After 24 hrs (and sun warm-up) the Proseal on the FAB was firm and ready to rivet. Then finished the installation of the Alternate Air vent mechanism on the bottom. Ready to connect the Bowden cable and test.
Added the 1/4" soft alum lines for the brakes, secured on the main gear legs, with the appropriate loop around the axle to flex. Added the brackets for the wheel pants and worked on the wheel pants. Trimmed to fit around right wheel and around the brakes, lines, and bracket. Need more work to finish.
Bedded the vertical sections of lower cowl hinges in epoxy with micro-ballons. Should be ready in the morning to match-drill the holes clean & rivet these section. Then other hinges will be done in pairs.