KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
Work Logs Found: 50
Category Work Time: 143 Hours
 Date
Hours
Work Log Summary

Details

 02-11-2017
7.00
Aileron - rigging adjustments
Details
       

 02-10-2017
8.00
Preparing for DAR - Control & Condition Inspection
Details
     

 11-15-2016
6.00
Flaps, and systems
Details
       

 11-14-2016
5.00
Rigging - ailerons
Details
       

 10-22-2016
5.00
Various - elev, ailerons, trim tab
Details
       

 10-19-2016
9.00
Rigging - ailerons & elevator trim
Details
       

 06-30-2016
5.00
Panel - more details
Details
       

 01-06-2016
3.50
Rudder pedal control tubes
Details
       

 12-24-2015
1.50
AP - Roll Servo linkage.
Details
       

 12-19-2015
4.00
Control linkage, and Misc
Details
       

 08-26-2015
3.00
Engine Controls - mounting
Details
       

 03-01-2015
2.70
Removed Rudder Pedals - changes
Details
       

 02-13-2015
2.00
Brake Lines - & Misc
Details
       

 02-09-2015
1.70
Brake Lines - Left
Details
       

 10-07-2014
2.00
Grips- Tosten
Details
       

 10-26-2011
1.00
Trimmed Co-Pilot control stick
Details
     

 09-25-2011
6.00
Control Stick and linkage
Details
       

 09-24-2011
5.00
Aileron Tube rod-ends, trim & rivet
Details
       

 12-07-2010
1.00
Mounts for Dynon pitch & roll servos
Details
       

 02-06-2008
2.00
Stick Controls, fasteners
Details

 02-02-2008
0.00
Manual Trim, ailerons (continued)
Details
       

 02-02-2008
5.50
Manual aileron trim control
Details
       

 01-26-2008
2.50
Rudder pedals, cable links
Details
       

 01-19-2008
0.50
Elevator bellcrank
Details
     

 08-14-2007
2.10
Platenuts to retain control stick brackets
Details
       

 08-02-2007
0.00
Elev Trim Cable & Trim tab
Details
       

 08-02-2007
2.20
Elev Trim Cable
Details
       

 08-01-2007
2.50
Elev Trim Cable
Details
       

 07-31-2007
3.00
Controls- Fuel, Trim, Flaps
Details
       

 01-30-2007
1.00
Elev Push rod - F-689 rod end
Details

 12-28-2006
4.50
Revisited elev push rod length
Details
       

 12-27-2006
1.70
Bellcrank - elevator
Details
     

 12-11-2006
2.00
Rough fit - flap bracket, Lt
Details
       

 12-10-2006
2.50
Rough fit - flap bracket, Rt
Details
       

 10-09-2006
0.20
Follow-up - Vans response
Details
     

 10-07-2006
0.00
More pics - previous entry
Details
       

 10-07-2006
3.10
Controls - primed, ends added
Details
       

 10-06-2006
2.00
Seat floors - trimmed for
Details
       

 10-05-2006
1.60
Seat floors - control stick holes
Details
       

 10-04-2006
2.20
Control stick weldment - attachments
Details
       

 10-03-2006
0.60
Drilled pedal attach bolts
Details
       

 10-01-2006
0.00
More on rudder pedals
Details
       

 10-01-2006
1.90
Fabricated the F-6118 bracket, locate pedals
Details
       

 09-30-2006
1.90
Brake cylinders - attach
Details
       

 09-28-2006
2.90
Flaps, Rudder pedals & controlsticks
Details
       

 09-27-2006
1.90
Rudder pedal assembly
Details
       

 09-27-2006
2.80
Control tube (weldment) clean-up
Details
       

 08-14-2006
2.80
Fab'ed W-417 bellcranks for ailerons
Details
       

 08-14-2006
2.20
Fab'ed F-635 bellcrank
Details
     

 08-13-2006
6.50
Pilot & Co-Pilot rudder/brake pedals
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.