Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
Wings
10-7-2007
< Previous Log Entry
Next Log Entry >
Date:
10-7-2007
Number of Hours:
5.00
Manual Reference:
7-5
Brief Description:
Match drilled LH tank stiffeners, Cap and drain
Match drilled the stiffeners, fuel cap flange and drain flange to the tank skin.
Deburred and dimpled the stiffeners.
Deburred the the holes in the tank ribs
Match drilling stiffeners
Fuel cap flange
Drain flange
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
6
108
Canopy
2
288
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.