Powered By Kitlog Pro v2.0
TODD'S WEB SITE
RV-10
Cowling
Work Logs Found:
16
Category Work Time:
16 Hours
Date
Hours
Work Log Summary
Details
09-02-2013
1.00
Completed oil acess door
Details
08-02-2013
1.00
Completing the air scoop
Details
07-10-2013
1.00
Air Scoop extension
Details
07-01-2013
1.00
Initial oil access door fitting
Details
06-26-2013
1.00
Cutting out the hole for the oil filler door
Details
06-04-2013
1.00
Installing the camloc support strips
Details
06-03-2013
1.00
Matching camloc support strips
Details
06-02-2013
1.00
Lower Cowl Vent Slots
Details
05-25-2013
1.00
Drilling/riveting the horizontal support strips
Details
05-18-2013
1.00
Trimming inlets
Details
05-18-2013
1.00
Lower Cowl
Details
05-11-2013
1.00
Top cowl inlet ramps
Details
05-10-2013
1.00
Cutting the slot in the lower cowl
Details
05-06-2013
1.00
Fitting the top cowl, continued
Details
05-05-2013
1.00
Fitting the top cowl
Details
05-04-2013
1.00
Cowl inlet trimming
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
481
732
Avionics
9
9
Cowling
16
16
Electrical
1
1
Elevators
46
83
Empennage
4
5
Empennage Attach
13
24
Engine
19
19
Fuselage
131
131
Horiztontal Stab
38
82
Inventory
2
4
Miscellaneous
2
2
Prop
5
5
Rudder
14
24
Tailcone
63
140
Vertical Stab
14
35
Wings
104
152
Copyright © 2001-2024 Matronics. All Rights Reserved.