Powered By Kitlog Pro v2.0
Ron Lendon's Aircraft Mfg.
Zodiac CH 601 XL
Tools
Work Logs Found:
85
Category Work Time:
185 Hours
Date
Hours
Work Log Summary
Details
11-14-2011
3.00
Made a ClampTite tool
Details
06-23-2011
4.00
Tune up the wheels of the HF English Wheel
Details
04-27-2011
1.00
Make tool for nut plate hole spacing
Details
02-27-2011
2.00
Seat buck
Details
02-26-2011
1.50
Seat buck for foam fitting
Details
12-24-2010
2.00
Made 10 degree rivet button for getting in tight p
11-12-2009
1.00
Make boring bar to size distributor bushings
Details
11-10-2009
3.00
Make boring bar to size distributor bushings
Details
11-06-2009
1.00
Making finish swage tool 3 of 3
Details
11-06-2009
1.00
Making finish swage tool 2 of 3
Details
11-06-2009
1.00
Making finish swage tool 1 of 3
Details
11-04-2009
2.00
Swage tools for exhaust stubs
Details
10-27-2009
2.00
Make tool for the recess
Details
07-21-2009
1.00
Add center brace to be able to grab wing stand
Details
07-11-2009
2.00
Glue gussets on wing stand
Details
07-10-2009
5.50
Build Wing Stand from CH601.org
Details
04-11-2009
1.00
Cut center recess for spinner/prop hub
Details
03-23-2009
0.50
Removed Tape and prep for shipping
Details
03-21-2009
3.00
Slot base and backbone, layout/trim stations
Details
03-21-2009
1.50
Blended several stations and re-made one
Details
03-20-2009
1.50
Lay station locations for bottom of nose bowl
Details
03-19-2009
1.00
Cut stations for the bottom side
Details
03-04-2009
1.00
Layout transition stations
Details
03-04-2009
0.20
Layout transition line of shapes.
Details
03-04-2009
1.00
Final fitting of air inlet disks
Details
03-04-2009
1.00
Blend back bone to air inlets
Details
03-03-2009
1.50
Blend stations to disks
Details
02-28-2009
3.50
Set disks down into frame backbone
Details
02-28-2009
1.00
Blend stations into the disks
Details
02-26-2009
1.00
Resizing air inlets.
Details
02-24-2009
1.00
Radius the air inlets
02-23-2009
1.50
Working small disks for air inlet
Details
02-22-2009
1.60
Make small disks from MDF for inlets
Details
02-21-2009
2.00
Radius edge behind spinner
Details
02-18-2009
1.50
Trim stations for top of Nose Bowl
Details
02-16-2009
1.00
Extend the lines on the stations
Details
02-15-2009
1.00
Transfer shape to stations
Details
02-15-2009
1.00
Grid bottom to transfer shape to stations
Details
02-14-2009
3.50
Making top stations for nose bowl station buck
Details
02-14-2009
1.00
Main center station (backbone)
Details
02-10-2009
1.50
Make basefor station buck
Details
02-09-2009
1.50
Stabilize nose bowl to make templates
Details
02-08-2009
1.00
Make Aluminum WW nose bowl
Details
11-20-2008
2.00
Make gust locks for wing storage
Details
09-26-2007
1.00
Made device to hold flap/aileron together
Details
08-01-2007
2.00
Miller Syncrowave 200 arrived today
Details
06-10-2007
3.00
Polish surface of the English Wheel tools
Details
06-05-2007
2.50
Clean and repair English Wheel
Details
05-29-2007
1.00
Assembled English Wheel
Details
02-07-2007
4.00
Wing Rotation Device
Details
12-03-2006
2.00
Harbor Freight Sheet Metal Fab Kit
Details
10-12-2006
0.50
Setup arbor press for Riveting
Details
09-21-2006
2.00
Deburr and prep for paint.
Details
09-12-2006
2.00
Fly Cutter & fixture for cutting lightening holes
Details
06-21-2006
2.00
Stabilizer End Cap Tool
Details
06-19-2006
2.00
Stabilizer End Cap Tool
Details
06-18-2006
2.00
Stabilizer End Cap Tool
Details
06-16-2006
3.00
Stabilizer End Cap Tool
Details
06-15-2006
2.00
Stabilizer End Cap Tool
Details
06-14-2006
1.00
Stabilizer End Cap Tool
Details
03-06-2006
2.00
Put wheels on leaf brake
Details
02-03-2006
2.00
Modify Nose Pieces on Air Riveter
Details
01-31-2006
2.00
Made steel cleco risers for assembly
Details
12-20-2005
2.00
Poly sealed the Forms. Ready for Metal.
Details
12-19-2005
3.00
Working on Forms
Details
12-16-2005
2.00
Working on Forms
Details
12-15-2005
3.00
Made Middle and Aft bulkheads from updated 6-B-12
Details
11-30-2005
3.00
Making Forms.
Details
11-29-2005
3.00
Left e-mail msg on Zenith site
Details
11-28-2005
6.00
Working on Forms. Missing Dimensions.
Details
11-26-2005
3.00
Finished Flanging tools. On lathe.
Details
11-23-2005
5.00
Finished Punches and started roughing Dies
Details
11-22-2005
3.00
Flanging tools. Punch 115 & 95
Details
11-21-2005
2.50
Making rib lightening hole flanging tools.
Details
11-17-2005
4.00
Made Rear rib forms 7, 8, & 9
Details
11-16-2005
4.00
Made Rear rib forms 2, 4, & 6
Details
11-12-2005
3.00
Discovered I made a mistake laying out Rear rib 2
Details
11-11-2005
4.00
Got confirmation from Zenith
Details
11-10-2005
7.00
Have missing dimensions
Details
11-09-2005
4.00
Cutting & Radius edges of forms
Details
11-04-2005
3.00
Rough Cut MDF for Forms
Details
11-04-2005
2.00
Layout forms
Details
11-04-2005
1.00
Layout Forms
Details
11-02-2005
3.00
Make frame for cutting large peices
Details
10-28-2005
4.00
Plywood Forms
Details
SITE NAVIGATION
Contact Builder
CZAW CH601XL Home
Light Sport Recumbent Bike Home
Zodiac CH 601 XL Home
Category
# Logs
# Hours
All
1605
3634
Avionics
19
36
Electrical
22
49
Empennage
91
225
Engine
181
358
Facilities
57
177
Flight Testing
12
17
Fuselage
533
1137
Maintenance
8
9
Miscellaneous
35
-74
None
6
196
Nose Gear
7
10
Planning
21
47
Shop Supplies
6
22
Tools
85
185
Wings
457
1054
ZU601XLB
65
186
Copyright © 2001-2024 Matronics. All Rights Reserved.