KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  9-29-2020
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Aft Fuselage Repair

Local RV-6A builder Greg Heckler came over and helped me with the remaining rivets attaching the F-710 bulkhead to the fuselage, and the F-710B angle to the F-710. I misdrilled two clinched rivets in the lower right corner that will require extra tabs to be installed.:0(



Rivets Today: 13
Rivets Total: 11986
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.