KitLog pro

Powered By Kitlog Pro v2.0

Michaels Sonex #145 log
' style=
Date:  8-6-2015
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Installing the engine

I did a magneto timing check today which turned out great, the timing is still set exactly at 28 degrees BTDC,
I did not expect it to have changed since everything around the crankshaft and flywheel was rebuilt exactly as before, but I had to check anyway.
After that it was time to hang the engine back onto the plane, easy job, and then I started connecting everything back up. I'm about half way with that now.
I did remove my oil separator as well, somone of the vw aircraft engines forum told me it is a really bad idea to have one like mine made with a scoth brite pad in it. the pad will release abbrasive particles which will wear the engine very quickly. Back to the drawing board on that one.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.