KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  1-30-2015
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Panel - replacement planning

Worked on X-Y coordinates for layout of the new panel. Drew a few lines on the vinyl, and checked the positions.

Went to FFZ and met with A&P to plan final assembly of engine accessories, and chart a course to install everything. Decided on a supervised plan, with the engine at my hangar and the A&P will oversee work. Went to hangar and found that there is a leak, right on top of the wings (on the cart) and the TE is getting damp. Moved cart.

Fabricated a soft alum tube between FW fitting and machical fuel pump to model the needed length and shape of hose. Will have a custom hose made from this.
' style=

Comparison of panels

Comparison of panels

' style=

Model of desired length

Model of desired length

' style=

Test line - soft alum

Test line - soft alum

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.