Brief Description: Drilling the main gear legs (again)
My new axles arrived today so I started on the main gear installation tonight (second attempt). As planned, with Kerry's approval, I took the legs back out of the motor mount, flipped them around, rotated them 90 degrees and drilled the new 1/4" holes (I'm getting quite good at drilling titanium) and finally installed them back into the motor mount. I then drilled the 3/16" holes in the axles but did not install them yet, I really want to take my time to do this this time.