Powered By Kitlog Pro v2.0
Doug's Web Site
CH 750 Cruzer
Brakes
Work Logs Found:
38
Category Work Time:
126 Hours
Date
Hours
Work Log Summary
Details
11-02-2018
5.00
Weighed the plane
Details
07-06-2018
3.00
Bled brakes
Details
04-23-2018
4.50
Bled the brakes, top skin install
Details
12-06-2017
2.00
Reinstalled Matco brake cylinders
Details
11-12-2017
2.50
Removed brake cylinders for upgrade
Details
10-24-2017
2.00
Mounted the console top
Details
09-27-2017
3.00
Wiring
Details
09-21-2017
3.00
Wired fuel low level system
Details
09-19-2017
3.50
Organized wires, mounted stick grips
Details
09-17-2017
3.00
Wired console
Details
09-10-2017
2.50
Wired some switches
Details
08-27-2017
1.50
Labeled the panel
Details
08-26-2017
3.50
Covered console with carbon fiber vinyl
Details
08-25-2017
4.00
Added nut plates to console
Details
08-23-2017
2.50
Drilled console cover
Details
08-22-2017
4.00
Initial fit of instrument panel in aircraft
Details
08-20-2017
1.00
Added switches
Details
08-18-2017
2.00
Installed map box
Details
08-17-2017
4.00
Installed avionics on panel
Details
08-16-2017
4.00
Covered instrument panel
Details
08-08-2017
3.00
Still working on instrument panel
Details
08-06-2017
3.00
Worked on instrument panel
Details
08-04-2017
3.50
Installed GPS puck
Details
08-03-2017
5.50
Worked on instrument panel
Details
07-11-2017
3.50
Installed grounding block
Details
06-20-2017
4.00
Finished flap sensor and wired
Details
06-19-2017
3.50
Installed Ray Allen flap sensor
Details
06-09-2017
2.50
Installed EXBus II panel
Details
06-07-2017
2.50
Added relays to avionics shelf
Details
05-31-2017
6.00
Pulled the pilot side wiring
Details
05-30-2017
6.00
Ran wire down the Pax side channel
Details
05-29-2017
5.00
Knobs on Pax side avionics shelf
Details
05-24-2017
1.50
Installed nutplates on Pax avionics shelf
Details
05-23-2017
4.50
Installed avionics on pilot side shelf
Details
05-22-2017
3.00
Finished both avionics shelves
Details
05-21-2017
2.50
Passenger side Avionics shelf
Details
05-20-2017
4.50
Avionics shelf
Details
05-09-2017
1.00
Christmas in May
Details
SITE NAVIGATION
Contact Builder
CH 750 Cruzer Home
Category
# Logs
# Hours
All
323
1149
Aircraft
1
5
Avionics
5
16
Avionics
16
61
Avionics
38
126
Brakes
38
126
Controls
20
72
Cowl
16
61
Doors
11
38
Empennage
7
26
Engine
29
112
Fuel
9
32
Fuselage
50
184
Miscellaneous
3
8
W&B
38
126
Windows
4
14
Wings
11
45
Wiring
27
97
Copyright © 2001-2024 Matronics. All Rights Reserved.