KitLog pro

Powered By Kitlog Pro v2.0

Michaels Sonex #145 log
' style=
Date:  9-30-2014
Number of Hours:  0.50
Manual Reference:  P13
Brief Description:  Fibreglass finishing

With all cut-outs made, holes drilled and exhaust tunnels and fuel door installed it's now just a matter of detailing the cowling.
I started filling the top rivet holes with gel coat repair filler today. The filler dries in about 20 minutes after which you can sand the surface smooth.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.