Powered By Kitlog Pro v2.0
RV-6A - GBC
RV-6A QB
Controls
2-10-2017
< Previous Log Entry
Next Log Entry >
Date:
2-10-2017
Number of Hours:
8.00
Manual Reference:
Brief Description:
Preparing for DAR - Control & Condition Inspection
Spent the day mainly working through all the controls under the seat pans and checking, torqueing and cleaning the 10 yr old project for inspection.
Fitting washers into these tight spaces is a real pain, literally. My back, shoulders and arms are going to hurt from the awkward positions required.
Secured harnesses and safetied or tiewrapped the connectors where necessary.
Mike A (EAA228) spent some time doing a pre-inspection inspection to suggest any last minute problem areas for the DAR review.
Elevator tube forward Heim to controls
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-6A QB Home
Category
# Logs
# Hours
All
1255
3573
Avionics
77
222
Controls
50
143
Electrical
133
440
Empennage
48
140
Engine
126
392
Finishing Kit
165
457
Fuel System
51
156
Fuselage
317
864
Gear
37
87
Miscellaneous
45
109
None
9
13
QuickBuild RV-6A Kit
6
5
Shop Supplies
1
1
Tools
12
20
Wings
147
455
Workshop
31
69
Copyright © 2001-2024 Matronics. All Rights Reserved.