Date
|
Hours
|
Work Log Summary
|
Details
|
02-11-2017
|
7.00
|
Aileron - rigging adjustments
|
Details
|
|
|
02-10-2017
|
8.00
|
Preparing for DAR - Control & Condition Inspection
|
Details
|
|
|
11-15-2016
|
6.00
|
Flaps, and systems
|
Details
|
|
|
11-14-2016
|
5.00
|
Rigging - ailerons
|
Details
|
|
|
10-22-2016
|
5.00
|
Various - elev, ailerons, trim tab
|
Details
|
|
|
10-19-2016
|
9.00
|
Rigging - ailerons & elevator trim
|
Details
|
|
|
06-30-2016
|
5.00
|
Panel - more details
|
Details
|
|
|
01-06-2016
|
3.50
|
Rudder pedal control tubes
|
Details
|
|
|
12-24-2015
|
1.50
|
AP - Roll Servo linkage.
|
Details
|
|
|
12-19-2015
|
4.00
|
Control linkage, and Misc
|
Details
|
|
|
08-26-2015
|
3.00
|
Engine Controls - mounting
|
Details
|
|
|
03-01-2015
|
2.70
|
Removed Rudder Pedals - changes
|
Details
|
|
|
02-13-2015
|
2.00
|
Brake Lines - & Misc
|
Details
|
|
|
02-09-2015
|
1.70
|
Brake Lines - Left
|
Details
|
|
|
10-07-2014
|
2.00
|
Grips- Tosten
|
Details
|
|
|
10-26-2011
|
1.00
|
Trimmed Co-Pilot control stick
|
Details
|
|
|
09-25-2011
|
6.00
|
Control Stick and linkage
|
Details
|
|
|
09-24-2011
|
5.00
|
Aileron Tube rod-ends, trim & rivet
|
Details
|
|
|
12-07-2010
|
1.00
|
Mounts for Dynon pitch & roll servos
|
Details
|
|
|
02-06-2008
|
2.00
|
Stick Controls, fasteners
|
Details
|
|
|
02-02-2008
|
0.00
|
Manual Trim, ailerons (continued)
|
Details
|
|
|
02-02-2008
|
5.50
|
Manual aileron trim control
|
Details
|
|
|
01-26-2008
|
2.50
|
Rudder pedals, cable links
|
Details
|
|
|
01-19-2008
|
0.50
|
Elevator bellcrank
|
Details
|
|
|
08-14-2007
|
2.10
|
Platenuts to retain control stick brackets
|
Details
|
|
|
08-02-2007
|
0.00
|
Elev Trim Cable & Trim tab
|
Details
|
|
|
08-02-2007
|
2.20
|
Elev Trim Cable
|
Details
|
|
|
08-01-2007
|
2.50
|
Elev Trim Cable
|
Details
|
|
|
07-31-2007
|
3.00
|
Controls- Fuel, Trim, Flaps
|
Details
|
|
|
01-30-2007
|
1.00
|
Elev Push rod - F-689 rod end
|
Details
|
|
|
12-28-2006
|
4.50
|
Revisited elev push rod length
|
Details
|
|
|
12-27-2006
|
1.70
|
Bellcrank - elevator
|
Details
|
|
|
12-11-2006
|
2.00
|
Rough fit - flap bracket, Lt
|
Details
|
|
|
12-10-2006
|
2.50
|
Rough fit - flap bracket, Rt
|
Details
|
|
|
10-09-2006
|
0.20
|
Follow-up - Vans response
|
Details
|
|
|
10-07-2006
|
0.00
|
More pics - previous entry
|
Details
|
|
|
10-07-2006
|
3.10
|
Controls - primed, ends added
|
Details
|
|
|
10-06-2006
|
2.00
|
Seat floors - trimmed for
|
Details
|
|
|
10-05-2006
|
1.60
|
Seat floors - control stick holes
|
Details
|
|
|
10-04-2006
|
2.20
|
Control stick weldment - attachments
|
Details
|
|
|
10-03-2006
|
0.60
|
Drilled pedal attach bolts
|
Details
|
|
|
10-01-2006
|
0.00
|
More on rudder pedals
|
Details
|
|
|
10-01-2006
|
1.90
|
Fabricated the F-6118 bracket, locate pedals
|
Details
|
|
|
09-30-2006
|
1.90
|
Brake cylinders - attach
|
Details
|
|
|
09-28-2006
|
2.90
|
Flaps, Rudder pedals & controlsticks
|
Details
|
|
|
09-27-2006
|
1.90
|
Rudder pedal assembly
|
Details
|
|
|
09-27-2006
|
2.80
|
Control tube (weldment) clean-up
|
Details
|
|
|
08-14-2006
|
2.80
|
Fab'ed W-417 bellcranks for ailerons
|
Details
|
|
|
08-14-2006
|
2.20
|
Fab'ed F-635 bellcrank
|
Details
|
|
|
08-13-2006
|
6.50
|
Pilot & Co-Pilot rudder/brake pedals
|
Details
|
|