I opted for a static port that is designed for composites and accepts a 1/8" NPT fitting for the best possible leak prevention. I am locating it in the plans position however on the opposite side. I want my Pitot tube on the left side due to clearance issues on the right. After I select the proper fitting, it will be perminently floxed in place.