KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  5-27-2007
Number of Hours:  2.00
Manual Reference:  6W3
Brief Description:  Pre-assembled and bolted/clecoed spar

To give the spar maximum rigidity and stack compression, I have been advised to cleco or bolt all holes before riveting. Because the AN-470-AD-6-14 holes are larger than the largest cleco I coiuld get, I am using AN bolts, washers and nuts. This takes some time, but is worth in in the final product.
' style=

Everything lined up and locked tight

Everything lined up and locked tight

' style=

Swivel vise to hold things upright for riveting

Swivel vise to hold things upright for riveting

' style=

View for the other end, with block to hold spar level and off the table

View for the other end, with block to hold spar level and off the table

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.