KitLog pro

Powered By Kitlog Pro v2.0

Arts Web Site
' style=
Date:  7-11-2022
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Install Nutplates on LHS Upper Flange

Called Vans early this morning and they said the screw holes should have been final drilled, but confirmed a #19 drill to open the holes up. Once the holes were big enough I used a screw to hold the nutplates in position and a cleco. A final adjustment with the awl and the rivet popped right in.

I used the squeezer and installed two different types of nutplates on the upper spar. No issues or difficulties so far. All the rivets were nice and flush.
' style=

Lock the nutplate into position with a screw, cleco and final position with the awl

Lock the nutplate into position with a screw, cleco and final position with the awl

' style=

LHS upper spar nutplates installed

LHS upper spar nutplates installed

' style=

There are two different types of nutplates to install: K1100-08 and MS21053-L08

There are two different types of nutplates to install: K1100-08 and MS21053-L08

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.