Date: 05-05-2024
|
Number of Hours: 9.00
|
Short Description: Inspection and snags
|
Fixed some snags that were logged during first inspection, including:
Clamp intercooler boost pipe-done
Intercooler bolts and nuts-done Nose wheel-done
Lh wheel split pin-done
Wirelock heatshiels brakes-done
Engine cable ties cut-done
Rivets under fuselage missing-done
BleedĀ brakes-done
The nosewheel was removed and reinstalled.
|