KitLog pro

Powered By Kitlog Pro v2.0

Michaels Sonex #145 log
Work Logs Found: 1059
Category Work Time: 1532 Hours
 Date
Hours
Work Log Summary

Details

 11-07-2015
1.00
First Flight!
Details
     

 11-02-2015
0.00
Certificate of airworthiness arrived!
Details

 10-28-2015
4.00
Airworthyness inspection
Details
       

 10-23-2015
2.00
Compass calibration
Details
     

 10-19-2015
1.00
TC inspection
Details

 10-17-2015
1.50
Fuel tank gauge calibration
Details

 10-14-2015
2.00
Pitot/Static & Transponder checks
Details

 10-10-2015
3.00
Oil change / temperature probe swap
Details

 10-03-2015
4.00
Weight and Balance
Details

 09-28-2015
5.00
RPM sensor, aileron adjustments, ...
Details
     

 09-20-2015
6.00
RPM sensor work, canopy cracks.
Details
       

 09-06-2015
10.00
Engine tuning, RPM reading issues, flap & aileron
Details

 08-23-2015
12.00
First engine start!
Details

 08-14-2015
4.00
Installing the ailerons
Details
       

 08-13-2015
5.00
Installing the flaps
Details
       

 08-12-2015
3.00
Moving day!
Details
       

 08-12-2015
4.00
Installing the wings
Details
     

 08-08-2015
2.00
More engine troubles
Details

 08-06-2015
2.50
Installing the engine
Details
       

 08-05-2015
3.00
Rebuidling the engine
Details
       

 08-04-2015
2.00
Rebuilding the engine
Details

 08-03-2015
2.50
Rebuilding the engine
Details
     

 08-02-2015
6.00
Rebuilding the engine
Details
     

 08-01-2015
4.00
Rebuilding the engine
Details
       

 07-03-2015
0.00
Engine troubles
Details

 07-01-2015
2.00
Engine troubles
Details
       

 06-25-2015
1.00
installing the prop
Details
     

 06-23-2015
0.00
Some pictures
Details
       

 06-23-2015
1.00
Installing the vents
Details
       

 06-22-2015
1.50
Trim cable installation
Details
       

 06-20-2015
1.00
Installing the rudder and tail wheel push rod
Details
       

 06-19-2015
2.00
Installing the V-Tail
Details

 06-18-2015
0.80
Installing the H-Tail
Details
     

 06-17-2015
2.50
Done painting!
Details
       

 06-16-2015
1.00
Painting the grey lines
Details

 06-15-2015
1.50
Masking
Details

 06-14-2015
1.00
Painting the red lines
Details

 06-13-2015
2.00
Masking the fuselage
Details
       

 06-11-2015
4.00
Painting the fuselage
Details
       

 06-10-2015
4.00
Priming the fuselage
Details

 06-09-2015
6.00
Rebuilding spray tent, masking, PreKote
Details
       

 06-08-2015
1.20
Painting the floor skin, fairings and cover plates
Details
     

 06-05-2015
1.00
Priming the floor skin, fairings and cover plates
Details
     

 06-04-2015
1.50
Floor skin, fairings and cover plate preparation
Details

 06-01-2015
2.20
Painting the cowl, wheel pants abd fairings
Details
       

 05-31-2015
0.70
Sanding
Details

 05-29-2015
1.50
Priming
Details

 05-28-2015
2.00
Preparing the cowling, fairings and wheel pants
Details
       

 05-26-2015
1.00
Preparing the cowling
Details
       

 05-25-2015
1.20
dipstick hole
Details
     

 05-24-2015
1.00
Vents
Details
       

 05-23-2015
2.00
Painting the right wing
Details
       

 05-19-2015
1.50
Priming the right wing
Details
     

 05-18-2015
1.50
PreKote
Details

 05-14-2015
2.00
Painting the left wing
Details
       

 05-13-2015
1.50
Priming
Details
       

 05-12-2015
0.50
Preparing the left wing
Details
       

 05-11-2015
2.00
Preparing the left wing
Details
     

 05-10-2015
2.00
Painting
Details
       

 05-08-2015
1.00
Painting
Details
       

 05-07-2015
1.20
Masking
Details
     

 05-06-2015
1.00
Masking
Details
       

 05-04-2015
2.00
Painting
Details
       

 05-02-2015
2.00
Priming the V-Stab and H-Stab
Details
       

 05-01-2015
1.00
PreKote
Details

 05-01-2015
2.00
Finished H-Stab, prepared V-Stab
Details

 04-30-2015
1.00
Preparing the H-Stab
Details
     

 04-28-2015
2.00
Sanding and painting
Details

 04-26-2015
1.50
Painting
Details

 04-25-2015
1.50
Priming
Details

 04-24-2015
0.50
PreKote
Details

 04-23-2015
2.00
Painting
Details
       

 04-22-2015
2.00
Priming
Details
       

 04-21-2015
1.00
Preparing for painting
Details
     

 04-20-2015
1.20
PreKote and fixing a mishap.
Details
       

 04-18-2015
1.00
Painting
Details

 04-13-2015
2.00
Painting
Details
     

 04-02-2015
2.00
Preparing for painting
Details
     

 03-26-2015
0.80
Tail wheel pushrod
Details
       

 03-21-2015
2.50
Baggage sling and seat belts
Details
       

 03-17-2015
1.00
Baggage sling
Details
       

 03-15-2015
0.80
Upholstery installation
Details
       

 03-14-2015
0.60
Upholstery installation
Details

 03-13-2015
0.50
Upholstery installation
Details
     

 03-12-2015
0.60
Enlarging seat sling control stick cutouts
Details
       

 03-10-2015
1.00
Finishing the wheel pants installation
Details
       

 03-08-2015
0.80
Wheel pants
Details

 03-06-2015
2.00
NACA vent design
Details
       

 03-05-2015
1.20
Wheel pants
Details

 03-03-2015
0.80
Right wheel pant installation
Details
     

 03-02-2015
1.20
Right wheel pant installation
Details

 03-01-2015
0.80
Left wheel pant installation
Details
       

 03-01-2015
0.20
Left wheel pant installation
Details
       

 02-28-2015
1.50
Left wheel pant installation
Details
       

 02-27-2015
1.00
Wheel pants
Details
     

 02-25-2015
0.80
Wheel pants
Details
     

 02-23-2015
1.50
angles
Details
       

 02-21-2015
1.50
Installing the tail fairings
Details
       

 02-19-2015
1.00
Tail fairings
Details
     

 02-17-2015
2.00
Tail fairings
Details
     

 02-15-2015
0.70
Installing the rudder cable fairings
Details
       

 02-14-2015
1.00
Cable fairings
Details
       

 02-10-2015
2.50
Rudder return springs
Details
       

 02-09-2015
2.00
Rudder cable installation
Details
     

 02-07-2015
1.00
Rudder cable installation
Details
     

 02-05-2015
2.50
Elevator pushrod and trim cable housing installati
Details
       

 02-03-2015
1.50
Control rigging
Details
       

 02-02-2015
1.20
Installing the rudder cables and trim cable housin
Details
       

 01-29-2015
0.50
Compass installation
Details
       

 01-28-2015
0.30
Exhaust installation
Details

 01-27-2015
0.30
Exhaust installation
Details
       

 01-25-2015
0.50
Main Gear Fairings
Details
       

 01-24-2015
2.50
Main Gear Fairings
Details
       

 01-20-2015
0.80
Main Gear Fairings
Details

 01-19-2015
0.80
Main Gear Fairings
Details
     

 01-16-2015
0.80
Main Gear Fairings
Details
     

 01-14-2015
0.80
Main Gear Fairings
Details
     

 01-13-2015
0.60
Main Gear Fairings
Details

 01-11-2015
0.60
Oil system
Details
       

 01-10-2015
1.50
Finished the wing tips
Details
     

 01-08-2015
1.00
Right wing tip
Details
     

 01-06-2015
0.50
Left wing tip continued
Details

 01-05-2015
1.50
Completed R wing tip installation, started L tip
Details
       

 01-04-2015
1.20
Right wing tip installation
Details
       

 01-02-2015
2.00
Right wing tip installation
Details
     

 12-30-2014
1.50
Oil filter installation
Details
       

 12-29-2014
0.80
Fuel line
Details
       

 12-28-2014
1.20
Exhaust work
Details
       

 12-26-2014
3.00
Intake manifold installation
Details
       

 12-23-2014
1.20
Installing the air/oil separator
Details
       

 12-22-2014
0.60
Installing the air/oil separator
Details
       

 12-21-2014
1.20
Making the air/oil separator
Details
       

 12-20-2014
1.00
Misc FWF work
Details
       

 12-18-2014
0.50
Done with the canopy!
Details
       

 12-16-2014
0.00
Some more canopy pictures
Details
       

 12-16-2014
1.50
Installing the canopy
Details
       

 12-15-2014
1.20
Installing the canopy
Details
       

 12-13-2014
1.00
Frame assembly
Details
       

 12-12-2014
0.70
Priming
Details
     

 12-11-2014
0.80
Making the slide handle slot
Details
     

 12-10-2014
1.50
Drilling the canopy
Details
       

 12-09-2014
1.50
Drilling the canopy
Details
       

 12-08-2014
2.00
Drilling the canopy
Details
       

 12-07-2014
0.80
Drilling the canopy
Details
       

 12-06-2014
1.00
Cutting the canopy
Details
       

 12-05-2014
0.80
Cutting the Canopy
Details

 12-04-2014
0.80
Cutting the canopy
Details
       

 12-03-2014
1.50
Cutting the canopy
Details
       

 12-02-2014
1.20
Fitting the canopy
Details
       

 12-01-2014
0.50
Forward canopy bow
Details

 11-30-2014
0.60
Forward canopy bow
Details

 11-29-2014
0.80
Cross tube
Details
     

 11-27-2014
0.50
Installing the alignment pin
Details
     

 11-26-2014
1.20
Canopy frame
Details
       

 11-25-2014
2.00
Canopy frame
Details
       

 11-24-2014
1.00
Fitting the canopy frame
Details
     

 11-23-2014
1.20
Canopy hinges, side trim and tubing
Details
     

 11-21-2014
0.60
Alignment pin
Details

 11-19-2014
0.60
Canopy gussets and lock plate assembly
Details
     

 11-18-2014
0.50
AeroCarb installation
Details
       

 11-17-2014
2.00
AeroCarb installation
Details
       

 11-15-2014
1.20
Installing the AeroCarb
Details
       

 11-14-2014
0.60
Painting
Details
     

 11-13-2014
0.60
Priming
Details
     

 11-12-2014
0.50
Intake manifold work
Details
     

 11-11-2014
0.50
Intake manifold work
Details

 11-07-2014
0.50
Intake manifold work
Details

 11-05-2014
1.50
Intake manifold installation
Details
       

 11-04-2014
0.80
Finishing the baffles
Details

 11-02-2014
0.30
Installing the oil cooler assembly
Details
       

 11-01-2014
2.00
Oil cooler baffles
Details
       

 10-29-2014
1.50
Transponder installation
Details
       

 10-26-2014
0.80
Installing the rubber seals
Details
       

 10-25-2014
0.80
Installing the rubber seals
Details
     

 10-24-2014
1.20
Making the rubber seal attach doublers
Details

 10-22-2014
0.80

Details
       

 10-21-2014
1.00
Trimming the baffles
Details

 10-20-2014
0.50
Trimming the baffles
Details
       

 10-19-2014
0.70
Re-making the aft fence baffle
Details

 10-18-2014
1.20
Re-making the aft fence baffle
Details

 10-17-2014
1.20
Intake manifold cut-out
Details

 10-15-2014
1.00
Intake manifold cut-out
Details
     

 10-14-2014
0.60
Installing the side baffle attach angles
Details
     

 10-13-2014
0.50
Oil cooler baffles and attach angles
Details
       

 10-12-2014
1.00
Oil cooler baffles
Details
       

 10-11-2014
0.70
Remaining baffles
Details
     

 10-10-2014
1.00
Forward side baffles
Details
       

 10-08-2014
1.00
Aft fence baffle
Details
     

 10-06-2014
0.00
More cowling pictures
       

 10-06-2014
0.00
More cowling pictures
       

 10-06-2014
0.80
Cowling done (for now)
Details
       

 10-05-2014
0.40
Fibreglass finishing
Details

 10-03-2014
0.60
Fibreglass finishing
Details

 10-02-2014
1.00
Fibreglass finishing
Details

 09-30-2014
0.50
Fibreglass finishing
Details
     

 09-28-2014
2.50
Fuel filler door
Details
       

 09-27-2014
0.50
More fiberglass work
Details
       

 09-26-2014
0.50
Fiberglass work
Details

 09-25-2014
1.00
Installing the exhaust tunnels
Details

 09-24-2014
0.60
Exhaust tunnel lips
Details
       

 09-23-2014
0.60
Exhaust tunnel lips
Details

 09-22-2014
0.70
Installing the exhaust tunnels
Details
       

 09-21-2014
0.70
Installing the exhaust tunnels
Details
       

 09-20-2014
0.50
Making the exhaust tunnels
Details
       

 09-18-2014
0.60
Making the exhaust tunnels
Details
       

 09-17-2014
0.70
Installing the upper cowling attach tab
Details
       

 09-16-2014
0.50
Making the upper cowling attach tab
Details

 09-15-2014
1.50
Air intake holes
Details
       

 09-13-2014
0.50
fibreglass work
Details
     

 09-12-2014
1.00
fibreglass work
Details

 09-11-2014
0.60
fibreglass work
Details

 09-09-2014
0.80
fibreglass work
Details
       

 08-14-2014
0.50
Fitting the cowling
Details
       

 08-13-2014
2.00
Riveting the hinges
Details
       

 08-12-2014
2.00
Priming and countersinking
Details

 08-11-2014
0.40
Updrilling the hinges
Details
     

 08-10-2014
0.50
Bottom hinge installation
Details
       

 08-09-2014
0.50
Bottom hinge installation
Details

 08-08-2014
0.80
Bottom hinge installation
Details
     

 08-03-2014
1.50
Top hinge installation
Details
       

 08-01-2014
1.00
Filler box cut-out
Details

 07-31-2014
0.60
Fitting the cowling
Details
       

 07-29-2014
0.70
Fitting the RH Cowling
Details

 07-27-2014
1.50
Fitting the RH Cowling
Details
       

 07-26-2014
1.00
Fitting the RH Cowling
Details

 07-25-2014
1.00
Fitting the RH Cowling
Details

 07-24-2014
0.00
Prop arrived
Details
       

 07-23-2014
1.20
Fitting the RH Cowling
Details

 07-22-2014
2.00
Fitting the LH Cowling
Details
       

 07-20-2014
1.50
Fitting the LH Cowling
Details
       

 07-19-2014
1.00
Fitting the LH Cowling
Details
       

 07-18-2014
1.50
Making the alignment spacer
Details
       

 07-16-2014
2.20
Installing the cowling
Details
       

 07-13-2014
0.20
Installing the engine
Details
       

 07-11-2014
1.00
Installing the engine
Details
       

 07-10-2014
1.20
Fueld vent line
Details
       

 07-08-2014
0.50
Fuel vent line
Details

 07-06-2014
2.00
Installing the accessory plate, starter and magnet
Details
       

 07-04-2014
2.00
Accessory plate details.
Details
       

 07-02-2014
1.50
Valvetrain geometry
Details
       

 06-30-2014
1.50
Valvetrain geometry
Details
     

 06-29-2014
1.00
Rebuilding the engine
Details
       

 06-28-2014
0.60
Rebuilding the engine
Details
       

 06-27-2014
2.00
Rebuilding the engine
Details
       

 06-26-2014
1.50
Rebuilding the engine
Details

 06-25-2014
1.50
Rebuilding the engine
Details
     

 06-24-2014
2.00
Rebuilding the engine
Details
       

 06-23-2014
0.50
Rebuilding the engine
Details
       

 06-22-2014
1.50
Rebuilding the engine
Details
       

 06-21-2014
1.20
Rebuilding the engine
Details
     

 06-20-2014
0.60
Finishing the glareshield installation
Details

 06-18-2014
1.00
Rebuilding the engine
Details
     

 06-17-2014
1.50
Glareshield installation
Details
       

 06-15-2014
1.50
Glareshield cover
Details
       

 06-13-2014
0.80
Windshield installation
Details

 06-10-2014
1.00
Windshield installation
Details
       

 06-09-2014
0.80
Installing the windshield bow strap
Details
       

 06-07-2014
1.60
Making the windshield bow strap
Details
     

 06-04-2014
0.50
Windshield installation
Details

 06-03-2014
1.50
Windshield installation
Details
       

 06-02-2014
1.50
Windshield installation
Details
       

 05-30-2014
1.50
Windshield installation
Details
       

 05-28-2014
1.50
Windshield installation
Details
       

 05-26-2014
0.50
Crack in the engine case, NOOOOOOO!
Details

 05-25-2014
2.00
Painting the engine
Details

 05-24-2014
1.00
Engine cleaning
Details
     

 05-22-2014
1.50
Engine cleaning
Details
     

 05-19-2014
1.50
Engine cleaning
Details
     

 05-18-2014
2.40
Stick to idler pushrod and cover
Details
       

 05-16-2014
1.60
Fuel plumbing
Details
       

 05-14-2014
2.00
Cleaning up the wiring
Details
     

 05-12-2014
2.00
It's alive!
Details
       

 05-04-2014
2.00
Wiring work
Details
       

 05-02-2014
1.50
Wiring work
Details
       

 04-30-2014
2.00
Fuel tank installation
Details
       

 04-29-2014
0.80
Cleaningand testing the fuel tank
Details

 04-28-2014
0.60
Fuel tank fittings
Details
     

 04-27-2014
0.80
More preparation before installing the fuel tank
Details
       

 04-26-2014
0.80
Preparing the fuel tank
Details
     

 04-22-2014
1.20
Installing the gascolator
Details
     

 04-21-2014
1.50
Working on the fuel system
Details
       

 04-20-2014
0.50
Transponder wiring
Details
       

 04-19-2014
1.00
More wiring
Details
       

 04-15-2014
1.00
Com antenna wiring
Details
       

 04-14-2014
0.40
Wiring
Details

 04-12-2014
1.50
Installing the control stick assembly
Details
       

 04-09-2014
1.50
Wiring etc.
Details

 04-07-2014
1.50
Wiring
Details
       

 04-06-2014
1.50
Wiring
Details
       

 03-30-2014
2.00
Wiring
Details
       

 03-27-2014
2.00
FWF wiring
Details
       

 03-24-2014
1.20
Capacitor, alternator relay and ground bus
Details
       

 03-23-2014
1.50
Master solenoid, ammeter shunt and voltage regulat
Details
     

 03-21-2014
1.50
Installing the battery box
Details
       

 03-19-2014
1.00
Making the battery box
Details
       

 03-17-2014
1.00
Battery box
Details
     

 03-16-2014
2.00
Installing the brake cables
Details
       

 03-13-2014
0.80
Making the brake cable guide
Details

 03-11-2014
2.00
Flap and brake handle installation, painting the p
Details
       

 03-09-2014
4.00
Re-making the instrument panel
Details
     

 03-06-2014
0.60
Installing the com and xpdr antenna
Details
       

 03-05-2014
1.50
Installing the AeroFlash
Details
       

 03-04-2014
2.50
Closing up the spar tunnel
Details
       

 03-03-2014
0.50
Priming
Details

 03-02-2014
2.00
Re-rigging the wings
Details
       

 03-02-2014
1.00
Re-mating the spars
Details
       

 03-01-2014
3.00
Making a wing stand
Details
       

 02-28-2014
1.30
drilling the wing attach angles
Details
       

 02-27-2014
0.80
Copying the holes in the forward wiing attach angl
Details
       

 02-26-2014
1.50
Drilling out the forward wing attach angles
Details

 02-25-2014
2.00
Remaking the attack block assemblies
Details
       

 02-24-2014
1.00
Taking everything apart again
Details

 02-22-2014
1.20
Remaking the wing attach blocks
Details

 02-19-2014
1.00
Remaking the left forward wing attach angle
Details
     

 02-18-2014
2.00
Installing the throttle
Details
       

 02-16-2014
1.00
Playing with the instrument panel
Details
       

 02-15-2014
1.00
Remaking the right forward wing attach angle
Details
       

 02-13-2014
1.50
Remaking the right forward wing attach angle
Details
     

 02-09-2014
3.00
Reinstalling the wings
Details

 02-07-2014
1.50
Completing the rear spar carry-through
Details

 02-06-2014
0.50
Completing the rear spar carry-through
Details

 02-04-2014
1.50
Completing the rear spar carry-through
Details

 02-01-2014
0.00
Wing rigging (more pictures)
       

 02-01-2014
0.00
Wing rigging (more pictures)
       

 02-01-2014
0.00
Wing rigging (more pictures)
       

 02-01-2014
0.00
Wing rigging (more pictures)
       

 02-01-2014
0.00
Wing rigging (more pictures)
       

 02-01-2014
0.00
Wing rigging (more pictures)
       

 02-01-2014
0.00
Wing rigging (more pictures)
       

 02-01-2014
0.00
Wing rigging (more pictures)
       

 02-01-2014
0.00
Wing rigging (more pictures)
       

 02-01-2014
0.00
Wing rigging (more pictures)
     

 02-01-2014
11.00
Wing rigging
Details
       

 01-29-2014
1.00
Instrument panel
Details
     

 01-28-2014
0.60
Instrument panel
Details

 01-24-2014
2.00
Instrument panel
Details
     

 01-22-2014
1.00
Instrument panel design
Details

 01-20-2014
1.20
Canopy bows
Details
     

 01-18-2014
2.00
Windshield bow
Details
       

 01-14-2014
0.50
Instrument panel design
Details
       

 01-13-2014
1.00
Instrument panel design
Details
     

 01-12-2014
1.00
Instrument panel design
Details

 01-10-2014
1.00
Inspection cover plates
Details
     

 01-08-2014
1.00
Priming
Details
     

 01-05-2014
1.00
Rear spar carry though assembly
Details
     

 01-04-2014
2.00
Rear spar carry though assembly
Details
       

 01-02-2014
1.50
Left wing completed
Details
       

 12-31-2013
1.50
Riveting the skin
Details

 12-30-2013
2.50
Installing the pushrods and riveting the skin
Details
     

 12-29-2013
3.00
Preparing the skeleton
Details

 12-28-2013
0.50
Priming
Details

 12-27-2013
1.20
Dimpling
Details
       

 12-24-2013
1.00
Deburring and preparing for priming
Details

 12-23-2013
2.00
Deburring and priming
Details

 12-22-2013
0.50
Priming
Details
     

 12-21-2013
1.50
Deburring and preparing for priming
Details

 12-20-2013
0.50
Priming
Details

 12-18-2013
1.00
Deburring and preparing for priming
Details

 12-16-2013
1.50
Updrilling
Details

 12-15-2013
2.00
Installing the wing walk / root doubler
Details
       

 12-14-2013
2.40
Installing the forward skin
Details
     

 12-13-2013
1.20
Installing the forward skin
Details
       

 12-12-2013
1.50
Installing the forward skin
Details
     

 12-08-2013
1.00
Installing the forward skin
Details
     

 12-07-2013
1.50
Updrilling the aft skins
Details

 12-06-2013
1.20
Updrilling the aft skins
Details

 11-21-2013
1.00
Installing the aileron and flap hinges
Details
       

 11-20-2013
1.50
Finishing rib #9 work
Details
       

 11-18-2013
1.50
Priming rib #9 parts
Details

 11-17-2013
2.50
Installing the lower aft skin
Details
       

 11-13-2013
1.50
Installing the lower aft skin
Details
       

 11-10-2013
1.00
Rib #9 work
Details
       

 11-09-2013
2.00
Installing the upper aft skin
Details
       

 11-06-2013
0.60
Installing the upper aft skin
Details
       

 11-05-2013
0.60
Positioning the upper aft skin
Details
     

 11-04-2013
1.50
Root rib doubler and wing walk
Details
       

 10-27-2013
2.00
Aft root rib installation
Details
       

 10-26-2013
0.50
Forward root rib installation
Details
     

 10-25-2013
1.50
Forward root rib installation
Details
       

 10-24-2013
1.20
Rib #9
Details
     

 10-23-2013
0.80
Rib #9 work
Details

 10-22-2013
1.50
Riveting the ribs and rib #9 work
Details

 10-21-2013
2.00
Priming and riveting
Details

 10-20-2013
1.50
Deburring
Details

 10-19-2013
0.40
Left wing skeleton
Details

 10-18-2013
1.60
Installing the aft spar
Details
     

 10-16-2013
0.40
Left wing skeleton
Details

 10-15-2013
1.80
Left wing skeleton
Details
     

 10-14-2013
1.20
Left wing skeleton
Details
     

 10-12-2013
1.50
Left wing skeleton
Details
     

 10-10-2013
1.10
Left wing skeleton
Details
     

 10-08-2013
1.00
Left wing skeleton
Details
     

 10-07-2013
0.00
Moving the wing
Details
       

 10-03-2013
1.20
Right wing completed!
Details
       

 10-02-2013
1.00
Riveting
Details
     

 10-01-2013
1.00
Riveting
Details
     

 09-30-2013
1.20
Riveting
Details
     

 09-28-2013
1.00
TC inspection and starting to put it all back toge
Details

 09-26-2013
2.50
Priming, aileron pushrods and pitot/static tubes
Details
       

 09-25-2013
1.00
Dimpling
Details

 09-24-2013
2.00
Priming and pitot/static instalation
Details

 09-23-2013
2.00
Preparing and priming
Details
       

 09-21-2013
2.50
Dimpling and pitot installation
Details
       

 09-19-2013
1.50
Deburring
Details

 09-18-2013
2.00
Deburring
Details

 09-17-2013
0.70
Deburring
Details

 09-14-2013
1.00
Tubing support assembly
Details
     

 09-13-2013
1.00
Deburring
Details

 09-11-2013
1.50
Deburring
Details

 09-10-2013
1.20
Deburring
Details
     

 09-09-2013
1.00
Pitot / Static assembly
Details
       

 09-08-2013
1.20
Updrilling
Details

 09-06-2013
1.20
Installing the root doubler
Details
       

 09-04-2013
1.50
Installing the root doubler
Details
     

 09-02-2013
0.70
Installing the root doubler
Details
     

 09-01-2013
1.00
Root doubler and wing walk
Details

 08-31-2013
0.70
Root doubler and wing walk
Details
     

 08-27-2013
0.50
Root doubler and wing walk
Details

 08-25-2013
1.50
Installing the forward skin
Details

 08-20-2013
1.20
Installing the forward skin
Details
     

 08-18-2013
2.00
Installing the forward skin
Details
       

 08-14-2013
1.50
Updrilling
Details
       

 08-11-2013
2.00
Flap/aileron hinges
Details
       

 08-04-2013
0.60
Flap/aileron hinges
Details
     

 08-03-2013
0.60
Riveting the aft spar
Details
     

 08-02-2013
0.60
Finishing the aileron belcrank assembly
Details
     

 08-01-2013
1.00
Priming
Details

 07-29-2013
2.00
Rib #9 work
Details

 07-25-2013
0.80
Rib #9 work
Details
       

 07-24-2013
1.00
Aileron belcrank
Details
     

 07-23-2013
1.20
Rib #9 work
Details

 07-21-2013
2.00
Installing the lower aft skin
Details
     

 07-07-2013
0.60
Installing the lower aft skin
Details

 07-02-2013
1.20
Drilling spar
Details
     

 06-23-2013
2.20
Installing the upper aft wing skin
Details
       

 06-22-2013
0.70
Upper aft wing skin
Details
     

 06-22-2013
0.80
Squaring the skeleton again
Details
       

 06-21-2013
0.60
Priming
Details

 06-20-2013
0.60
Deburring and preparing to prime
Details

 06-19-2013
1.00
Installing the forward root rib
Details

 06-18-2013
1.50
Installing the aft root rib
Details
     

 06-16-2013
1.50
Remaking the right aft root rib
Details
       

 06-14-2013
1.20
Root rib installation
Details
       

 06-13-2013
1.00
Deburring and priming
Details

 06-12-2013
0.50
Updrilling
Details

 06-11-2013
1.20
Installing the aft spar
Details
       

 06-10-2013
1.00
Right wing skeleton
Details
       

 06-09-2013
1.20
Priming
Details
       

 06-08-2013
0.80
Deburring
Details

 06-06-2013
0.50
Right wing skeleton
Details

 06-05-2013
1.00
Right wing skeleton
Details
     

 06-04-2013
1.50
Right wing skeleton
Details
     

 06-02-2013
1.20
Right wing skeleton
Details
     

 06-01-2013
1.20
Right wing skeleton
Details
       

 05-31-2013
1.00
Making the aft rib spacers
Details
     

 05-26-2013
1.50
Bending the leading edge wing skins
Details
       

 05-25-2013
1.50
Bending the leading edge wing skins
Details
       

 05-24-2013
1.00
Leading edge wing skins
Details
       

 05-23-2013
0.50
Leading edge wing skins
Details
     

 05-22-2013
1.00
Rib #9 work
Details

 05-20-2013
1.50
Rib #9 work
Details
       

 05-15-2013
0.00
Picked up my engine today!
Details
       

 05-15-2013
0.00
Picked up my engine today!
Details
       

 05-15-2013
0.00
Picked up my engine today!
Details
       

 05-14-2013
1.00
Rivetting the gussets
Details
     

 05-13-2013
1.00
Rivetting the gussets
Details

 05-12-2013
1.50
Priming
Details
       

 05-09-2013
0.50
Priming
Details

 05-08-2013
0.70
Priming
Details
     

 05-06-2013
1.00
Preparing for priming
Details
     

 05-05-2013
1.50
Finishing the root ribs
Details
     

 05-03-2013
1.20
Root ribs
Details

 05-01-2013
2.00
Root ribs
Details
       

 04-28-2013
0.60
Root rib gussets
Details
     

 04-23-2013
1.00
Root ribs
Details

 04-22-2013
2.00
Root ribs
Details

 04-20-2013
1.00
Root ribs
Details
     

 04-19-2013
2.20
Aft ribs
Details
     

 04-16-2013
1.50
Aft ribs
Details

 04-15-2013
0.80
Aft ribs
Details

 04-10-2013
0.50
Aft ribs
Details

 04-09-2013
1.00
Aft ribs
Details
     

 04-07-2013
0.80
Aft ribs
Details
       

 04-05-2013
0.70
Aft ribs
Details

 04-03-2013
2.00
Aft ribs
Details
     

 04-01-2013
1.50
Finished deburring and cleaning the forward ribs
Details
       

 03-29-2013
0.70
Deburring and cleaning
Details
     

 03-27-2013
1.00
Deburring and cleaning
Details

 03-25-2013
1.00
Finished re-making the gussets
Details
     

 03-24-2013
0.80
Gussets
Details
     

 03-23-2013
1.00
Finished the 01/02 forward ribs
Details
     

 03-22-2013
1.50
Making forward ribs
Details

 03-20-2013
1.00
Making forward ribs
Details
       

 03-19-2013
1.00
Forward ribs
Details
     

 03-17-2013
1.00
Priming
Details
     

 03-17-2013
0.50
Forward ribs
Details
     

 03-16-2013
1.50
Mating the main spars
Details
       

 03-14-2013
0.50
Forward ribs
Details
       

 03-12-2013
0.70
Finished solid rivet hammering
Details
     

 03-10-2013
1.00
Hammering solid rivets
Details

 03-07-2013
1.00
Hammering solid rivets
Details

 03-06-2013
0.50
Hammering solid rivets
Details

 03-04-2013
0.50
Hammering solid rivets
Details

 03-03-2013
1.50
Hammering solid rivets
Details
       

 03-02-2013
1.50
Priming
Details
       

 02-27-2013
1.50
Deburring, cleaning and preparing for priming
Details
     

 02-23-2013
1.00
Deburring, cleaning and preparing for priming
Details

 02-20-2013
1.00
Deburring, cleaning and preparing for priming
Details

 02-18-2013
2.00
Countersinking and dimpling
Details

 02-14-2013
1.00
Finished updrilling
Details

 02-11-2013
1.00
Updrilling
Details

 02-07-2013
1.20
Attaching the tie-down angles and starting updrill
Details
       

 02-05-2013
1.00
Drilling the right main spar
Details

 02-04-2013
2.50
Drilling the right main spar
Details
       

 01-24-2013
2.50
Started work on the right main spar
Details
       

 01-22-2013
1.20
Finished rivettng the left main spar
Details
       

 01-20-2013
3.00
More rivets
Details

 01-16-2013
2.00
More rivets and bolts installed
Details

 01-14-2013
1.50
Continues installing rivets and bolts
Details
       

 01-13-2013
2.50
Solid rivetting
Details
       

 01-12-2013
0.60
Priming
Details
       

 01-11-2013
0.60
Priming
Details

 01-09-2013
1.50
Deburring, cleaning and preparing for priming
Details
       

 01-08-2013
1.50
Deburring, cleaning and preparing for priming
Details

 01-07-2013
2.00
Deburring, cleaning and preparing for priming
Details

 01-06-2013
2.50
Countersinking and deburring
Details
       

 01-05-2013
1.50
Dimpling
Details
       

 01-03-2013
3.50
Updrilling
Details

 01-01-2013
1.00
Installing the wing attach angle assemblies
Details
       

 12-31-2012
1.50
Installing the wing attach angle assemblies
Details
       

 12-30-2012
2.50
Making the wing attach angle assemblies
Details
     

 12-28-2012
2.00
Installing angle components on the left main spar
Details
       

 12-25-2012
1.00
Finished drilling the left spar caps
Details

 12-19-2012
0.50
Continued drilling the left spar caps
Details
     

 12-18-2012
1.50
Positioning and drilling the caps on the left main
Details
       

 12-16-2012
0.80
Riveting the aft spars
Details
       

 12-15-2012
0.60
Priming
Details

 12-12-2012
1.00
Priming
Details
     

 12-09-2012
2.50
Main spar aft web and tip web assembly
Details
       

 12-01-2012
0.50
Priming
Details
     

 11-30-2012
1.00
Deburring, and preraing for priming
Details

 11-28-2012
1.00
Rear spar assembly
Details

 11-25-2012
2.50
Rear spar assembly
Details
       

 11-22-2012
1.00
Installing the Flap and brake handles
Details

 11-19-2012
0.50
Flap and brake handle assemblies
Details
       

 11-18-2012
0.60
Brake and flap handle priming
Details
       

 11-17-2012
0.50
Brake and flap handle priming
Details

 11-07-2012
1.20
Flap handle assembly
Details
       

 11-06-2012
2.50
Flap drive block assemblies
Details
     

 11-01-2012
0.50
Installing the tail wheel
Details
     

 10-30-2012
1.00
She's standing on her own legs
Details
       

 10-29-2012
1.50
Wheels and brakes
Details
       

 10-28-2012
2.00
Brakes and wheels
Details
     

 10-27-2012
2.00
Drilling the main gear legs
Details

 10-25-2012
2.00
Aligning the axles (again)
Details
       

 10-22-2012
1.00
Drilling the main gear legs (again)
Details

 10-21-2012
1.20
Rounding the brake cam lobes
Details

 10-17-2012
1.50
Tail wheel assembly
Details
       

 10-16-2012
1.00
Tail wheel assembly
Details
       

 10-11-2012
0.50
Oh crap!
Details
       

 10-10-2012
3.50
Installing the landing gear
Details

 10-07-2012
2.00
Installing the main gear legs
Details
       

 10-04-2012
0.60
Drilling the main gear legs
Details
     

 10-02-2012
1.50
Drilling the main gear legs
Details
       

 09-28-2012
1.20
Rudder pedal installation
Details
       

 09-26-2012
1.00
Rudder pedal installation
Details

 09-25-2012
1.20
Rudder pedal pivot block assemblies
Details
     

 09-24-2012
1.20
Completed engine mount installation
Details
       

 09-23-2012
2.50
Engine mount installation
Details
       

 09-19-2012
2.00
Engine mount installation
Details
       

 09-17-2012
2.00
Engine mount installation
Details
       

 09-12-2012
1.00
Engine mount installation
Details
     

 09-11-2012
1.00
Rudder pedal pivot block assembly
Details

 09-09-2012
0.70
Installing flap and trim quadrant
Details
     

 09-07-2012
0.60
Priming
Details
     

 09-05-2012
1.00
Priming
Details
     

 09-03-2012
1.00
Preparing for priming
Details
     

 09-01-2012
1.00
Deburring
Details

 08-30-2012
1.20
Installing glareshield attach angles
Details
       

 08-29-2012
0.50
Installing glareshield attach angles
Details

 08-27-2012
0.70
Installing modified corner plates
Details
       

 08-25-2012
2.50
Glareshield installation
Details
       

 08-23-2012
1.00
Glareshield attach angles and fuel tank stop angle
Details
     

 08-21-2012
1.50
Instrument panel cross tie and attach angles
Details
     

 08-12-2012
1.50
Remaking the altered corner plates (again)
Details
       

 08-09-2012
2.00
Remaking the altered corner plates
Details
     

 08-07-2012
1.00
Attaching the glareshield
Details
     

 08-06-2012
2.50
Glareshield installation
Details
       

 08-01-2012
2.00
Flap and trim quadrant installation
Details
     

 07-30-2012
0.60
Flap and trim quadrant installation
Details
       

 07-29-2012
1.50
I sat in my airplane for the first time!
Details
       

 07-29-2012
0.00
I sat in my airplane for the first time!
Details
       

 07-28-2012
1.50
Rivetting
Details
       

 07-28-2012
1.00
Priming
Details
     

 07-27-2012
1.00
Priming
Details

 07-25-2012
1.50
Deburring and preparing to prime the seat
Details
     

 07-24-2012
1.00
Installing the seat
Details

 07-23-2012
1.20
Attaching the hinges
Details

 07-22-2012
1.20
Hinges
Details

 07-18-2012
0.70
Dropped seat sling
Details
       

 07-16-2012
1.00
Dropped seat sling
Details
     

 07-15-2012
1.50
Dropped seat sling
Details
     

 07-14-2012
1.00
Dropped seat sling
Details
       

 07-07-2012
1.50
Control stick assembly
Details
     

 07-06-2012
1.50
Control stick assembly
Details
     

 07-05-2012
0.50
Control stick assembly
Details
     

 07-04-2012
1.50
Idler installation
Details
     

 07-03-2012
1.50
Rivetting
Details
     

 07-01-2012
1.00
Idler assembly
Details
     

 06-30-2012
2.00
Priming and re-assembling
Details
     

 06-27-2012
2.00
Preparing for priming
Details
     

 06-24-2012
2.50
Aft lower cabin details installation
Details
     

 06-20-2012
2.00
Aft lower cabin details installation
Details
     

 06-19-2012
2.00
Aft lower cabin details installation
Details
     

 06-18-2012
1.00
Aft lower cabin detail installation
Details
     

 06-16-2012
1.00
Aft lower cabin detail installation
Details

 06-15-2012
1.50
Seat belt Attach Assembly
Details
       

 06-11-2012
2.00
Idler support assembly and LH/RH support angles
Details
       

 06-10-2012
2.00
Various clips and gussets
Details
       

 06-08-2012
2.00
Cap assembly
Details
       

 06-05-2012
1.50
Starting on the cabin details
Details
     

 06-04-2012
2.00
Finished rivetting the forward fuselage
Details
       

 06-03-2012
4.00
Assembling and rivetting the forward fuselage
Details
       

 05-29-2012
1.50
Finished priming and started re-assembling
Details

 05-28-2012
1.00
Priming
Details

 05-27-2012
3.00
Priming
Details
     

 05-24-2012
2.00
Continued deburring, dimpling and countersinking
Details

 05-22-2012
1.00
Continued deburring, dimpling and countersinking
Details

 05-21-2012
2.00
Updrilling, dimpling and deburring
Details

 05-20-2012
2.00
Updrilling and deburring
Details

 05-17-2012
0.70
Dimpling
Details

 05-13-2012
2.00
Updrilling
Details

 05-11-2012
0.50
Trimming the windshield strap
Details
       

 05-10-2012
2.00
Attaching the upper firewall
Details
       

 05-09-2012
1.00
Rivetting the filler box
Details
       

 05-08-2012
1.00
Upper firewall
Details

 05-05-2012
2.50
Upper firewall
Details
       

 04-24-2012
3.00
Filler box and upper firewall
Details
     

 04-19-2012
3.00
Setting up the workshop
Details
       

 04-06-2012
2.00
Moving day
Details
     

 04-03-2012
2.00
Preparing to move the project
Details
       

 03-06-2012
2.50
Filler box skin
Details
     

 02-23-2012
2.50
Finished the upper firewall skin
Details
       

 02-03-2012
2.00
Upper firewall
Details
       

 01-31-2012
2.50
Upper firewall work
Details
       

 01-24-2012
2.00
installing stiffeners
Details
       

 01-22-2012
1.00
making and installing spar tunnel side clips
Details
     

 01-21-2012
2.50
remaking and installing floor skin
Details
       

 01-20-2012
0.80
remaking floor skin
Details
       

 01-15-2012
2.00
Installing the spar tunnel
Details
       

 01-14-2012
0.50
AFT Tunnel web assembly
Details

 01-12-2012
2.00

Details
     

 01-10-2012
0.50
Drilling splice plates
Details
       

 01-08-2012
2.50
Attaching the firewall
Details
       

 01-06-2012
2.50
Making the lower firewall
Details
       

 01-05-2012
0.40
Drawing the lower firewall in AutoCAD
Details
     

 01-04-2012
2.00
Installing floor skin and cross ties
Details

 01-02-2012
2.50
Installing floor skin
Details
     

 01-01-2012
3.00
Joining the fuselage
Details
       

 12-30-2011
3.00
Rivetting and installing bolts
Details
       

 12-28-2011
0.50
Putting the side panel back together
Details

 12-28-2011
1.50
Priming
Details
     

 12-27-2011
1.50
Preparing for priming
Details

 12-26-2011
2.00
Canopy latch strike plate
Details
       

 12-19-2011
1.50
Deburring
Details

 12-17-2011
2.00
Deburring
Details

 12-13-2011
1.50
Updrilling
Details

 12-07-2011
1.00
Finished assembling tyhe LH FWD fuse side panel
Details

 12-05-2011
0.50
Continued assembling the LH FWD fuse side panel
Details

 12-04-2011
3.50
Started assembling the LH FWD fuse side panel
Details
     

 11-29-2011
1.00
Installing bolts
Details
       

 11-28-2011
1.00
Rivetting completed
Details
       

 11-27-2011
1.80
Rivetting
Details
       

 11-26-2011
0.70
Priming
Details

 11-20-2011
1.00
Priming
Details
       

 11-17-2011
1.50
Preparing for priming
Details

 11-16-2011
1.80
Deburring
Details

 11-15-2011
0.70
Deburring
Details

 11-14-2011
1.00
Deburring
Details

 11-09-2011
0.50
Updrilling the RH FWD fuselage side panel
Details

 11-08-2011
0.70
attaching last few pieces to the RH FWD side panel
Details
       

 11-07-2011
2.00
Continued forward right hand fuselage side panel
Details
       

 11-03-2011
0.70
Continued forward right hand fuselage side panel
Details
       

 11-02-2011
1.00
Continued forward right hand fuselage side panel
Details
       

 10-31-2011
1.50
Continued forward right hand fuselage side panel
Details
       

 10-26-2011
2.00
Started assembling the rh fwd fuselage side panel
Details
       

 10-25-2011
1.50
Rudder support angles
Details

 10-24-2011
0.70
Finished the forward angle assembly
Details
     

 10-19-2011
1.00
Forward angle assembly
Details
     

 10-19-2011
0.00
Arrival of the remaining welded components
Details
     

 10-18-2011
1.50
Firewall attach angles
Details
       

 10-12-2011
1.50
Cowling attach hinges and firewall attach angles
Details
     

 10-08-2011
0.00
More pictures of the tail in place
       

 10-08-2011
2.50
Finished fitting the tail
Details
       

 10-04-2011
1.00
Fitting the rudder
Details

 09-27-2011
1.50
Fitting the V-Tail
Details

 09-26-2011
1.50
Fitting the H-Tail (scary drilling)
Details
       

 09-19-2011
1.50
Fitting the H-Tail
Details

 09-18-2011
1.50
Fitting the H-Tail
Details
       

 09-10-2011
3.50
Riveting completed
Details
       

 09-07-2011
1.00
Riveting
Details

 09-06-2011
1.00
Riveting
Details

 09-05-2011
1.00
Priming formers
Details
     

 09-04-2011
4.00
Deburring
Details

 09-01-2011
1.00
Updrilling
Details
       

 08-29-2011
1.00
Updrilling
Details

 08-29-2011
1.00
Priming formers
Details

 08-27-2011
3.50
Installing formers
Details
       

 08-24-2011
2.00
installing formers #4
Details
       

 08-22-2011
2.00
attaching forward splice plates
Details
       

 08-18-2011
2.00
Installing turtledeck formers
Details
       

 08-17-2011
0.70
Installing the turtledeck
Details
       

 08-16-2011
1.50
riveting and fitting turtledeck skin assembly
Details
       

 08-15-2011
1.20
Priming
Details
     

 08-14-2011
1.50
turtledeck skin assembly
Details
       

 08-14-2011
0.50
Fitting the turtledeck
Details
       

 08-13-2011
2.00
Making the second turtledeck skin
Details
       

 08-11-2011
3.00
Making the turtledeck skin
Details
       

 08-03-2011
2.50
Finished making clips and attached them to the cha
Details
       

 08-01-2011
1.50
making clips
Details

 07-28-2011
1.20
Turtledeck formers
Details
       

 07-27-2011
1.00
Turtledeck formers
Details
       

 07-25-2011
1.50
Turtledeck former and fitting the tail
Details
       

 07-24-2011
1.50
Turtledeck formers
Details
       

 07-23-2011
1.50
Rivetting
Details
       

 07-22-2011
1.50
Rivetting
Details
       

 07-20-2011
1.50
Rivetting
Details
       

 07-18-2011
1.00
assembly
Details
       

 07-16-2011
2.00
Priming
Details

 07-13-2011
1.00
Priming
Details

 07-12-2011
2.00
Priming
Details
       

 07-11-2011
2.00
turtledeck formers
Details

 07-06-2011
1.50
preparing for priming
Details
       

 07-03-2011
2.50
Preparing for priming
Details

 06-30-2011
2.00
Continued deburring
Details

 06-27-2011
3.50
more rework, then updrilling and deburring
Details
       

 06-25-2011
2.50
remaking floor skin
Details
       

 06-21-2011
1.50
Attaching new tail wheel mount
Details
       

 06-09-2011
1.50
Attaching the pushrod support channels
Details
       

 06-06-2011
2.00
Attaching the cross tie box
Details
       

 06-05-2011
1.00
Attaching the seatbelt mount assemblies
Details
       

 06-04-2011
1.00
Making the seatbelt mount assemblies
Details
       

 06-03-2011
2.00
Updrilling the tailcone box
Details
       

 06-01-2011
2.50
Continued the tailwheel mount assembly
Details
       

 05-29-2011
2.00
Re-making and re-attaching F23-03
Details
       

 05-28-2011
1.50
Attaching the tailwheel mount
Details
       

 05-26-2011
0.40
Started attaching on the tailwheel mount assembly
Details
       

 05-25-2011
1.50
Continued drilling floorskin
Details
       

 05-24-2011
1.50
Fitting floorskin
Details
       

 05-23-2011
1.50
Drilling upper cross tie channels
Details
     

 05-22-2011
2.50
Drilling lower cross tie channels
Details
       

 05-20-2011
2.00
remaking F24-05
Details
       

 05-19-2011
2.00
squaring up the AFT fuselage
Details
       

 05-16-2011
1.80
Cross tie box assembly
Details
       

 05-15-2011
0.80
Deburring the skin
Details
       

 05-14-2011
2.50
Drilling updrilling and deburring
Details

 05-11-2011
1.30
drilling vertical channels
Details

 05-05-2011
0.70
deburring vertical channel
Details

 05-02-2011
1.00
drilling lower longeron to side panel
Details

 04-30-2011
1.50
drilling upper longeron to side panel
Details
       

 04-30-2011
0.50
Cutting the inspection hole
Details
     

 04-29-2011
0.50
deburring longerons and side panels
Details

 04-28-2011
1.50
deburring AFT fuselage side panel
Details

 04-26-2011
1.20
Updrilling side panel
Details

 04-19-2011
0.50
Fairlead assemblies
Details
       

 04-18-2011
1.00
Fairlead Mount Blocks
Details
       

 04-16-2011
2.50
Attaching splice plates
Details
       

 04-10-2011
1.20
Attaching vertical channels
Details
       

 04-07-2011
2.50
Remaking aft lower fuselage skin and drilling long
Details
       

 04-06-2011
1.20
Remaking lower AFT fuselage skin
Details

 04-05-2011
1.20
Drilling longerons
Details

 04-04-2011
0.70
Starting on the right AFT fuselage panel
Details
       

 04-03-2011
1.00
Planning AFT fuselage assembly
Details
       

 04-03-2011
3.50
Made missing lower AFT fuselage parts
Details
     

 04-02-2011
1.10
Finished polishing ailerons
Details
       

 04-01-2011
1.20
Polishing ailerons
Details

 03-30-2011
2.50
Polishing ailerons
Details

 03-26-2011
1.20
Polishing ailerons
Details

 03-24-2011
1.00
Completed polishing flaps
Details
       

 03-23-2011
1.00
Polishing flaps
Details

 03-22-2011
1.00
Polishing flaps
Details

 03-20-2011
1.50
Polishing flaps
Details

 03-17-2011
1.50
Riveting ailerons
Details
       

 03-16-2011
0.40
Assembling ailerons
Details

 03-14-2011
0.60
Priming ailerons
Details

 03-13-2011
2.50
Preparing the ailerons for priming & priming one s
Details
     

 03-12-2011
3.50
Updrilling and deburring ailerons
Details

 03-09-2011
1.50
Assembling ailerons
Details
       

 03-08-2011
2.00
Aileron tip ribs
Details

 03-05-2011
1.50
Completed counterbalance assemblies
Details
     

 03-03-2011
0.20
Priming counterbalance assembly parts
Details

 03-02-2011
0.50
Priming counterbalance assembly parts
Details

 03-01-2011
1.00
Counterbalance assembly
Details

 02-28-2011
1.00
Counterbalance assembly
Details

 02-27-2011
0.70
Counterbalance assembly
Details

 02-26-2011
1.50
Counterbalance assembly
Details
     

 02-25-2011
1.10
Cutting the aileron counterweight lead
Details
     

 02-24-2011
1.50
Aileron counterweight channel assembly
Details

 02-20-2011
1.50
Polishing flaps
Details
       

 02-17-2011
1.00
Polishing flaps
Details

 02-16-2011
1.00
Polishing flaps
Details

 02-13-2011
2.50
Riveting flaps
Details
       

 02-12-2011
0.50
Priming flaps
Details

 02-11-2011
1.00
Priming flaps
Details

 02-10-2011
2.00
Preparing flaps for priming
Details

 02-08-2011
1.50
Deburring flaps
Details

 02-05-2011
2.50
Deburring flaps
Details

 02-01-2011
1.00
Updrilled the flaps to #30
Details

 01-31-2011
1.00
Flaps, clecoes and drilling hinges
Details
       

 01-29-2011
0.00
Tail complete
Details
       

 01-29-2011
2.50
Finished polishing the V-Stab and rudder
Details
       

 01-24-2011
2.00
Polishing the rudder
Details
       

 01-23-2011
2.50
Polishing V-Stab
Details

 01-22-2011
1.00
Riveting V-Stab fibreglass tip
Details
     

 01-19-2011
1.50
Finished riveting the V-Stab skin
Details
       

 01-17-2011
1.50
Riveting V-Stab skin
Details

 01-16-2011
1.50
Riveting V-Stab skeleton
Details
       

 01-14-2011
0.50
Priming V-Stab skin
Details

 01-12-2011
1.00
deburring the V-Stab Skin
Details

 01-11-2011
0.50
Priming V-Stab skeleton
Details

 01-10-2011
2.50
Priming V-Stab skeleton
Details

 01-09-2011
1.00
V-Stab fibreglass tip
Details

 01-09-2011
1.50
Deburring the V-Stab skeleton
Details

 01-08-2011
2.00
V-Stab Fibreglass tip
Details
       

 01-06-2011
1.00
V-Stab Fibreglass tip
Details

 01-05-2011
1.50
V-Stab Fibreglass tip
Details

 01-03-2011
1.00
Updrilling the skin
Details

 01-02-2011
3.00
Skinning the V-Stab
Details
       

 01-01-2011
1.50
updrilling and deburring the V-Stab skeleton
Details

 12-31-2010
2.50
V-Stab skeleton
Details
       

 12-30-2010
1.50
V-Stab main spar assembly
Details

 12-29-2010
3.00
V-Stab main spar assembly
Details
       

 12-19-2010
1.00
V-Stab forward spar assembly
Details
     

 12-18-2010
2.50
V-Stab misc parts
Details
       

 12-16-2010
2.00
V-Stab misc parts
Details

 12-13-2010
1.00
Clips
Details

 12-08-2010
1.00
Finishing H-Tail
Details
       

 12-07-2010
1.20
attaching H-Stab tips
Details
       

 12-05-2010
2.50
attaching elevators
Details
       

 12-04-2010
3.50
Polishing elevators
Details
       

 12-01-2010
1.50
Polishing elevators
Details

 11-30-2010
2.00
Polishing elevators
Details

 11-28-2010
1.50
Polishing elevators
Details

 11-26-2010
1.20
Polishing
Details
       

 11-24-2010
0.50
Polishing
Details

 11-23-2010
1.00
Polishing
Details

 11-21-2010
1.20
Riveting attachments
Details
       

 11-20-2010
0.50
putty
Details

 11-18-2010
2.00
cleaning prekoting and priming
Details

 11-16-2010
1.00
up-drilling and deburring
Details

 11-14-2010
2.50
trimming and drilling
Details
       

 11-10-2010
3.00
Fitting
Details

 11-06-2010
1.20
Fitting
Details

 11-03-2010
2.00
Fitting
Details

 10-31-2010
2.00
Fitting
Details

 10-30-2010
3.00
Polishing
Details

 10-30-2010
2.50
Assembly and riveting
Details
     

 10-28-2010
1.50
Riveting
Details
       

 10-27-2010
0.75
riveting
Details

 10-25-2010
1.10
Elevator horn assembly continued
Details

 10-24-2010
2.50
Tail tip ribs
Details

 10-23-2010
1.50
Priming
Details

 10-23-2010
0.50
More polishing
Details

 10-21-2010
1.00
Polishing
Details

 10-19-2010
1.20
deburring
Details

 10-18-2010
1.20
updrilling rudder
Details

 10-18-2010
1.30
Rudder assembly
Details
     

 10-18-2010
1.20
Peeling! Grrr!
Details

 10-16-2010
3.00
Rudder drive horn assembly
Details
     

 10-11-2010
1.50
Polishing
Details

 10-10-2010
1.00
Riveting
Details
       

 10-08-2010
3.00
Priming parts
Details
     

 10-04-2010
1.50
Finished updrilling the elevators
Details
       

 10-04-2010
3.50
Deburring
Details

 10-03-2010
0.30
Updrilling elevators to #30
Details

 10-03-2010
0.25
Attached trim tab to elevators
Details
     

 09-30-2010
1.50
Finished the elevator trim tab
Details
     

 09-29-2010
1.00
Started working on the elevator trim tab
Details

 09-27-2010
3.00
Continued elevator assembly
Details
       

 09-26-2010
3.00
Clecoed elevators
Details
       

 09-23-2010
0.50
Drive assembly
Details

 09-22-2010
1.00
Making ribs
Details

 09-18-2010
0.00
Riveting the skins (3)
       

 09-18-2010
0.00
Riveting the skins (2)
       

 09-18-2010
3.50
Riveting the skins (1)
Details
       

 09-15-2010
2.00
Priming skins
Details
       

 09-12-2010
2.00
deburring skins
Details

 09-11-2010
2.50
Riveting the skeleton
Details
       

 09-10-2010
0.75
First rivets
Details
       

 09-05-2010
3.50
Priming parts
Details
       

 09-04-2010
2.00
updrilling skeleton
Details

 09-04-2010
2.50
deburring
Details

 08-25-2010
2.00
Finished skinning, attached piano hinge
Details
       

 08-24-2010
2.00
Skinning (3)
Details
       

 08-21-2010
2.00
Skinning (2)
Details
       

 08-18-2010
2.00
Skinning
Details
       

 08-15-2010
2.00
Skeleton installing tip ribs
Details
     

 08-11-2010
2.00
Skeleton, installing final ribs
Details

 08-09-2010
1.50
Skeleton, installing ribs
Details
       

 08-07-2010
2.00
finished remaking T04-05 and T04-06
Details
     

 08-07-2010
2.00
Attached T04-05 to H-Tail skeleton
Details
     

 08-04-2010
1.00
remake T04-05 and T04-06
Details

 08-02-2010
1.50
Started the H-Tail skeleton assembly
Details
       

 08-01-2010
1.00
T04-06
Details
       

 08-01-2010
0.50
T04-05 (2)
Details
       

 07-31-2010
1.00
T04-05
Details
     

 07-31-2010
4.00
T04-01 and T04-02
Details
       

 07-31-2010
1.50
Installed clips
Details
       

 07-28-2010
2.50
T06-05
Details

 07-26-2010
1.20
T06-06
Details

 07-25-2010
1.00
Drilling the forward spar assembly
Details
     

 07-19-2010
0.70
Finished T12-07
Details
     

 07-18-2010
1.00
T12-01
Details
     

 07-18-2010
1.00
nearly completed T12-07
Details
     

 07-18-2010
1.00
more work on the main spar assembly
Details
     

 07-18-2010
0.75
F26-04R
Details
     

 07-17-2010
2.10
F26-04R, T12-01 and T12-07
Details
     

 07-15-2010
1.20
drilled and clecoed main spar assembly to 3/32
Details
       

 07-10-2010
2.50
W13-01L/R
Details
     

 07-10-2010
1.50
T13-03
Details
     

 07-10-2010
0.75
CAD drawing T12-01
Details
     

 07-09-2010
2.00
F26-04L/R and F26-06L/R
Details
     

 07-05-2010
2.50
Cutting .190 flat parts
Details
       

 07-05-2010
3.00
channel
Details
     

 07-03-2010
2.00
W21-11
Details
     

 07-03-2010
2.20
W06-04
Details
       

 06-30-2010
1.00
T12-02
Details
     

 06-28-2010
0.40
T09-03
Details

 06-27-2010
2.00
W13-04
Details
     

 06-27-2010
1.00
W10-03
Details
     

 06-27-2010
2.00
F20-09L/R
Details
     

 06-27-2010
0.50
F20-08
Details
     

 06-20-2010
1.50
W10-05
Details
     

 06-20-2010
0.50
F03-03
Details
     

 06-19-2010
3.00
F14-10
Details
       

 06-17-2010
0.50
F22-07
Details

 06-16-2010
1.50
F16-07
Details
     

 06-15-2010
0.50
F10-25
Details

 06-14-2010
1.50
F07-06
Details
     

 06-13-2010
0.80
F10-24
Details
     

 06-13-2010
1.50
F07-07
Details
     

 06-12-2010
2.10
F15-09 and F15-10
Details
       

 06-11-2010
1.20
W04-04
Details
       

 06-10-2010
1.75
Finished W04-07
Details
     

 06-09-2010
1.50
Continued W04-07
Details

 06-08-2010
0.50
W04-07
Details

 06-07-2010
0.25
F15-11
Details
     

 06-07-2010
0.75
F15-06
Details
     

 06-05-2010
1.00
W13-03
Details
     

 06-05-2010
4.00
F14-02
Details
     

 06-03-2010
0.50
L05-06
Details
     

 06-03-2010
0.70
F26-08
Details
     

 05-30-2010
1.00
F23-08
Details
     

 05-30-2010
1.00
F15-14
Details
     

 05-29-2010
0.50
F15-08
Details
     

 05-27-2010
1.00
F13-04
Details
     

 05-27-2010
0.50
D02-13
Details
     

 05-23-2010
5.00
Finished making storage space and stored away the
Details
       

 05-22-2010
5.00
Making storage space for my new Aircraft puzzle
Details
       

 05-18-2010
0.00
Bought nearly all flat 6061-T6 aluminium parts, CN
Details
       

 05-18-2010
0.00
Bought nearly all flat 6061-T6 aluminium parts, CN
Details
       

 05-18-2010
0.00
Bought nearly all flat 6061-T6 aluminium parts, CN
Details
       

 05-18-2010
0.00
Bought nearly all flat 6061-T6 aluminium parts, CN
Details
       

 05-18-2010
0.00
Bought nearly all flat 6061-T6 aluminium parts, CN
Details
       

 05-18-2010
0.00
Bought nearly all flat 6061-T6 aluminium parts, CN
Details
       

 05-18-2010
0.00
Bought nearly all flat 6061-T6 aluminium parts, CN
Details
       

 05-18-2010
0.00
Bought nearly all flat 6061-T6 aluminium parts, CN
Details
       

 05-18-2010
0.00
Bought nearly all flat 6061-T6 aluminium parts, CN
Details
       

 05-15-2010
1.80
Made F15-07L/R, Left and right hand flap drive mou
Details
     

 05-15-2010
3.50
D02-14
Details
     

 05-14-2010
2.00
Drawing D02-14
Details
     

 05-09-2010
1.20
F15-12L/R
Details
     

 05-08-2010
2.00
Finished F15-01L/R
Details
     

 05-08-2010
3.00
F15-02L/R
Details
     

 05-02-2010
1.50
Started F15-01L/R
Details

 05-01-2010
1.00
Finished F16-04
Details
     

 05-01-2010
2.00
F16-06L/R
Details
     

 05-01-2010
1.30
F10-05L/R
Details
     

 04-29-2010
1.20
Started F16-04
Details

 04-28-2010
1.80
Cutting 2.5x.2.5x.125 angle
Details
     

 03-24-2010
2.00
F03-04, F10-20 and F10-21
Details
     

 03-22-2010
1.50
F26-07L/R
Details
     

 03-21-2010
1.50
F26-05L/R
Details
     

 03-21-2010
1.10
C02-03
Details
     

 03-20-2010
3.00
F26-02L/R and F26-03L/R
Details
       

 03-19-2010
0.50
Finished F08-09 and C04-07
Details
     

 03-18-2010
1.50
F08-09 and C04-07
Details

 03-17-2010
1.10
L05-05
Details
     

 03-16-2010
0.75
L05-05
Details

 03-15-2010
0.50
Drawing F08-09, L05-05 and C04-07
Details

 03-14-2010
1.50
Finished T06-03
Details
       

 03-14-2010
1.50
Bending T06-03
Details
       

 03-13-2010
4.00
More work on T06-03
Details
       

 03-11-2010
1.75
Continued working on T06-03
Details

 03-10-2010
1.50
Continued working on T06-03
Details

 03-07-2010
1.00
T06-03
Details

 03-06-2010
4.50
Finished T03-02
Details
       

 03-05-2010
1.80
Continued working on T03-02
Details

 03-04-2010
2.00
Continued working on T03-02
Details

 03-03-2010
1.00
Continued working on T03-02
Details

 03-01-2010
1.00
T03-02
Details

 02-27-2010
4.50
Finished F13-03L/R
Details
       

 02-24-2010
1.10
Still working on F13-03L/R
Details

 02-23-2010
0.50
Panel design #1
Details
     

 02-21-2010
2.20
Continued working on F13-03L/R
Details

 02-20-2010
0.50
Started working on F13-03L/R
Details

 02-18-2010
1.10
Finished F13-06L/R
Details
     

 02-17-2010
1.60
Started working on F13-06L/R
Details

 02-16-2010
1.10
Finished W11-01
Details
       

 02-15-2010
2.10
W11-01 continued
Details

 02-13-2010
1.10
Started working on W11-01
Details

 02-13-2010
1.20
Finished F16-09
Details
     

 02-11-2010
2.00
Realy finished F14-09L/R and also finished F16-10
Details
     

 02-08-2010
1.00
Finished F14-09L/R
Details
     

 02-07-2010
3.50
Nearly finished F14-09L/R
Details
       

 02-06-2010
3.00
Finished F14-08L/R
Details
       

 02-02-2010
1.00
continued F14-08L/R
Details

 02-01-2010
1.20
started F14-08L/R
Details

 01-31-2010
3.50
F14-02L/R and F14-13L/R
Details
     

 01-30-2010
0.50
finished F14-07L
Details
     

 01-30-2010
1.20
drawing F14-02L/R and F14-13L/R
Details

 01-28-2010
2.00
F14-07 R and L
Details

 01-27-2010
2.00
W11-03 continued
Details

 01-26-2010
1.80
W11-07 and W11-03
Details
       

 01-23-2010
3.00
W21-03, W21-04, W21-06 and W21-07
Details
     

 01-20-2010
1.50
finished W20-02 and W20-03
Details
     

 01-19-2010
1.80
continued W20-02 and W20-03
Details

 01-18-2010
2.00
W20-02 and W20-03
Details

 01-17-2010
3.50
W13-02L/R
Details
       

 01-16-2010
2.00
T12-05
Details
     

 01-08-2010
2.00
T03-03
Details
       

 01-07-2010
2.00
finally finished F23-03 and F23-04
Details
       

 01-06-2010
1.50
continued F23-03 and F23-04
Details

 01-05-2010
1.50
F22-05
Details
     

 01-04-2010
1.00
F23-03 and F23-04, opening angle
Details

 01-03-2010
1.50
CAD drawing
Details
       

 01-02-2010
3.50
F15-04L/R
Details
     

 12-31-2009
3.50
F10-19, F14-12L and F14-12R
Details
       

 12-30-2009
2.50
W11-08/2 and W11-05
Details
     

 12-29-2009
2.00
W11-08
Details
     

 12-29-2009
1.00
L05-07
Details
     

 12-28-2009
4.50
F22-06, F03-05L/R and F03-06L/R
Details
       

 12-27-2009
3.50
Various wing angles
Details
     

 12-25-2009
2.00
F14-11L/R
Details
     

 12-24-2009
1.00
finished F08-10 and remade F08-11
Details
     

 12-22-2009
1.50
CAD drawing
Details

 12-20-2009
1.00
F10-18
Details
     

 12-20-2009
2.30
F08-08
Details
       

 12-17-2009
1.20
CAD drawing
Details
       

 12-16-2009
1.10
finished cutting the 2x2x.125 angle
Details
     

 12-14-2009
0.50
CAD drawing
Details
     

 12-13-2009
2.20
Cutting 2x.2x.125 angle
Details

 12-11-2009
2.10
Cutting 1.5x.1.5x.125 angle
Details

 12-08-2009
0.80
Wing attachment blocks
Details
     

 12-06-2009
1.00
Cutting angle
Details

 12-05-2009
1.50
Cutting 1x1x.125 angle
Details

 12-04-2009
3.00
Cutting 1x1x.125 angle
Details
     

 12-03-2009
2.30
More fuselage angle parts
Details
     

 12-02-2009
1.90
First part
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.