Powered By Kitlog Pro v2.0
RV-7 Construction Log
170B
None
Work Logs Found:
81
Category Work Time:
0 Hours
Date
Hours
Work Log Summary
Details
07-13-2016
0.00
Paul Wood's Visit
07-06-2016
0.00
Masking for Trim
Details
06-23-2016
0.00
Paint Basecoat 2
06-23-2016
0.00
Paint Basecoat 1
06-17-2016
0.00
Strut Fittings
Details
05-19-2016
0.00
Mena Visit 2
Details
05-19-2016
0.00
Mena Visit 1 - Paint Stripping
Details
04-22-2016
0.00
Lower Cowl Fitting
Details
04-19-2016
0.00
Upper Cowl Fitting
Details
03-29-2016
0.00
Engine Mount
Details
03-29-2016
0.00
Door Work
Details
03-07-2016
0.00
Left Lower Cowl Skin
Details
01-07-2016
0.00
Cabin Heater Adapter 2
01-07-2016
0.00
Cabin Heater Adapter 1
Details
01-06-2016
0.00
Door Fitting and Remounting 2
01-06-2016
0.00
Door Fitting and Remounting 1
Details
11-12-2015
0.00
Wings Remounted!
11-11-2015
0.00
Stabilizers mounted
Details
11-10-2015
0.00
Front Spar Carrythrough
Details
11-02-2015
0.00
Tail Pull Handle
Details
11-02-2015
0.00
Rudder Damage
Details
11-02-2015
0.00
Baggage Door Installation
10-31-2015
0.00
Tail Surface Repairs
Details
10-31-2015
0.00
Fuselage and Wing Pre-Paint
Details
10-15-2015
0.00
Mena Visit 4 - Fabricating new left wing leading e
Details
10-15-2015
0.00
Mena Visit 3
10-15-2015
0.00
Mena Visit 2
10-15-2015
0.00
Mena Visit 1
Details
10-01-2015
0.00
New Firewall Installed
09-30-2015
0.00
Right Wing Skinning Complete
09-22-2015
0.00
Right Wing in the Jig
09-22-2015
0.00
Fuselage out of the jig.
09-04-2015
0.00
Fuselage Progress 3
09-04-2015
0.00
Fuselage Progress 2
09-04-2015
0.00
Fuselage Progress 1
08-21-2015
0.00
Propeller
Details
07-11-2015
0.00
Forward Fuselage
07-11-2015
0.00
Aft Fuselage Mated to Cabin 3
07-11-2015
0.00
Aft Fuselage Mated to Cabin 2
07-11-2015
0.00
Aft Fuselage Mated to Cabin 1
04-24-2015
0.00
Aft Fuselage Progress
04-21-2015
0.00
Interior of Aft Fuselage
04-16-2015
0.00
Aft Fuselage Mated to Cabin
04-14-2015
0.00
Fuselage Progress
03-31-2015
0.00
Cleaning up the Original Tailcone
03-26-2015
0.00
Visit to Mena, Day Two 2
03-26-2015
0.00
Visit to Mena, Day Two 1
03-25-2015
0.00
Visit to Mena, March 2015 6
03-25-2015
0.00
Visit to Mena, March 2015 5
03-25-2015
0.00
Visit to Mena, March 2015 4
03-25-2015
0.00
Visit to Mena, March 2015 3
03-25-2015
0.00
Visit to Mena, March 2015 2
03-25-2015
0.00
Visit to Mena, March 2015 1
03-05-2015
0.00
Aft Fuselage Fixture
Details
02-15-2015
0.00
Baggage Door
Details
01-16-2015
0.00
Fabricating New Top Rear Cabin Skin
01-13-2015
0.00
More Fuselage Disassembly
01-06-2015
0.00
New Firewall Received in Mena
12-30-2014
0.00
Replacement Cowl from Alaska
Details
12-01-2014
0.00
Replacement Cowl from Alaska
Details
11-26-2014
0.00
Right Intake Manifold
Details
11-24-2014
0.00
Cast Engine Parts Back from Divco
11-06-2014
0.00
Firewall Removal
11-04-2014
0.00
Fuselage Jigging
Details
11-03-2014
0.00
Fuselage Jig
Details
10-28-2014
0.00
Airframe Disassembly 3
10-28-2014
0.00
Airframe Disassembly 2
10-28-2014
0.00
Airframe Disassembly 1
10-07-2014
0.00
Loading for the Trip to Mena 2
10-07-2014
0.00
Loading for the Trip to Mena 1
10-01-2014
0.00
Insurance Settlement
Details
07-22-2014
0.00
Photos for Mountain Airframe 3
07-22-2014
0.00
Photos for Mountain Airframe 2
07-22-2014
0.00
Photos for Mountain Airframe 1
Details
07-20-2014
0.00
Damage Overall
07-20-2014
0.00
Damage Details 3
07-20-2014
0.00
Damage Details 2
07-20-2014
0.00
Damage Details 1
07-20-2014
0.00
Cleaning Up The Mess 2
07-20-2014
0.00
Cleaning Up The Mess 1
07-19-2014
0.00
Introduction
Details
SITE NAVIGATION
Contact Builder
170B Home
Category
# Logs
# Hours
All
82
7
Miscellaneous
1
7
None
81
RV-7 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.