KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  2-13-2007
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fuel selector valve

Started looking at the other cabin construction details, determining now what else will be where and potential interference and sequence issues.

Roughed the fuel selector valve into place on the F-683 plate. I've decided that I'll follow the FWF plans of the RV-7 drawing, included in the Update Plans, so that when I order the FWF kit, it will be the "RV-7 Kit". This is indicated as a cleaner system of positioning the components. In this line, I had already removed the BATT box from the RV-6A QB and opened up the space between the rudder pedals. The BATT will be installed on the firewall, right side, in the cowl.

The only tubing task accomplished was the fuel selector to pump section, which on the -7 goes on the FW where the BATT box was removed.

I had just worked on the brake lines, static line, and rudder cables, so it was appropriate to also consider the manual trim cable.
' style=

Rough position

Rough position

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.