Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
RV-7
Cowling
Work Logs Found:
20
Category Work Time:
75 Hours
Date
Hours
Work Log Summary
Details
05-27-2012
6.00
Plenum bump and nut plates
Details
05-26-2012
5.00
Fitting cooling plenum
Details
05-19-2012
2.00
Stainless cowl pins
Details
02-20-2012
1.50
Top and bottom cowl done
02-19-2012
0.00
Pin holes
Details
02-19-2012
4.50
Filling pin holes
Details
02-18-2012
4.00
Sanding and Re-priming all the fibreglass parts
02-16-2012
10.00
Pinholes
Details
02-03-2012
2.00
Applied epoxy and filler to the cowl, lots of pin
07-17-2011
1.00
Internal eyebrows
Details
07-16-2011
8.00
Oil door
Details
07-10-2011
4.50
Hinges
Details
07-06-2011
4.40
Riveted hinge and installed camlocs
Details
07-01-2011
9.00
Cowl hinge installation
Details
06-26-2011
5.00
Top and bottom cowl install
Details
06-11-2011
3.50
3. Top cowl hinge
06-11-2011
0.50
2. Top cowl cut
06-11-2011
2.50
1. Top cowl
07-26-2008
0.00
Right elevator skeleton
04-16-2008
1.50
Squeezed rivets for the elevator hinge
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
470
2573
Ailerons
9
38
Avionics
12
110
Brakes
5
14
Canopy
33
141
Center Fuselage
26
116
Centre spar
3
37
Cowling
20
109
Empennage
65
231
Engine
24
114
Fairing
24
87
Final Assembly
6
39
Firewall
14
66
Flap assembly
6
30
Flight testing
2
25
Front Fuselage
5
115
Fuselage
34
176
FWF
2
16
Instrument panel
9
50
Miscellaneous
10
142
None
4
13
Painting
25
219
Prop
3
7
Rear turtle deck
6
38
Roll Bar
1
16
Rudder
3
3
Seats
2
8
Spinner
3
4
Vertical Stab
5
14
Wheels and brakes
1
41
Wings
108
554
Zodiac 601 XL Home
Copyright © 2001-2024 Matronics. All Rights Reserved.