KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction Log
' style=
Date:  3-10-2021
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Cabin Frame

Clamped F-631B inner strap to aft cabin frame channels, then match drilled #40, and deburred all holes in the aft edge of the strap. (Edit 3/11/21: I should have match drilled to #30 for final hole size, but that’s easily done later, should only take a few minutes).
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.