KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  9-26-2020
Number of Hours:  0.90
Manual Reference:  
Brief Description:  Aft Fuselage Repair

Installed F-710B with 7 of 11 rivets. The outboard two on each side will require the use of an offset rivet set, and I’d prefer to use that set with both hands and a helper to buck.

I also fabricated, fit, and deburred the edges of the F-710C spacer.

Rivets Today: 7
Rivets Total: 11973
' style=

F-710C in its final resting place.

F-710C in its final resting place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.