Powered By Kitlog Pro v2.0
Garys RV-7 Builders Log
RV-7
Wings
12-12-2010
< Previous Log Entry
Next Log Entry >
Date:
12-12-2010
Number of Hours:
2.00
Manual Reference:
7-9
Brief Description:
Aileron Bell Crank install
Installed aileron bell crank after chucking up bolt in drill press to remove some material for slip fit in bushing.
Drilled out bad rivet in the L leading edge. Installed LP-4 rivets internal on L leading edge.
LP-4, LP-3 blind rivets arrived from Van's. OK to substitute per Ken Scott at Van's.
pulled rivets and bell crank bolt
Installed view of aileron bell crank
Leading edge on spar
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
659
880
Airplane and Flying
35
All Things Aviation
35
Avionics
2
Empennage
110
161
Family and Non-Aviat
10
Finishing Kit
2
2
Fuselage
300
530
Miscellaneous
2
Paint Related Items
6
Practice
6
Shop Set Up
18
Tools
19
Wings
114
187
Copyright © 2001-2024 Matronics. All Rights Reserved.