Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
Empennage
4-22-2007
< Previous Log Entry
Next Log Entry >
Date:
4-22-2007
Number of Hours:
4.00
Manual Reference:
6-7
Brief Description:
Match drilled left hand elevator
Match drilled the stiffeners to the left hand elevator skin.
Deburred both elevator skins and stiffeners.
Dimpled all the elevator stiffeners.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
6
108
Canopy
2
288
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.