Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
Wings
11-25-2007
< Previous Log Entry
Next Log Entry >
Date:
11-25-2007
Number of Hours:
7.00
Manual Reference:
7-7
Brief Description:
Riveted right tank stiffeners, fuel cap and drain
Cleaned the stiffeners, rivets and skin with MEK and strategically placed electrical tape on areas to be kept clean from tank sealant.
Riveted the stiffeners to the skin and dabbed a bit of sealant over every rivet head.
Sealed and riveted the fuel cap and drain flanges on both tanks.
Stiffeners before removing tape
Fuel cap flange
Drain flange
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
6
108
Canopy
2
288
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.