Brief Description: Tech Counselor Visit / Panel Work
My Tech Counselor visited today for the (hopefully) last time. He said that I had one of the cleanest engine and baffle installations he's seen. No issues that I wasn't already aware of, so it's just closing out the punch list now.
Continued work on cleaning up the back of the panel. Played around with reduced-diameter pitot-static lines since the Enigma uses a smaller-diameter line from the pitot tube (1/8" vs 1/4").
Finished lengthening the backup battery leads that prevented me from routing that harness along the fuselage. Cleaned up lighting wire routings; stripped in preparation for installing the molex connectors.