KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  1-11-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Panel - Brace

Riveted the 3/4 x 3/4 .063 angle to the subpanel after priming.

Degreased and primed the braces. Added nutplates and riveted the left & right braces together. Assembled for a final test fit.

The F-645 braces were useful after all the waiting.
' style=

Primed & installed

Primed & installed

' style=

Panel side view

Panel side view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.