Jims RV-8
Work Logs Found: 139
Category Work Time: 331 Hours
 Date
Hours
Work Log Summary

Details

 11-10-2018
2.00
Final sanding and primer removal
Details
       

 09-30-2018
0.80
Empennage tip work
Details
       

 09-29-2018
3.90
Empennage tips - prep and prime El. bellcrank
Details
       

 09-27-2018
2.00
VS tip installed - more tip sanding
Details
       

 09-25-2018
1.20
more empennage tip sanding and sanding primer
Details
     

 09-24-2018
2.20
More fiberglass tip work on the "other" sides
Details
     

 09-23-2018
2.00
Dis-assemble the empennage
Details
       

 09-22-2018
2.30
more sanding, spraying sanding-glass tip work
Details
       

 09-16-2018
2.20
Getting closer - more glass work
Details
       

 09-15-2018
2.00
Sanding & redo of the glasswork
Details
       

 08-26-2018
1.50
Rudder and VS glass work
Details
     

 08-11-2018
1.00
Vertical Stab glass tip
Details
     

 08-05-2018
1.30
sanding and more VS fillet work
Details
       

 08-04-2018
1.50
Empennage fiberglass work + sanding
Details
       

 07-15-2018
2.50
VS Fiberglass tip work
Details
       

 05-19-2018
2.10
Left tips
Details
       

 05-18-2018
2.00
Right tips
Details
       

 05-15-2018
1.00
Horizontal Stab - tips
Details
     

 05-13-2018
1.20
End cap layups
Details
       

 05-09-2018
2.30
Empennage fiberglass tips – Left side
Details
       

 05-06-2018
4.10
Empennage fiberglass tips – Right side
Details
       

 04-29-2018
4.20
Empennage - Fiberglass work
Details
       

 04-08-2018
2.00
Rudder tip - upper #2
Details
       

 04-07-2018
2.40
Rudder tip - upper
Details
       

 03-17-2018
1.80
Tail cone finish, light mount
Details
       

 03-11-2018
0.50
Layers in tail cone and more on the console
Details
       

 03-03-2018
4.50
First Fiberglass Foray- Rudder bottom cap
Details
       

 08-13-2016
7.00
Horizontal Stab v2.0 Incl. SB, #11
Details
       

 08-12-2016
1.50
Horizontal Stab v2.0 Incl. SB, #10
Details
       

 08-07-2016
2.30
Horizontal Stab v2.0 Incl. SB, #9
Details
       

 08-06-2016
1.30
Horizontal Stab v2.0 Incl. SB, #8
Details
       

 08-05-2016
1.70
Horizontal Stab v2.0 Incl. SB, #7
Details
       

 07-27-2016
2.60
Horizontal Stab v2.0 Incl. SB, #6
Details
       

 07-25-2016
2.20
Horizontal Stab v2.0 Incl. SB, #5
Details
       

 07-24-2016
6.60
Horizontal Stab v2.0 Incl. SB, #4
Details
       

 07-23-2016
3.80
Horizontal Stab v2.0 Incl. SB, #3
Details
     

 07-16-2016
5.80
Horizontal Stab v2.0 Incl. SB, #2
Details
       

 07-15-2016
1.00
Horizontal Stab v2.0 Incl. SB, #1
Details
       

 12-11-2015
1.00
The Horizontal Stabilizer and the SB are complete
Details
     

 12-10-2015
2.80
Almost done with the Horizontal Stab
Details
       

 12-09-2015
2.50
Other side of the HS skin
Details
     

 12-08-2015
2.50
Riveting left HS skin and ribs
Details
       

 11-22-2015
0.50
Blind Rivets in ribs/spar
Details
     

 11-16-2015
1.50
Finished rivets on the Front spar, some rib rivets
Details
     

 11-12-2015
2.00
HS - Front spar riveting
Details
       

 11-08-2015
3.50
HS - prep and priming, and some baggage parts too
Details
       

 11-06-2015
1.50
Horizontal Stab. - Dimpling
Details
     

 11-03-2015
2.30
Deburring and edging HS parts
Details
       

 11-02-2015
2.10
finish drilling, un-cleco, deblue, debur
Details
     

 11-01-2015
6.20
Horizontal stab rebuild - continued
Details
     

 10-31-2015
3.20
front spar work
Details
     

 10-30-2015
2.50
Front spar work and 810/814 angles
Details
       

 09-07-2015
2.00
Horizontal Stabilizer Spar Service Bulletin #6
Details
     

 09-06-2015
1.50
Horizontal Stabilizer Spar Service Bulletin #5
Details

 09-05-2015
2.30
Horizontal Stabilizer Spar Service Bulletin #4
Details
       

 08-29-2015
1.00
Horizontal Stabilizer Spar Service Bulletin #3
Details
     

 08-27-2015
2.20
Horizontal Stabilizer Spar Service Bulletin #2
Details
       

 08-26-2015
2.00
Horizontal Stabilizer Spar Service Bulletin #1
Details
       

 07-23-2013
1.00
Riveted trim tab servo brackets/installed servo
Details
       

 07-18-2013
1.50
Electric trim tab servo cover/brackets– revisited
Details
       

 04-24-2013
3.00
miscellaneous finalization of elevator stuff >200
Details
       

 04-23-2013
0.75
mate left elevator to horizontal stabilizor
Details
     

 04-22-2013
1.25
Bend and rivet leading edge of L Elevator
Details
       

 04-21-2013
2.00
trim tab hinge
Details
       

 04-17-2013
3.50
Riveting Left Elevator
Details
       

 04-16-2013
3.00
left elevator
Details
       

 04-04-2013
4.00
L. Elevator - Edge finiish, dimple, prime...
Details
       

 04-02-2013
2.00
(re) Start the Left Elevator skin prep
Details
       

 04-01-2013
0.25
Inventory of new Elevator parts
Details
     

 03-27-2013
1.00
Rudder to Vert. Stab adjustments
Details
     

 03-25-2013
2.00
Cut HS tab for Elevator clearance
Details
     

 03-24-2013
3.00
Dis-assemble left elevator
Details
       

 03-14-2013
2.00
Bolt Elevator to HS...BANG!
Details
       

 02-21-2013
1.50
trial fit of elevators to HS
Details
       

 02-20-2013
1.50
trim tab work
Details
     

 02-18-2013
2.00
Bend right elevator leading edge
Details
       

 02-14-2013
3.00
left elevator leading edge bend
Details
       

 02-10-2013
2.75
Fnished up trim tab
Details
       

 02-08-2013
0.50
trim tab prep / prime
Details
     

 02-07-2013
2.50
trim tab work - continued
Details
       

 02-06-2013
2.50
trim tab work
Details
       

 01-31-2013
1.50
Rod Ends inserted (147.25 hours)
Details
       

 01-30-2013
2.00
Rivetted hard to gets...
Details
       

 01-27-2013
4.00
rivet left elevator (143.75 hours)
Details
       

 01-24-2013
1.75
working on trim
Details
       

 01-23-2013
1.50
re-prep the trim spar
Details
       

 01-19-2013
2.00
clean and prime left elevator substructure
Details
       

 01-17-2013
1.00
bad day in the shop...confession time
Details
       

 01-16-2013
0.75
more prep for priming the left elevator
Details

 01-12-2013
4.25
Prep L Elevator skeleton
Details

 01-11-2013
2.00
rivet the stiffeners to left elevator
Details
       

 01-10-2013
2.25
Prep Left Elevator skin and trim stiffener
Details
     

 01-09-2013
4.00
riveted Right Elevator
Details
       

 01-07-2013
1.50
back rivet right elevator stiffeners
Details
       

 01-05-2013
5.25
pre elevator assembly
Details
       

 01-03-2013
1.50
right elevator work...substructure/skin
Details
       

 01-02-2013
2.00
elevator counterweight
Details
       

 01-01-2013
3.00
back to the elevators - cleaning up the stiffeners
Details
       

 12-31-2012
2.25
Bending rudder leading edge - 107.0 hours
Details
       

 12-30-2012
7.00
Rivet substructure and rudder skin
Details
       

 12-28-2012
2.50
Dimple and clean up rudder
Details
       

 12-27-2012
5.50
Bent the rudder - drill/deburr the skin/skeleton
Details
       

 12-26-2012
3.00
Elevator drilling and deburring
Details
       

 12-23-2012
2.75
Rudder sub structure
Details
       

 12-19-2012
2.25
Skip ahead to Elevators
Details
       

 12-18-2012
1.00
Rudder substructure (cont.)
Details

 12-17-2012
1.75
Started Rudder Substructure
Details
     

 12-15-2012
5.50
Prep stiffeners / rivet them to rudder skin
Details
       

 12-14-2012
1.00
Worked on vinyl elimination / match drilling
Details

 12-13-2012
1.50
Started the Rudder
Details
       

 12-13-2012
1.50
Finished the Vertical Stabilizer
Details
       

 12-11-2012
4.00
Riveting the VS together
Details
       

 12-09-2012
2.50
Finished the Horizontal Stab.!!!
Details
     

 12-08-2012
8.50
Prepped the VS for final Assembly
Details
       

 12-07-2012
2.00
Started the Vertical Stabilizer
Details
     

 12-06-2012
1.50
Finished up hs Skin rivets
Details
       

 12-05-2012
7.00
Boatloads of progress on HS skins today - with Bob
Details
       

 12-02-2012
0.00
1 month of building & Set up the kit log pro site!
Details

 11-27-2012
1.00
Went to see Jay Pratt
Details

 11-26-2012
1.00
Primed inside skin of Right HS
Details
     

 11-25-2012
1.00
Riveted 810/814 to front spar
Details

 11-24-2012
0.50
Torqued the bearing bolts
Details
       

 11-19-2012
2.50
Riveted the rear spar 603/609
Details
       

 11-18-2012
2.00
Primed the HS sub-structure
Details
       

 11-16-2012
4.50
Dimpled the substructure of the HS
Details
       

 11-15-2012
2.00
Removed the vinyl of HS substructure and skin
Details
       

 11-14-2012
3.00
Deburring, edge smoothing
Details
     

 11-11-2012
3.00
Drilling the horizontal Stabilizer (cont.)
Details

 11-10-2012
1.00
Still Drilling, deburring, dimpling...
Details
     

 11-08-2012
3.00
Still Drilling, deburring, dimpling...
Details
     

 11-07-2012
3.00
Drilling, deburring, dimpling...
Details
     

 11-06-2012
3.00
Drilling the horizontal Stabilizer
Details
       

 11-05-2012
3.00
Notched and prepped 404 ribs
Details
     

 11-01-2012
2.00
Taper and bend 810/814 reinforcement bar
Details
       

 10-31-2012
2.00
HS-603 / HS-609 work
Details

 10-30-2012
0.50
Elevator Bearing
Details
     

 10-29-2012
3.00
Rear Spar Assembly (cont.) Drill out all the holes
Details
       

 10-28-2012
3.00
Day 1 of the build…!! Rear Spar Assembly – HS-609
Details
       

 10-05-2012
0.00
Empennage Ordered - It arrived on 10/16/12
Details
       