KitLog pro

Powered By Kitlog Pro v2.0

Phils Web Site
' style=
Date:  3-11-2014
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Wiring and lit up the screens

Spent the day wiring the second screen to the first as well as connecting the serial ports as needed. Connected the master relay and installed the diode. Configured the Vertical Power VP-X Sport.

LIT UP THE SCREENS!!!!

At this point the wiring is finally done with the exception of mounting the headset jacks, aux power plugs and the final connections to the wing for the fuel guages and lighting. So far everything works. Tomorrow we will start configuring the Dynon.
' style=

Piloy side wiring

Piloy side wiring

' style=

Co-pilot side wiring

Co-pilot side wiring

' style=

They turn on!!!

They turn on!!!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.