Worked on X-Y coordinates for layout of the new panel. Drew a few lines on the vinyl, and checked the positions.
Went to FFZ and met with A&P to plan final assembly of engine accessories, and chart a course to install everything. Decided on a supervised plan, with the engine at my hangar and the A&P will oversee work. Went to hangar and found that there is a leak, right on top of the wings (on the cart) and the TE is getting damp. Moved cart.
Fabricated a soft alum tube between FW fitting and machical fuel pump to model the needed length and shape of hose. Will have a custom hose made from this.