Brief Description: Drilling lower cross tie channels
Drilled and clecoed the lower cross ties to the aft fuselage tailcone box this morning. A lot of squaring and measiring involved in this job but it turned out ok. I also put the floor skin on after clamping each cross tie to make sure I get the right triangle shape. I then got my wife to help me to flip the box around so I can start on the upper cross ties next.