Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
RV-7
Fairing
Work Logs Found:
24
Category Work Time:
54 Hours
Date
Hours
Work Log Summary
Details
02-21-2012
2.00
More pin holes
Details
01-26-2012
4.00
Horizontal stab fairings
Details
01-22-2012
2.00
Rear saddle nut plates
Details
01-22-2012
2.00
More filling and sanding
01-21-2012
1.00
More filling and sanding
01-20-2012
3.00
Working on Fairings
01-20-2012
3.00
Empenage fairings
07-18-2011
1.50
Wheel nut and intersection fairing
Details
07-17-2011
1.00
Right wheel fairing
Details
05-15-2011
2.00
Re-installed wheels spats
05-15-2011
0.00
Left wheel spats installed
Details
05-08-2011
3.00
Sanded the wheel spats and fairings
Details
05-07-2011
3.00
Glued lower intersections fairings to wheel spats
Details
05-01-2011
2.50
Left intersection fairings
Details
04-30-2011
6.00
Right Intersection fairings
04-30-2011
0.00
Left lower intersection fairings
04-26-2011
4.00
Left wheel spat
Details
04-25-2011
1.00
Finished left wheel spat
Details
04-17-2011
0.00
2. Fitting right wheel spat
Details
04-17-2011
3.00
1. Fitting right wheel spat
04-16-2011
0.70
Level fuselage
Details
04-10-2011
3.00
Left wheel fairing
Details
04-09-2011
4.00
Right gear leg fairing
Details
07-09-2010
2.00
Installed rudder cable fairings
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
470
2573
Ailerons
9
38
Avionics
12
110
Brakes
5
14
Canopy
33
141
Center Fuselage
26
116
Centre spar
3
37
Cowling
20
109
Empennage
65
231
Engine
24
114
Fairing
24
87
Final Assembly
6
39
Firewall
14
66
Flap assembly
6
30
Flight testing
2
25
Front Fuselage
5
115
Fuselage
34
176
FWF
2
16
Instrument panel
9
50
Miscellaneous
10
142
None
4
13
Painting
25
219
Prop
3
7
Rear turtle deck
6
38
Roll Bar
1
16
Rudder
3
3
Seats
2
8
Spinner
3
4
Vertical Stab
5
14
Wheels and brakes
1
41
Wings
108
554
Zodiac 601 XL Home
Copyright © 2001-2024 Matronics. All Rights Reserved.