KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  1-1-2016
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Engine Mount - nose gear & more

Difference between the nose gear bolt alignment with the FW hole for the bolt/nut required that the hole be re-drilled, enlarged, on the upper edge. A 2x4 was bolted to the FW with the two middle bolts of the engine mount, and a pre-drilled hole was positioned as a guide to drill. The hole cutter made a clean and quick hole at 1 1/8" dia, and with deburring and polishing presented a productive alignment which will allow access. Remaining problem is how to properly seal the FW with a new cover plug.

The oversize 1/8" thick washers (with some shaping) were installed in each of the engine/FW holes to move the castle nut into a better alignment for the cotter pins. All things considered, the mount was easier to re-install than the first time.Need to torque, mark, and finish with correct cotter pins.
' style=

2x4 guide board

2x4 guide board

' style=

Enlarged hole

Enlarged hole

' style=

Oversize washers/spacers

Oversize washers/spacers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.