KitLog pro

Powered By Kitlog Pro v2.0

Garys RV-7 Builders Log
' style=
Date:  12-30-2010
Number of Hours:  1.50
Manual Reference:  7-9
Brief Description:  R Leading Edge Riveting and R Tank

Tonght I finished riveting all but two rivets on the right leading edge ribs. Colten will need to help me with those.

I bolted on the left tank to the spar and used Boelube on the bolts. I then realized that there was a rib rivet that wasn't done and the trailing edge of the tank skin now covered it up. So the last hour of work was for nothing. Arrgh. Time for bed.
' style=

Tank attach bolts

Tank attach bolts

' style=

Bottom view of tank bolts

Bottom view of tank bolts

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.