KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  11-10-2015
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Front Spar Carrythrough

The front spar carrythrough was inspected and found to be sound. Mountain Ariframe applied some epoxy primer to forestall possible future corrosion.
' style=

Rear Carrythrough

Rear Carrythrough

' style=

Front Carrythrough

Front Carrythrough

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.