Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
Wings
Work Logs Found:
92
Category Work Time:
519 Hours
Date
Hours
Work Log Summary
Details
07-13-2008
4.00
Completed the wings
Details
07-12-2008
6.00
Attached LH Flap
Details
07-06-2008
2.00
Attached LH aileron
Details
07-05-2008
8.00
Riveted LH wing bottom skins
Details
06-29-2008
6.00
Attached RH flap
Details
06-07-2008
4.00
Attached RH aileron
Details
06-01-2008
8.00
Riveted RH wing bottom skins
Details
05-31-2008
6.00
Installed pitot line and aileron bellcranks
Details
05-24-2008
6.00
Riveted flap braces & made short aileron pushrods
Details
05-18-2008
8.00
Primed wing bottom skins & rivet aileron pushrods
Details
05-17-2008
6.00
Deburred and dimpled wing bottom skins
Details
05-04-2008
4.00
Drilled aileron pushrods & prep bottom skins
Details
05-03-2008
8.00
Installed aileron brackets & gap fairings
Details
04-27-2008
5.00
Completed the RH flap
Details
04-26-2008
6.00
Completed the LH flap
Details
04-20-2008
6.00
Primed flap components & made cradles
Details
04-19-2008
6.00
Deburred, dimpled & machine CS flap components
Details
04-13-2008
3.00
Flap brackets
Details
04-12-2008
6.00
Match drilled the LH & RH flaps
Details
04-06-2008
6.00
Riveted aileron brackets and started flaps
Details
04-05-2008
8.00
Aileron brackets, gap fairings and flap braces
Details
03-30-2008
6.00
Riveted RH top wing skins
Details
03-16-2008
5.00
Riveted LH top wing skins
Details
03-15-2008
7.00
Installed leading edges and tanks
Details
03-09-2008
7.00
Completed ailerons
Details
03-08-2008
6.00
Dimpled and primed aileron components
Details
03-02-2008
8.00
Riveted spar brackets and match drilled ailerons
Details
03-01-2008
5.00
Bent aileron skins & prep spar brackets
Details
02-24-2008
6.00
Riveted aileron stiffeners
Details
02-23-2008
7.00
Prepared aileron stiffeners and skins
Details
02-09-2008
4.00
Primed main spar flanges
Details
02-03-2008
6.00
Machine countersunk spars & rib to spar rivets
Details
02-02-2008
4.00
Deburred and dimpled RH wing skeleton
Details
01-27-2008
6.00
Riveted the leading edges
Details
01-26-2008
8.00
Primed the leading edges and wing top skins
Details
01-20-2008
3.00
Machine countersunk top left main spar
Details
01-20-2008
5.00
Deburred and dimpled LH & RH wing top skins
Details
01-19-2008
4.00
Leak tested both tanks
Details
01-19-2008
4.00
Deburred and dimpled LH wing skeleton
Details
01-13-2008
6.00
Installed RH tank baffle and inspection cover
Details
01-12-2008
6.00
Installed LH tank baffle and inspection cover
Details
01-11-2008
2.00
Prepared tank baffles and Z brackets
Details
01-08-2008
3.00
Riveted LH tank outboard rib
Details
01-08-2008
3.00
Fabricated RH tank fuel pick-up tube
Details
01-07-2008
6.00
Installed inboard sender plates in both tanks
Details
01-06-2008
3.00
Riveted RH tank outboard rib
Details
01-06-2008
4.00
Riveted LH tank inboard rib
Details
01-05-2008
3.00
Riveted RH tank inboard rib
Details
01-05-2008
3.00
Installed vent lines in both tanks
Details
01-04-2008
4.00
Finished RH tank interior ribs
Details
01-03-2008
5.00
Riveted RH tank interior ribs
Details
01-02-2008
3.00
Fay-sealed RH tank interior ribs
Details
01-02-2008
3.00
Deburred and dimpled both leading edges
Details
12-31-2007
4.00
Finished LH tank interior ribs
Details
12-30-2007
6.00
Riveted LH tank interior ribs
Details
12-29-2007
5.00
Fay-sealed LH tank Interior ribs
Details
12-02-2007
6.00
Sealed tank end rib fittings
Details
11-25-2007
7.00
Riveted right tank stiffeners, fuel cap and drain
Details
11-24-2007
7.00
Riveted left tank stiffeners
Details
11-18-2007
6.00
Tank end rib preperation
Details
11-17-2007
8.00
Dimpled tank skins and ribs
Details
11-11-2007
5.00
Scuffed the internal tank rivet lines
Details
11-10-2007
8.00
Tank capacitive fuel sender plates and trap door
Details
11-04-2007
5.00
RH tank access cover, fuel cap flanges & tank skin
Details
11-03-2007
5.00
Match drilled RH tank stiffeners, Cap and drain
Details
10-28-2007
8.00
Assembled and match drilled the RH tank
Details
10-27-2007
4.00
Match drilled the RH wing leading edge
Details
10-27-2007
4.00
Fitted the RH tank Z-brackets
Details
10-14-2007
6.00
Assembled the RH wing leading edge
Details
10-13-2007
8.00
Tank attach angles & LH access cover
Details
10-07-2007
5.00
Match drilled LH tank stiffeners, Cap and drain
Details
10-06-2007
8.00
Match drilled LH Tank
Details
09-30-2007
8.00
Assembled the LH tank
Details
09-29-2007
3.00
Match drilled the LH wing leading edge
Details
09-29-2007
5.00
Fitted the LH tank Z-brackets
Details
09-24-2007
5.00
Assembled the LH wing leading edge
Details
09-23-2007
6.00
Fitted the RH wing skins
Details
09-22-2007
5.00
Fitted the LH wing skins
Details
09-16-2007
6.00
Adjusted wing skeletons
Details
09-15-2007
8.00
Manufactured wing jigs
Details
09-09-2007
2.00
Completed riveting the wing main rib/spar assembly
Details
09-08-2007
8.00
Started riveting the wing main rib/spar assembly
Details
09-02-2007
6.00
Primed the wing main ribs
Details
09-01-2007
7.00
Match drilled the wing main rib/spar assembly
Details
08-30-2007
5.00
Fluted the wing main ribs
Details
08-26-2007
8.00
Deburred the wing ribs
Details
08-18-2007
8.00
Riveted the wing rear spars
Details
08-12-2007
9.00
Match drilled the wing rear spars
Details
08-10-2007
6.00
Made the wing tie-down brackets
Details
08-09-2007
8.00
Riveted platenuts to wing spars
Details
08-05-2007
6.00
Completed countersinking wing main spars
Details
08-04-2007
8.00
Started countersinking wing main spars
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.