012
0.40
Installed OAT sensor
Details
06-23-2012
4.25
2 - Began RDAC wiring
Details
05-20-2012
1.00
1 -Reinstalled control cables into panel
Details
05-19-2012
2.50
Resumed wiring
Details
01-21-2012
0.00
2 - Routing information
Details
01-21-2012
85.00
1 - Mounted antennas and routed coax
Details
12-03-2011
4.00
Mounted busses, OV protection and EFIS access.
Details
10-30-2011
4.75
Wired main power distribution and ground
Details
10-22-2011
0.75
2 - Connected to battery contactor
Details
10-22-2011
3.75
1 - Made cover for channel and routed battery wire
Details
09-28-2011
3.00
Installed instruments in panel
Details
09-26-2011
2.50
Primed and painted panel and tested stick wiring
Details
09-25-2011
2.50
Painted panel then stripped it
Details
09-24-2011
0.00
3 - Test fit panel instruments
Details
09-24-2011
4.00
2 - Painted panel, baffle seal and camloc work
Details
09-24-2011
2.25
1 - Transponder frame secured and panel primed
Details
09-23-2011
1.00
2 - Installed camloc in map box door
Details
09-23-2011
4.50
1 - Riveted panel and map box
Details
09-22-2011
2.50
Installed map box door
Details
09-21-2011
1.00
Cut out for Extreme EFIS
Details
09-19-2011
1.50
Installed trim indicator and ELT button
Details
09-19-2011
2.50
Drilled holes for panel switches and LEDs
Details
09-18-2011
3.75
Installed Voyager, vents and DC outlets
Details
09-18-2011
4.75
Installed audio panel
Details
09-17-2011
6.00
Installed transponder
Details
09-17-2011
2.00
Installed passenger side stick grip
Details
09-16-2011
4.00
Installed pilot side stick grip
Details
09-15-2011
2.75
Installed map box
Details
09-14-2011
2.00
Carb heat passthrough & panel reinforcement
Details
09-07-2011
2.00
Laid out panel design
Details
10-24-2009
3.00
Started instrument placement
Details
12-01-2007
0.00
AOA port location determined
Details
SITE NAVIGATION
Contact Builder
Zodiac CH 650 Home
Category
# Logs
# Hours
All
1084
3152
Avionics
77
284
Empennage
93
231
Engine
87
293
Fuselage
306
915
Miscellaneous
132
294
None
2
Planning
22
21
Shop Supplies
1
2
Tools
22
4
Total Hours
32
Wings
296
1103
Work Area
14
5