Work Logs Found: 231
Category Work Time: 834 Hours
 Date
Hours
Work Log Summary

Details

 06-09-2019
5.00
DAR inspection and first flight
Details
       

 04-10-2019
4.00
Turned Master Cylinder brackets around
Details
       

 04-06-2019
3.50
Elt Test
Details
       

 04-03-2019
2.00
Taxied to Avionics building
Details
       

 03-25-2019
3.00
Drilled brake pedals
Details
       

 03-20-2019
3.00
Finished riveting top skins
Details
       

 03-18-2019
4.00
Clecoed top wing
Details
       

 03-15-2019
3.00
Continued configuring Skyview
Details
       

 03-11-2019
3.00
Heading issue solved
Details
     

 03-09-2019
4.00
Compass calibration, Safety wiring
Details
       

 03-04-2019
1.50
Installed spacer on stab
Details
       

 02-23-2019
2.00
Fixed problems from first taxi and did second taxi
Details
       

 02-20-2019
3.00
First Taxi
Details

 02-17-2019
3.00
Cleaned the Aircraft, Riveted counterweights
Details
       

 02-15-2019
4.00
Finished the patch
Details

 02-06-2019
5.00
Riveted Stab Doubler, Ran engine
Details
       

 02-03-2019
3.50
Drilled out stab rivets
Details
       

 01-30-2019
4.00
Started hinge and stabilizer patch
Details
       

 01-25-2019
3.00
Ran the engine
Details
     

 01-17-2019
2.00
Removed ADAHRS
Details
       

 01-11-2019
3.00
Tensioned cables
Details
       

 01-09-2019
4.00
Trim plug and Rewired trim widgets
Details
     

 12-29-2018
3.00
Configured autopilot servos
Details
       

 12-21-2018
3.00
Found the Trim indicator problem
Details
       

 12-12-2018
2.00
Installed new fuel pump
Details
     

 12-03-2018
2.50
Fuel flow testing
Details
       

 11-27-2018
2.00
Configured autopilot roll servo
Details
       

 11-19-2018
2.00
Calibrated right fuel tank
Details
       

 11-17-2018
5.00
Calibrated left tank
Details
       

 11-10-2018
2.00
Drained fuel from left tank
Details
       

 11-07-2018
4.00
Finished cowl
Details
       

 11-02-2018
5.00
Weighed the plane
Details
       

 10-28-2018
4.50
Camlocs, charger, Datum
Details
       

 10-22-2018
3.00
Installed exhaust pipe
Details
     

 10-17-2018
3.50
Fuel line and camlocs
Details
       

 10-14-2018
3.00
Finished riveting rubber baffle
Details
       

 09-30-2018
4.00
Added rubber baffles, towed aircraft
Details
       

 09-17-2018
2.50
Clecoed front baffles, riveted oil door
Details
       

 09-16-2018
5.00
Cut the oil door opening and fit the door
Details
       

 09-10-2018
2.50
Marked oil door on cowl
Details
       

 09-09-2018
4.00
Finished drilling cowl holes
Details
       

 09-04-2018
4.00
More fitting of the cowl
Details
       

 09-02-2018
4.00
Installed lower cowl hinges
Details
       

 08-29-2018
3.50
More cowl fitting
Details
       

 08-27-2018
4.00
Set Viking Steel bungee
Details
       

 08-26-2018
3.50
Removed paper from doors
Details
       

 08-22-2018
5.50
Tail feathers, started engine
Details
       

 08-18-2018
4.00
Installed door leading edge latches
Details
       

 08-15-2018
3.50
Finished pilot door
Details
       

 08-13-2018
3.50
Added the rear pin angle
Details
       

 08-09-2018
1.50
Added pilot door hardware
Details

 08-08-2018
4.00
Completed Passenger door
Details
       

 08-07-2018
3.50
Added rear pin angle
Details
       

 08-06-2018
4.00
Installed door hardware on Passenger side
Details
       

 08-04-2018
3.50
Worked on door linkeage
Details
       

 08-02-2018
4.00
Fitted the passenger door
Details
       

 08-01-2018
2.50
Riveted hinges to doors
Details
     

 07-31-2018
3.50
Finished installing seat belts and windows
Details
       

 07-26-2018
4.00
Installed seat belt, screws in arm rest tunnel
Details
       

 07-25-2018
3.50
Installed aileron stops and tunnel tops
Details
       

 07-20-2018
4.00
Finished windshield, screws in panel
Details
       

 07-16-2018
3.00
Finished installing windshield
Details
       

 07-13-2018
4.00
Glued weather boot on windshield
Details
       

 07-10-2018
4.00
Oil pressure manifold, skylight
Details
       

 07-06-2018
3.00
Bled brakes
Details
       

 06-16-2018
3.00
Second engine run
Details
       

 06-15-2018
3.50
Final rigging, ECU wiring
Details
       

 06-13-2018
3.00
Rigged controls
Details
       

 06-12-2018
5.00
Rigged controls, covers for mass weights
Details
       

 06-08-2018
3.00
Filed pilot side flaperon arms
Details

 05-31-2018
3.50
Located neutral flaperons
Details
       

 05-27-2018
4.50
PVC cover for flaperon weight
Details
       

 05-24-2018
5.50
Pilot mass weights, splice plates
Details
       

 05-21-2018
3.50
Added Pilot side flaperons
Details
       

 05-18-2018
5.00
Added fuel shutoff valve, found wiring fault
Details
       

 05-14-2018
3.50
Drilled holes in flaperon weights
Details

 05-10-2018
3.50
Attached right wing flaperons
Details
       

 05-09-2018
3.50
Wired plugs for strobes,lights
Details
       

 05-05-2018
7.00
Attached the wings
Details
       

 05-03-2018
4.00
Trimmed wing skin around forward spar
Details
       

 05-02-2018
4.00
Ran the engine for first time
Details
       

 05-01-2018
3.00
Strut and fittings
Details
       

 04-30-2018
3.00
Expanded hole for rear wing bolt
Details
       

 04-28-2018
2.50
Added oil, affixed EXPERIMENTAL decal
Details
       

 04-27-2018
4.00
Installed map box
Details
       

 04-26-2018
5.00
Map box, Transported wings to hangar
Details
       

 04-23-2018
4.50
Bled the brakes, top skin install
Details
       

 04-16-2018
2.50
Trimmed top skin
Details
       

 04-14-2018
2.50
Drilled top skin L angles
Details
       

 04-13-2018
5.00
Clecoed top skin back on
Details
       

 04-05-2018
3.50
Set propeller pitch and torqued bolts
Details
       

 04-03-2018
3.00
Attached the Whirlwind propeller
Details
       

 03-29-2018
4.00
Finished wiring and intercom
Details
       

 03-19-2018
3.00
More Skyview configuring
Details
       

 03-16-2018
4.50
More Skyview configuring
Details
       

 03-15-2018
4.00
Powered up Skyview first time
Details
       

 03-13-2018
3.50
Cut prob hole in cowl
Details
       

 03-12-2018
3.50
Wired master switch
Details
       

 03-10-2018
3.00
Constructed ExBus ground wire
Details
       

 03-07-2018
4.50
Connected fuel lines in cockpit
Details
       

 03-03-2018
4.50
Fuel fittings, wiring
Details
       

 03-01-2018
4.00
Wired fuel senders, and capacitor
Details
       

 02-27-2018
3.50
Installed second throttle
Details
       

 02-25-2018
4.50
Engine grounding cable, throttle
Details
       

 02-22-2018
4.00
Cut battery ground and starter wires
Details
       

 02-18-2018
4.00
Finished wiring the Rt. side CHT and EGT probes
Details
       

 02-17-2018
5.00
Engine wiring and Tech Counselor visit
Details
       

 02-15-2018
5.00
Cut all spark plug wires
Details
       

 02-14-2018
4.00
EGT probes and spark plug wires
Details
       

 02-12-2018
5.00
Mounted CHT probes
Details
       

 02-08-2018
5.50
Hoses, oil temp sensor, oil cooler
Details
       

 02-07-2018
8.00
Replaced exhaust tube crush washers
Details
       

 02-05-2018
7.00
Mounted both baffles, fuel lines, oil cooler
Details
       

 02-04-2018
5.00
Installed air oil separator, cut baffling
Details
       

 01-30-2018
5.00
Installed ignition coils
Details
       

 01-24-2018
2.50
Organized hangar
Details
       

 01-23-2018
4.00
Mounted engine
Details
       

 01-20-2018
4.50
Relays and engine mount
Details
       

 01-10-2018
3.00
Moved Cruzer from garage to hangar
Details
       

 12-31-2017
2.00
Mounted ignition coil packs to supports
Details
       

 12-29-2017
2.50
Painted coil suppots
Details
       

 12-22-2017
3.00
Wired the start switch
Details
       

 12-19-2017
2.00
Added mounting piece to CBs
Details
       

 12-14-2017
3.00
Bundled wires
Details
       

 12-08-2017
2.00
Riveted heat valves
Details
       

 12-07-2017
3.50
Moved CBs from panel to console
Details
     

 12-06-2017
2.00
Reinstalled Matco brake cylinders
Details
       

 12-03-2017
4.50
Wiring
Details

 12-01-2017
2.00
Installed tow bar
Details
       

 11-28-2017
4.50
Revised heater cables and Parking Brake cable
Details
       

 11-17-2017
2.50
Modified heater push- pull L angle
Details
     

 11-15-2017
3.50
Tamining wires; Cabin Heat flexible wire
Details
       

 11-12-2017
2.50
Removed brake cylinders for upgrade
Details
       

 11-09-2017
3.00
Cut wires for main power
Details
       

 11-07-2017
4.00
Wired relays, fuel pumps
Details
       

 11-03-2017
3.50
Added B nut to heater butterfly valve
Details
       

 11-01-2017
3.50
Finished intercom and comm wiring
Details
     

 10-30-2017
3.00
Installed grounding wires for fuel pumps
Details
       

 10-27-2017
2.50
Heater flanges and battery strap
Details
       

 10-25-2017
3.50
Wired stick
Details
       

 10-24-2017
2.00
Mounted the console top
Details
       

 10-23-2017
3.00
Added second battery
Details
       

 10-20-2017
2.50
Installed course filters and fuel pumps
Details
       

 10-18-2017
4.00
Wired autopilot, trim and flaps
Details
       

 10-11-2017
4.00
Wired switches and bundles
Details
       

 10-09-2017
3.00
Wired Nav/Strobe switches
Details
       

 10-04-2017
4.00
Wired network
Details
       

 09-27-2017
3.00
Wiring
Details
     

 09-21-2017
3.00
Wired fuel low level system
Details
       

 09-19-2017
3.50
Organized wires, mounted stick grips
Details
       

 09-17-2017
3.00
Wired console
Details
       

 09-15-2017
4.00
Installed seat pans and backs
Details
       

 09-14-2017
6.00
Finished carpeting
Details
       

 09-10-2017
2.50
Wired some switches
Details
       

 09-08-2017
2.50
ELT remote control install/audio alert indicator
Details
       

 09-05-2017
4.00
Trimmed the carpet, worked on the instrument panel
Details
       

 09-03-2017
4.00
Constructed template for carpet
Details
       

 09-01-2017
6.00
Installed pax adjustable slide, instrument panel
Details
       

 08-30-2017
4.00
Installed adjustable seat option
Details
       

 08-29-2017
3.50
Installed pilot seat base
Details
       

 08-27-2017
1.50
Labeled the panel
Details
       

 08-26-2017
3.50
Covered console with carbon fiber vinyl
Details
       

 08-25-2017
4.00
Added nut plates to console
Details
       

 08-23-2017
2.50
Drilled console cover
Details
     

 08-22-2017
4.00
Initial fit of instrument panel in aircraft
Details
       

 08-20-2017
1.00
Added switches
Details
       

 08-18-2017
2.00
Installed map box
Details
       

 08-17-2017
4.00
Installed avionics on panel
Details
       

 08-16-2017
4.00
Covered instrument panel
Details
       

 08-08-2017
3.00
Still working on instrument panel
Details
       

 08-06-2017
3.00
Worked on instrument panel
Details
     

 08-05-2017
4.00
Installed capacitor and ECU
Details
       

 08-04-2017
3.50
Installed GPS puck
Details
       

 08-03-2017
5.50
Worked on instrument panel
Details
       

 08-01-2017
2.50
Worked on instrument panel
Details
     

 07-31-2017
2.00
Moved engine from truck to garage
Details
       

 07-21-2017
2.00
Covered tunnel and arm rest
Details
       

 07-19-2017
5.00
Separating, labeling, wires
Details
       

 07-16-2017
2.00
Reinstalled horizontal flaperon rods
Details
       

 07-14-2017
3.00
Cut wires and installed terminals
Details
       

 07-12-2017
3.50
Installed wiring for USB and Dome light
Details
       

 07-11-2017
3.50
Installed grounding block
Details
       

 07-02-2017
5.00
Nut plates and more
Details
       

 06-26-2017
2.00
Finished other half of rear tunnel
Details
       

 06-25-2017
4.00
Added nut plates to 1/2 of the tunnel
Details
       

 06-24-2017
2.50
Cut inspection hole in pilot side baggage floor
Details
       

 06-23-2017
3.50
Wire work and tapping windshield holes
Details
       

 06-21-2017
3.50
Misc. tasks
Details
       

 06-20-2017
4.00
Finished flap sensor and wired
Details
       

 06-19-2017
3.50
Installed Ray Allen flap sensor
Details
       

 06-18-2017
2.50
Finished installing autopilot pitch servo
Details
       

 06-17-2017
4.00
Bolted autopilot pitch servo to torque tube suppor
Details
       

 06-13-2017
4.50
Safety wired roll and pitch servos
Details
       

 06-12-2017
3.50
Installed autopilot roll servo
Details
       

 06-11-2017
2.50
Clecoed pilot side baggage floor
Details
       

 06-10-2017
5.00
Torque tube end plate
Details
       

 06-09-2017
2.50
Installed EXBus II panel
Details
       

 06-07-2017
2.50
Added relays to avionics shelf
Details
       

 06-06-2017
4.00
Connected fuel and vent lines to Skytek
Details
       

 06-04-2017
3.00
Tapped servo arm for rod end
Details
       

 06-01-2017
3.00
Installed NACA vents with Chemseal
Details
       

 05-31-2017
6.00
Pulled the pilot side wiring
Details
       

 05-30-2017
6.00
Ran wire down the Pax side channel
Details
       

 05-29-2017
5.00
Knobs on Pax side avionics shelf
Details
       

 05-28-2017
4.50
Finished autopilot pitch mount
Details
       

 05-27-2017
6.00
Fabricated the roll mount for the autopilot
Details
       

 05-24-2017
1.50
Installed nutplates on Pax avionics shelf
Details
     

 05-23-2017
4.50
Installed avionics on pilot side shelf
Details
       

 05-22-2017
3.00
Finished both avionics shelves
Details
       

 05-21-2017
2.50
Passenger side Avionics shelf
Details
       

 05-20-2017
4.50
Avionics shelf
Details
       

 05-16-2017
1.50
Painted top skin
Details
       

 05-15-2017
1.50
Trimmed top skin
Details
       

 05-09-2017
1.00
Christmas in May
Details
       

 05-03-2017
3.50
Added fuel and vent lines
Details
       

 05-02-2017
2.50
Bent fuel and vent tubing
Details
       

 05-01-2017
3.00
Hung pilot door
Details
       

 04-30-2017
2.50
Added Passenger side door gusset
Details
       

 04-29-2017
2.00
Pilot side door gusset
Details
       

 04-26-2017
3.50
Hung a door
Details
       

 04-25-2017
1.00
Expanded holes in rear of top window
Details

 04-23-2017
1.50
Drilled door hinges
Details
     

 04-22-2017
2.00
Expanded holes in top window
Details
       

 04-19-2017
3.00
Drilled top windshiel and sunroof
Details
       

 04-18-2017
5.00
Windshield trimming, side Z channel
Details
       

 04-12-2017
3.00
Trimmed sides of windshield
Details
       

 04-06-2017
3.00
Swaged and tensioned rudder and elevator cables
Details
       

 04-04-2017
3.00
Aligned Rudder and Pedals
Details
     

 04-03-2017
3.50
Fuel low level sensor and NACA vents
Details
       

 03-30-2017
30.00
Fit and cut windshield
Details
       

 06-19-2015
2.00
Zenith Factory
       