KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  2-24-2011
Number of Hours:  1.30
Manual Reference:  aerovee
Brief Description:  Engine FWF Wiring

Installed EGT probes into exhaust stacks.

Routed / re-routed wires on the right side of the engine. Relocated the oil pressure sending unit wire from on top of the engine over to the side so that it can be braced against the intake manifold.

Started wiring CHTs to the RDAC.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.