KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
Work Logs Found: 14
Category Work Time: 21 Hours
 Date
Hours
Work Log Summary

Details

 06-07-2014
3.00
Speed Break assembly
Details
       

 08-01-2012
1.25
The final layup
Details
       

 08-01-2012
0.25
Sanding and fitting
Details
       

 07-30-2012
2.50
Glassing the cover
Details
       

 07-29-2012
0.00
Designing the actuator cover 2
Details
       

 07-29-2012
3.50
Designing the actuator cover
Details
       

 07-24-2012
1.00
Glassing the bracket
Details
       

 07-22-2012
0.50
Perfect on the first try!
Details
       

 07-21-2012
2.00
LB Mounting block floxed
Details
       

 07-18-2012
1.25
Mounting Plate design
Details
       

 07-16-2012
2.00
Landing brake install
Details
       

 07-14-2012
2.00
Electric Landing brake install
Details
       

 05-23-2012
0.50
Removing Landing brake ply tab
Details
     

 04-15-2012
1.00
Removing the manual landing brake hardware
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.