KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  9-4-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  5-pt crotch strap attach

Realized that the best result was going to be achieved by aggressive mod to the Vans 5-pt crotch strap kit to get a good fit and easier install.

Trimmed off the two sides (rivet flanges) of the Vans kit, trimmed off 1/16" from the remaining section (web) and fabricated two 3/4 x 3/4 AL angle .063 to replace the factory flanges. This allows the angles to be properly aligned (spaced), drilled and riveted before dealing with the inconsistencies of the rib dimensions in a non-pre-punch RV-6A kit.

Align the side angles, drill, secure with clecoes, and align the aft portion (F-7117B). Then drill, secure and remove to prepare it (debur, prime, etc). Repeat for the F-711A (fwd section).
' style=

Trimmed & angles fabricated

Trimmed & angles fabricated

' style=

Align and secure angles

Align and secure angles

' style=

Add F-7117B (aft) piece

Add F-7117B (aft) piece

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.