KitLog pro

Powered By Kitlog Pro v2.0

Patrick Kelley (Flion)
Work Logs Found: 180
Category Work Time: 632 Hours
 Date
Hours
Work Log Summary

Details

 08-12-2015
1.50
Final drill rear cabin top
Details
       

 08-03-2015
3.00
Miscellaneous panel forward
Details
       

 08-01-2015
5.00
Build and install flap torsion arm.
Details
       

 07-31-2015
2.30
Miscellaneous
Details
       

 07-28-2015
2.30
Rebuild access panel for AHRS
Details
       

 07-28-2015
1.00
Put cabin top on fuselage
Details
       

 07-27-2015
4.50
Add side vents, prepare for cabin top
Details
       

 07-23-2015
3.00
Baggage bulkhead and right side panel
Details
       

 07-22-2015
4.00
Miscellaneous, including front seats
Details
       

 07-21-2015
4.00
Right baggage floor and seat pan
Details
       

 07-20-2015
2.70
Match drill right baggage floor and seat
Details
       

 07-20-2015
2.50
Left baggage side and seat back closeout
Details
       

 07-20-2015
1.00
Add baggage door lock
Details
       

 07-18-2015
4.60
Attach baggage door
Details
       

 07-17-2015
4.00
Rivet baggage door
Details
       

 07-16-2015
1.50
Miscellaneous jobs
Details
       

 07-16-2015
2.20
Baggage door fabrication
Details
       

 07-15-2015
2.00
Misc plus finish riveting rear floor pans
Details
       

 07-14-2015
3.20
left rear seat pan and glass work
Details
       

 07-13-2015
2.20
Finish left baggage floor
Details
       

 07-12-2015
3.00
Rivet left baggage floor
Details
       

 07-11-2015
4.00
Left baggage floor with access plate
Details
       

 06-23-2015
3.00
close firewall openings
Details
       

 06-10-2015
3.00
Mod for remote oil filter
Details
       

 10-30-2014
1.00
Reinstall nose gear to engine mount
Details
       

 10-28-2014
0.00
Compliance with Service Bulletin
Details
       

 10-07-2014
2.00
Compliance with service bulletin
Details
       

 07-11-2014
3.00
Install aft rudder cable guides and fairings
Details
       

 08-12-2013
5.00
Remove cabin top, misc.
Details
       

 08-08-2013
4.00
Firewall work
Details
       

 08-08-2013
2.00
Finish installing pilot side door
Details
     

 08-05-2013
5.00
Copilot door strut and pilot door latch
Details
       

 08-03-2013
2.00
Finish door latch pins - copilot door
Details
       

 08-03-2013
2.00
Door pin guide installation - copilot door
Details
       

 07-31-2013
3.00
Door hinges and strut mount
Details
       

 07-26-2013
6.00
Assemble inner door handles
Details
       

 07-24-2013
5.00
Final fit pilot door; hinge work
Details
       

 07-23-2013
3.00
Trim pilot side door plus misc.
Details
       

 07-20-2013
5.50
Miscellaneous fun
Details
       

 07-18-2013
4.00
Hinge copilot door
Details
       

 07-14-2013
1.00
Modifications to door latch
Details

 07-13-2013
4.00
Doors and sunshades
Details
       

 07-12-2013
2.00
Bond the copilot side door
Details

 07-11-2013
4.00
prepare copilot door for bonding
Details
       

 07-11-2013
1.00
Drill the cabin brace to the cabin shell
Details
       

 07-11-2013
1.00
Assemble the door latch gear
Details
       

 07-10-2013
2.00
Glued pilot door halves together
Details
       

 07-09-2013
1.00
Install the door strut braces
Details
       

 07-09-2013
3.00
Cut door opening and copilot door
Details
       

 07-08-2013
4.00
Begin copilot side door
Details
       

 07-06-2013
4.00
Trim and fit pilot door halves together
Details
       

 07-04-2013
2.00
Trial fit of pilot door
Details
       

 06-26-2013
1.00
Misc control stuff
Details
       

 06-24-2013
5.00
Assemble control sticks
Details
       

 06-23-2013
6.00
Control System pushrods
Details
       

 06-10-2013
4.00
install left rear floor, windscreen brace
Details
       

 06-08-2013
4.50
Drill cabin top to airframe
Details
       

 06-07-2013
2.00
More cabin top trimming
Details
       

 06-06-2013
4.00
Trim cabin cover to fit
Details
     

 06-01-2013
2.50
Mark the fuselage and rough cut the cabin
Details
       

 05-30-2013
6.00
Miscellaneous baggage floor plus mods
Details
       

 05-11-2013
2.50
Rivet sub-panel together
Details
       

 05-08-2013
1.50
Install caterpillar grommet in subpanel
Details
       

 06-22-2012
1.20
Added custom pedal pads
Details
       

 06-16-2012
3.50
Install brakes, rudder cables
Details
       

 06-15-2012
2.00
Install rudder pedal brake lines
Details
       

 06-14-2012
3.00
Finish Ground Power Receptacle Mount
Details
       

 06-13-2012
1.00
Fabrication of External Power Mount
Details
       

 06-12-2012
3.00
Installed rudder pedal assemblies
Details
       

 06-09-2012
4.00
Install fuselage fuel system components
Details
       

 06-08-2012
4.00
Assemble pedals and master cylinders
Details
       

 06-07-2012
3.00
Build pedals, install brake reservoir
Details
       

 06-03-2012
2.00
Fuel System fabrication
Details
       

 06-02-2012
5.00
Installed the fuselage hard brake lines
Details
       

 06-01-2012
1.50
Assembled left baggage floor stiffeners
Details
     

 05-30-2012
5.00
Install left baggage floor and etc.
Details
       

 05-29-2012
5.00
Rivet Right Rear Floor, Fuselage Join
Details
       

 05-17-2012
4.00
Finish left step, then right step
Details
       

 05-16-2012
2.50
Drill left step, install second A/C hose
Details
       

 12-18-2011
2.00
Install panel flanges and hand holds
Details
       

 12-17-2011
3.00
Installed the forward deck skin
Details
       

 12-15-2011
2.00
Begin assembling panel flanges
Details
       

 12-13-2011
1.00
Assembled sub-panel structure
Details
       

 12-01-2011
1.00
Started riveting in the right aft floor
Details
       

 11-26-2011
1.00
Prepare right rear floor for riveting
Details
     

 10-30-2011
3.00
Rear floor pan install
Details
       

 10-26-2011
4.50
Riveting and inital seat install
Details
       

 10-25-2011
5.00
Miscellaneous tasks
Details
       

 10-23-2011
3.50
Assemble wheels
Details
       

 10-21-2011
2.00
Rivet left side mid-fuselage deck
Details
     

 10-20-2011
5.20
Prepare gear legs for wheels
Details
       

 10-19-2011
4.50
Dimple and prepare fuselage for join
Details
       

 10-18-2011
2.70
Countersink fuselage join, mid-fuse deck
Details
       

 10-16-2011
3.00
More fuselage mating work
Details
       

 10-15-2011
3.00
Install gear legs
Details
       

 10-15-2011
3.00
Inital mating of fuselage halves
Details
       

 10-13-2011
3.40
Install main landing gear mounts
Details
       

 10-11-2011
8.00
Installing the forward fuselage floors
Details
       

 09-30-2011
2.00
Riveting side skins - final part
Details
       

 09-29-2011
6.00
Riveting side skins part 4
Details
       

 09-12-2011
3.20
Riveting side skins part 3
Details
       

 09-10-2011
7.00
Riveting forward side skins part 2
Details
       

 09-09-2011
3.50
Riveting forward side skins
Details
       

 09-05-2011
1.00
Rivet aft top tailcone skin
Details
       

 09-01-2011
3.00
Assemble subpanel structure
Details
       

 08-30-2011
4.00
Miscellaneous fabrication
Details
       

 08-23-2011
6.50
Riveting rear side skin, deck, etc.
Details
       

 08-22-2011
4.30
Rivel left side tailcone skin
Details
       

 08-20-2011
4.00
Prepare right side skins for riveting
Details
       

 08-19-2011
5.00
Assembled right side structure
Details
       

 08-17-2011
6.00
Rivet tailcone right side skin
Details
       

 08-15-2011
6.00
Riveted left substructure together
Details
       

 08-13-2011
7.00
Prepare left skin and structure for riveting
Details
       

 08-11-2011
3.60
Prepare for riveting
Details
       

 07-06-2011
4.50
Match-drill the forward fuselage structure
Details
       

 07-05-2011
6.80
Match drill forward left side skin
Details
       

 07-04-2011
6.20
Match drill fwd side skins
Details
       

 07-03-2011
3.00
Forward side skin structure
Details
       

 07-02-2011
10.30
Fabricate and match-drill aft side skins
Details
       

 06-30-2011
7.50
Building stucture for fuselage sides
Details
       

 06-29-2011
3.40
Riveting the parts from yesterday
Details
       

 06-28-2011
4.80
Misc. fuselage fabrication
Details
       

 06-27-2011
5.80
Final drill gear towers to fuselage
Details
       

 06-25-2011
1.00
Trial fitting the gear towers
Details
       

 06-24-2011
3.20
Bolt and rivet the foward bulkhead
Details
       

 06-23-2011
3.80
Mated the forward and center sections
Details
       

 06-22-2011
3.50
Finish riveting and mate fwd and mid fuselage
Details
       

 06-20-2011
6.40
Prepare forward fuselage for riveting
Details
       

 06-19-2011
2.00
Start disassebmling fwd fuselage, prep for rivetin
Details
       

 06-17-2011
2.00
Match-drilled bottom skins and left fuel tank baff
Details

 06-16-2011
4.30
Mate the forward and mid- fuselage.
Details
       

 05-30-2011
6.00
Dimple and rivet bottom fuselage skins
Details
       

 02-13-2011
2.00
Drill out the floors and add the fwd center sectio
Details
       

 02-11-2011
2.30
Forward bottom skin and floor assembly
Details
       

 02-01-2011
3.20
Forward Fuselage Bulkhead Assembly
Details
       

 01-29-2011
1.00
Milling the control column mounts
Details
       

 01-25-2011
1.60
Assemble forward bottom skin and stiffeners
Details
       

 01-23-2011
3.00
Assemble left and right seat bulkhead assemblies
Details
       

 01-22-2011
2.00
Rivet borward seat bulkhead parts
Details
       

 01-18-2011
3.00
Misc. Forward Spar bulkhead/seat parts
Details
       

 01-17-2011
4.00
Riveted the left rib and both ribs to the firewall
Details
       

 01-16-2011
2.00
Riveted the right rib subassembly
Details
       

 01-15-2011
2.50
Assembled forward rib subassemblies
Details
       

 01-13-2011
3.50
Firewall assembly
Details
       

 01-12-2011
3.50
Installed eyeball hardware in firewall recess
Details
       

 01-10-2011
4.50
Countersink/dimple firewall parts, begin riveting
Details
       

 01-08-2011
3.50
Deburr firewall parts
Details

 01-05-2011
4.00
Assemble firewall
Details
       

 01-04-2011
6.30
Match drilled bottom skins to structure
Details
       

 01-03-2011
4.00
Deburr and rivet baggage bulkhead and floor ribs
Details
       

 12-29-2010
3.00
Rivet rear seat ribs, fit baggage ribs
Details
       

 12-28-2010
4.50
Rivet aft spar bulkhead
Details
       

 12-27-2010
5.00
Assemble rear spar and seat ribs
Details
       

 12-26-2010
4.00
Riveted outboard seat ribs, assembled to rear spar
Details
       

 12-22-2010
3.00
Fuselage ribs aft of spar
Details
       

 06-16-2010
1.50
Assemble oxygen tank mount and bellcrank
Details
       

 06-09-2010
6.00
More systems installation planning and install
Details
       

 06-07-2010
5.00
Riveted bellcrank rib assemblies, systems installa
Details
       

 06-06-2010
6.00
Tailcone prep / register assembly and riveting
Details
       

 06-05-2010
6.00
riveting bottom tailcone skin, dimpling
Details
       

 06-04-2010
4.00
Deburr and riveting
Details
       

 06-03-2010
2.00
Nutplates to rear center bulkhead, inboard seat ri
Details
       

 06-02-2010
1.50
Fuselage bulkhead riveting
Details
       

 06-01-2010
4.00
Riveting wing spar aft bulkhead, tail cone
Details
       

 05-29-2010
5.50
Assembled rear spar bulkhead
Details
       

 05-27-2010
4.00
Assemble aft wing carrythrough bulkhead
Details
       

 05-26-2010
3.50
Assemble aft wing spar carrythrough
Details
       

 05-25-2010
6.00
Bulkhead riveting; other assembly
Details
       

 05-23-2010
3.00
Assembly of forward center spar carrythrough
Details
       

 05-20-2010
4.00
Match Drill landing gear mounts to spar
Details
       

 05-19-2010
6.00
Modify battery mount, cut A/C louvers
Details
       

 05-18-2010
1.50
Forward spar fabrication
Details
       

 11-21-2009
3.50
Riveted last three tailcone bulkheads
Details
       

 11-20-2009
3.00
Disassemble tailcone for deburr and dimple
Details
     

 11-19-2009
2.60
Installed the rear deck
Details
       

 11-17-2009
7.00
Match Drilling; adding top skins
Details
       

 11-15-2009
4.00
Added longerons, rear deck
Details
       

 11-13-2009
3.70
Tail cone skeleton assembly and skinning
Details
       

 11-12-2009
3.50
Assemble tail cone skeleton
Details
       

 11-10-2009
3.00
Assemble the rear two bulkheads
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.