Somewhat of a 'clean-up' day, working on clean-up tasks in various areas; rudder control tubes, instrument panel, paint.
Tightened up Adel clamp screws in the equipment bay (between FW & subpanel) and general inspection & review of other components.
Drilled holes for the MIC/Headset for pilot/co-pilot into the left & right extremes of the instrument panel. Drilled hole for cabin heat control cable in the right side of panel. Began adding Adel clamps for cable.
Removed & prep'ed the panel, sprayed primer, and a coat of Rustomleum Lt Gray semi-gloss (matches other cabin items). Re-assembled panel.