KitLog pro

Powered By Kitlog Pro v2.0

Michaels Sonex #145 log
' style=
Date:  12-16-2014
Number of Hours:  1.50
Manual Reference:  D01
Brief Description:  Installing the canopy

Today I finished installing the canopy bow screws, I then installed the aluminium rivets in the hinge and side strip.
I used my air riveter for the job, I know some use a hand riveter for the job to be "safer", I don't believe it is "safer", the stem will break at the same pressure.
Anyway, I just set the pressure real low (10-15PSI) and did a couple of test rivets first in a scrap piece of plexiglass.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.