KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  3-13-2021
Number of Hours:  2.80
Manual Reference:  
Brief Description:  Cabin Frame

Trimmed the lower end of the left forward F-631A channel to match the left aft channel. Measured, marked, predrilled #40, and deburred all strap attach holes on that channel.

Unclecoed both straps and rounded the edges further for a better fit inside the channels, then reclecoed the straps to the aft channels.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.