Powered By Kitlog Pro v2.0
Miguel Vidal RV-8
RV-8
Wings-Fuel Tanks
Work Logs Found:
72
Category Work Time:
134 Hours
Date
Hours
Work Log Summary
Details
02-07-2019
1.90
Closing and Finishing the Tank (LH&RH)
Details
01-19-2016
5.00
Closing and Finishing the Tank (RH)
Details
01-16-2016
5.00
Closing and Finishing the Tank (LH)
Details
10-07-2015
1.30
Installing Capacitive Fuel Quantity Sender (RH)
Details
10-06-2015
2.50
Installing Capacitive Fuel Quantity Sender (RH)
Details
09-24-2015
2.70
Assembling and Sealing the Tank (RH)
Details
09-24-2015
0.30
Assembling and Sealing the Tank (RH)
Details
08-20-2015
4.00
Assembling and Sealing the Tank (RH)
Details
08-19-2015
4.00
Assembling and Sealing the Tank (RH)
Details
08-18-2015
0.30
Closing and Finishing the Tank (LH)
Details
08-18-2015
0.50
Assembling and Sealing the Tank (RH)
Details
08-16-2015
0.60
Installing Capacitive Fuel Quantity Sender (LH&RH)
Details
08-16-2015
1.00
Assembling and Sealing the Tank (LH&RH)
Details
08-13-2015
1.60
Installing Capacitive Fuel Quantity Sender (RH)
Details
08-13-2015
1.00
Fuel Tanks Inverted Mod Assembly (RH)
Details
11-22-2014
1.00
Assembling and Sealing the Tank (LH)
Details
10-26-2014
1.50
Assembling and Sealing the Tank (RH)
Details
10-23-2014
1.50
Assembling and Sealing the Tank (RH)
Details
10-17-2014
1.20
Assembling and Sealing the Tank (LH)
Details
10-16-2014
0.60
Installing Capacitive Fuel Quantity Sender (RH)
Details
10-16-2014
0.90
Assembling and Sealing the Tank (RH)
Details
10-06-2014
1.50
Assembling and Sealing the Tank (RH)
Details
10-04-2014
0.60
Assembling and Sealing the Tank (RH)
Details
10-03-2014
0.70
Fitting the Tank Skin to Ribs and Baffle (RH)
Details
10-03-2014
2.00
Assembling and Sealing the Tank (LH&RH)
Details
09-29-2014
0.60
Fuel Tanks Return System (RH)
Details
09-29-2014
1.00
Fitting the Tank Skin to Ribs and Baffle (RH)
Details
09-24-2014
0.60
Fuel Tank Final Preparations (RH)
Details
09-23-2014
1.60
Closing and Finishing the Tank (LH)
Details
09-23-2014
1.00
Assembling and Sealing the Tank (RH)
Details
09-22-2014
1.90
Fuel Tank Final Preparations (RH)
Details
09-02-2014
2.50
Fuel Tank Final Preparations (RH)
Details
09-02-2014
2.30
Fitting the Tank Skin to Ribs and Baffle (RH)
Details
09-01-2014
3.40
Fitting Attach Angles to Spar and Baffle (RH)
Details
08-26-2014
3.90
Fitting Attach Angles to Spar and Baffle (RH)
Details
08-25-2014
1.20
Fitting Attach Angles to Spar and Baffle (RH)
Details
06-19-2014
1.60
Assembling and Sealing the Tank (LH)
Details
06-18-2014
2.40
Installing Capacitive Fuel Quantity Sender (LH)
Details
06-18-2014
1.20
Assembling and Sealing the Tank (LH)
Details
06-17-2014
1.40
Assembling and Sealing the Tank (LH)
Details
06-16-2014
4.40
Assembling and Sealing the Tank (LH)
Details
06-13-2014
1.50
Installing Capacitive Fuel Quantity Sender (LH)
Details
06-13-2014
1.50
Installing Capacitive Fuel Quantity Sender (LH)
Details
06-12-2014
3.60
Assembling and Sealing the Tank (LH)
Details
06-10-2014
0.20
Installing Capacitive Fuel Quantity Sender (LH)
Details
06-10-2014
3.70
Assembling and Sealing the Tank (LH)
Details
06-06-2014
0.50
Fuel Tanks Return System (LH)
Details
06-06-2014
2.30
Assembling and Sealing the Tank (LH)
Details
06-05-2014
1.00
Installing Capacitive Fuel Quantity Sender (LH&RH)
Details
06-05-2014
1.50
Fuel Tanks Inverted Mod Assembly LH
Details
06-05-2014
2.00
Fuel Tanks Inverted Mod Assembly (LH&RH)
Details
06-05-2014
3.50
Assembling and Sealing the Tank (LH)
Details
06-05-2014
1.50
Assembling and Sealing the Tank (LH)
Details
06-04-2014
2.50
Assembling and Sealing the Tank (LH)
Details
06-02-2014
2.00
Assembling and Sealing the Tank (LH)
Details
05-31-2014
4.00
Assembling and Sealing the Tank (LH)
Details
05-30-2014
1.00
Fuel Tank Final Preparations (LH)
Details
05-30-2014
2.00
Fitting the Tank Skin to Ribs and Baffle (LH)
Details
05-29-2014
1.50
Fuel Tanks Inverted Mod Assembly (LH&RH)
Details
05-28-2014
1.70
Installing Capacitive Fuel Quantity Sender (LH)
Details
05-28-2014
0.30
Fuel Tank Final Preparations (LH)
Details
05-27-2014
0.50
Fuel Tank Final Preparations (LH&RH)
Details
05-27-2014
1.50
Fitting the Tank Skin to Ribs and Baffle (LH)
Details
05-27-2014
1.70
Fitting the Tank Skin to Ribs and Baffle (LH&RH)
Details
03-17-2014
2.60
Fuel Tank Final Preparations (LH)
Details
03-05-2014
3.20
Fitting the Tank Skin to Ribs and Baffle (LH)
Details
02-17-2014
1.10
Fuel Tank Final Preparations (LH)
Details
11-20-2013
1.00
Fitting Attach Angles to Spar and Baffle (LH)
Details
11-12-2013
2.00
Fitting Attach Angles to Spar and Baffle (LH)
Details
11-11-2013
1.00
Fitting the Tank Skin to Ribs and Baffle (LH)
Details
11-11-2013
6.50
Fitting Attach Angles to Spar and Baffle (LH)
Details
11-10-2013
1.30
Fitting the Tank Skin to Ribs and Baffle (LH)
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
538
920
Empennage
5
6
Empennage-Elevators
50
96
Empennage-HS
56
79
Empennage-Rudder
31
39
Empennage-VS
12
23
Flight Controls
1
1
Fuselage
96
205
Practice Kit
1
6
SB16-03-28
4
6
Shop Supplies
1
0
Toolbox
1
6
Wings
4
6
Wings-Ailerons
34
56
Wings-Flaps
18
35
Wings-Fuel Tanks
72
134
Wings-Landing Lights
26
32
Wings-Leading Edges
23
32
Wings-Pitot/AOA
13
13
Wings-Ribs
20
40
Wings-Roll Servo
4
8
Wings-Skins
17
20
Wings-Spars
20
34
Wings-Spars, Ribs, a
20
34
Wings-Stall Warning
7
5
Wings-Wingtips
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.