Date
|
Hours
|
Work Log Summary
|
Details
|
08-12-2015
|
1.50
|
Final drill rear cabin top
|
Details
|
|
|
08-03-2015
|
3.00
|
Miscellaneous panel forward
|
Details
|
|
|
08-01-2015
|
5.00
|
Build and install flap torsion arm.
|
Details
|
|
|
07-31-2015
|
2.30
|
Miscellaneous
|
Details
|
|
|
07-28-2015
|
2.30
|
Rebuild access panel for AHRS
|
Details
|
|
|
07-28-2015
|
1.00
|
Put cabin top on fuselage
|
Details
|
|
|
07-27-2015
|
4.50
|
Add side vents, prepare for cabin top
|
Details
|
|
|
07-23-2015
|
3.00
|
Baggage bulkhead and right side panel
|
Details
|
|
|
07-22-2015
|
4.00
|
Miscellaneous, including front seats
|
Details
|
|
|
07-21-2015
|
4.00
|
Right baggage floor and seat pan
|
Details
|
|
|
07-20-2015
|
2.70
|
Match drill right baggage floor and seat
|
Details
|
|
|
07-20-2015
|
2.50
|
Left baggage side and seat back closeout
|
Details
|
|
|
07-20-2015
|
1.00
|
Add baggage door lock
|
Details
|
|
|
07-18-2015
|
4.60
|
Attach baggage door
|
Details
|
|
|
07-17-2015
|
4.00
|
Rivet baggage door
|
Details
|
|
|
07-16-2015
|
1.50
|
Miscellaneous jobs
|
Details
|
|
|
07-16-2015
|
2.20
|
Baggage door fabrication
|
Details
|
|
|
07-15-2015
|
2.00
|
Misc plus finish riveting rear floor pans
|
Details
|
|
|
07-14-2015
|
3.20
|
left rear seat pan and glass work
|
Details
|
|
|
07-13-2015
|
2.20
|
Finish left baggage floor
|
Details
|
|
|
07-12-2015
|
3.00
|
Rivet left baggage floor
|
Details
|
|
|
07-11-2015
|
4.00
|
Left baggage floor with access plate
|
Details
|
|
|
06-23-2015
|
3.00
|
close firewall openings
|
Details
|
|
|
06-10-2015
|
3.00
|
Mod for remote oil filter
|
Details
|
|
|
10-30-2014
|
1.00
|
Reinstall nose gear to engine mount
|
Details
|
|
|
10-28-2014
|
0.00
|
Compliance with Service Bulletin
|
Details
|
|
|
10-07-2014
|
2.00
|
Compliance with service bulletin
|
Details
|
|
|
07-11-2014
|
3.00
|
Install aft rudder cable guides and fairings
|
Details
|
|
|
08-12-2013
|
5.00
|
Remove cabin top, misc.
|
Details
|
|
|
08-08-2013
|
4.00
|
Firewall work
|
Details
|
|
|
08-08-2013
|
2.00
|
Finish installing pilot side door
|
Details
|
|
|
08-05-2013
|
5.00
|
Copilot door strut and pilot door latch
|
Details
|
|
|
08-03-2013
|
2.00
|
Finish door latch pins - copilot door
|
Details
|
|
|
08-03-2013
|
2.00
|
Door pin guide installation - copilot door
|
Details
|
|
|
07-31-2013
|
3.00
|
Door hinges and strut mount
|
Details
|
|
|
07-26-2013
|
6.00
|
Assemble inner door handles
|
Details
|
|
|
07-24-2013
|
5.00
|
Final fit pilot door; hinge work
|
Details
|
|
|
07-23-2013
|
3.00
|
Trim pilot side door plus misc.
|
Details
|
|
|
07-20-2013
|
5.50
|
Miscellaneous fun
|
Details
|
|
|
07-18-2013
|
4.00
|
Hinge copilot door
|
Details
|
|
|
07-14-2013
|
1.00
|
Modifications to door latch
|
Details
|
|
|
07-13-2013
|
4.00
|
Doors and sunshades
|
Details
|
|
|
07-12-2013
|
2.00
|
Bond the copilot side door
|
Details
|
|
|
07-11-2013
|
4.00
|
prepare copilot door for bonding
|
Details
|
|
|
07-11-2013
|
1.00
|
Drill the cabin brace to the cabin shell
|
Details
|
|
|
07-11-2013
|
1.00
|
Assemble the door latch gear
|
Details
|
|
|
07-10-2013
|
2.00
|
Glued pilot door halves together
|
Details
|
|
|
07-09-2013
|
1.00
|
Install the door strut braces
|
Details
|
|
|
07-09-2013
|
3.00
|
Cut door opening and copilot door
|
Details
|
|
|
07-08-2013
|
4.00
|
Begin copilot side door
|
Details
|
|
|
07-06-2013
|
4.00
|
Trim and fit pilot door halves together
|
Details
|
|
|
07-04-2013
|
2.00
|
Trial fit of pilot door
|
Details
|
|
|
06-26-2013
|
1.00
|
Misc control stuff
|
Details
|
|
|
06-24-2013
|
5.00
|
Assemble control sticks
|
Details
|
|
|
06-23-2013
|
6.00
|
Control System pushrods
|
Details
|
|
|
06-10-2013
|
4.00
|
install left rear floor, windscreen brace
|
Details
|
|
|
06-08-2013
|
4.50
|
Drill cabin top to airframe
|
Details
|
|
|
06-07-2013
|
2.00
|
More cabin top trimming
|
Details
|
|
|
06-06-2013
|
4.00
|
Trim cabin cover to fit
|
Details
|
|
|
06-01-2013
|
2.50
|
Mark the fuselage and rough cut the cabin
|
Details
|
|
|
05-30-2013
|
6.00
|
Miscellaneous baggage floor plus mods
|
Details
|
|
|
05-11-2013
|
2.50
|
Rivet sub-panel together
|
Details
|
|
|
05-08-2013
|
1.50
|
Install caterpillar grommet in subpanel
|
Details
|
|
|
06-22-2012
|
1.20
|
Added custom pedal pads
|
Details
|
|
|
06-16-2012
|
3.50
|
Install brakes, rudder cables
|
Details
|
|
|
06-15-2012
|
2.00
|
Install rudder pedal brake lines
|
Details
|
|
|
06-14-2012
|
3.00
|
Finish Ground Power Receptacle Mount
|
Details
|
|
|
06-13-2012
|
1.00
|
Fabrication of External Power Mount
|
Details
|
|
|
06-12-2012
|
3.00
|
Installed rudder pedal assemblies
|
Details
|
|
|
06-09-2012
|
4.00
|
Install fuselage fuel system components
|
Details
|
|
|
06-08-2012
|
4.00
|
Assemble pedals and master cylinders
|
Details
|
|
|
06-07-2012
|
3.00
|
Build pedals, install brake reservoir
|
Details
|
|
|
06-03-2012
|
2.00
|
Fuel System fabrication
|
Details
|
|
|
06-02-2012
|
5.00
|
Installed the fuselage hard brake lines
|
Details
|
|
|
06-01-2012
|
1.50
|
Assembled left baggage floor stiffeners
|
Details
|
|
|
05-30-2012
|
5.00
|
Install left baggage floor and etc.
|
Details
|
|
|
05-29-2012
|
5.00
|
Rivet Right Rear Floor, Fuselage Join
|
Details
|
|
|
05-17-2012
|
4.00
|
Finish left step, then right step
|
Details
|
|
|
05-16-2012
|
2.50
|
Drill left step, install second A/C hose
|
Details
|
|
|
12-18-2011
|
2.00
|
Install panel flanges and hand holds
|
Details
|
|
|
12-17-2011
|
3.00
|
Installed the forward deck skin
|
Details
|
|
|
12-15-2011
|
2.00
|
Begin assembling panel flanges
|
Details
|
|
|
12-13-2011
|
1.00
|
Assembled sub-panel structure
|
Details
|
|
|
12-01-2011
|
1.00
|
Started riveting in the right aft floor
|
Details
|
|
|
11-26-2011
|
1.00
|
Prepare right rear floor for riveting
|
Details
|
|
|
10-30-2011
|
3.00
|
Rear floor pan install
|
Details
|
|
|
10-26-2011
|
4.50
|
Riveting and inital seat install
|
Details
|
|
|
10-25-2011
|
5.00
|
Miscellaneous tasks
|
Details
|
|
|
10-23-2011
|
3.50
|
Assemble wheels
|
Details
|
|
|
10-21-2011
|
2.00
|
Rivet left side mid-fuselage deck
|
Details
|
|
|
10-20-2011
|
5.20
|
Prepare gear legs for wheels
|
Details
|
|
|
10-19-2011
|
4.50
|
Dimple and prepare fuselage for join
|
Details
|
|
|
10-18-2011
|
2.70
|
Countersink fuselage join, mid-fuse deck
|
Details
|
|
|
10-16-2011
|
3.00
|
More fuselage mating work
|
Details
|
|
|
10-15-2011
|
3.00
|
Install gear legs
|
Details
|
|
|
10-15-2011
|
3.00
|
Inital mating of fuselage halves
|
Details
|
|
|
10-13-2011
|
3.40
|
Install main landing gear mounts
|
Details
|
|
|
10-11-2011
|
8.00
|
Installing the forward fuselage floors
|
Details
|
|
|
09-30-2011
|
2.00
|
Riveting side skins - final part
|
Details
|
|
|
09-29-2011
|
6.00
|
Riveting side skins part 4
|
Details
|
|
|
09-12-2011
|
3.20
|
Riveting side skins part 3
|
Details
|
|
|
09-10-2011
|
7.00
|
Riveting forward side skins part 2
|
Details
|
|
|
09-09-2011
|
3.50
|
Riveting forward side skins
|
Details
|
|
|
09-05-2011
|
1.00
|
Rivet aft top tailcone skin
|
Details
|
|
|
09-01-2011
|
3.00
|
Assemble subpanel structure
|
Details
|
|
|
08-30-2011
|
4.00
|
Miscellaneous fabrication
|
Details
|
|
|
08-23-2011
|
6.50
|
Riveting rear side skin, deck, etc.
|
Details
|
|
|
08-22-2011
|
4.30
|
Rivel left side tailcone skin
|
Details
|
|
|
08-20-2011
|
4.00
|
Prepare right side skins for riveting
|
Details
|
|
|
08-19-2011
|
5.00
|
Assembled right side structure
|
Details
|
|
|
08-17-2011
|
6.00
|
Rivet tailcone right side skin
|
Details
|
|
|
08-15-2011
|
6.00
|
Riveted left substructure together
|
Details
|
|
|
08-13-2011
|
7.00
|
Prepare left skin and structure for riveting
|
Details
|
|
|
08-11-2011
|
3.60
|
Prepare for riveting
|
Details
|
|
|
07-06-2011
|
4.50
|
Match-drill the forward fuselage structure
|
Details
|
|
|
07-05-2011
|
6.80
|
Match drill forward left side skin
|
Details
|
|
|
07-04-2011
|
6.20
|
Match drill fwd side skins
|
Details
|
|
|
07-03-2011
|
3.00
|
Forward side skin structure
|
Details
|
|
|
07-02-2011
|
10.30
|
Fabricate and match-drill aft side skins
|
Details
|
|
|
06-30-2011
|
7.50
|
Building stucture for fuselage sides
|
Details
|
|
|
06-29-2011
|
3.40
|
Riveting the parts from yesterday
|
Details
|
|
|
06-28-2011
|
4.80
|
Misc. fuselage fabrication
|
Details
|
|
|
06-27-2011
|
5.80
|
Final drill gear towers to fuselage
|
Details
|
|
|
06-25-2011
|
1.00
|
Trial fitting the gear towers
|
Details
|
|
|
06-24-2011
|
3.20
|
Bolt and rivet the foward bulkhead
|
Details
|
|
|
06-23-2011
|
3.80
|
Mated the forward and center sections
|
Details
|
|
|
06-22-2011
|
3.50
|
Finish riveting and mate fwd and mid fuselage
|
Details
|
|
|
06-20-2011
|
6.40
|
Prepare forward fuselage for riveting
|
Details
|
|
|
06-19-2011
|
2.00
|
Start disassebmling fwd fuselage, prep for rivetin
|
Details
|
|
|
06-17-2011
|
2.00
|
Match-drilled bottom skins and left fuel tank baff
|
Details
|
|
|
06-16-2011
|
4.30
|
Mate the forward and mid- fuselage.
|
Details
|
|
|
05-30-2011
|
6.00
|
Dimple and rivet bottom fuselage skins
|
Details
|
|
|
02-13-2011
|
2.00
|
Drill out the floors and add the fwd center sectio
|
Details
|
|
|
02-11-2011
|
2.30
|
Forward bottom skin and floor assembly
|
Details
|
|
|
02-01-2011
|
3.20
|
Forward Fuselage Bulkhead Assembly
|
Details
|
|
|
01-29-2011
|
1.00
|
Milling the control column mounts
|
Details
|
|
|
01-25-2011
|
1.60
|
Assemble forward bottom skin and stiffeners
|
Details
|
|
|
01-23-2011
|
3.00
|
Assemble left and right seat bulkhead assemblies
|
Details
|
|
|
01-22-2011
|
2.00
|
Rivet borward seat bulkhead parts
|
Details
|
|
|
01-18-2011
|
3.00
|
Misc. Forward Spar bulkhead/seat parts
|
Details
|
|
|
01-17-2011
|
4.00
|
Riveted the left rib and both ribs to the firewall
|
Details
|
|
|
01-16-2011
|
2.00
|
Riveted the right rib subassembly
|
Details
|
|
|
01-15-2011
|
2.50
|
Assembled forward rib subassemblies
|
Details
|
|
|
01-13-2011
|
3.50
|
Firewall assembly
|
Details
|
|
|
01-12-2011
|
3.50
|
Installed eyeball hardware in firewall recess
|
Details
|
|
|
01-10-2011
|
4.50
|
Countersink/dimple firewall parts, begin riveting
|
Details
|
|
|
01-08-2011
|
3.50
|
Deburr firewall parts
|
Details
|
|
|
01-05-2011
|
4.00
|
Assemble firewall
|
Details
|
|
|
01-04-2011
|
6.30
|
Match drilled bottom skins to structure
|
Details
|
|
|
01-03-2011
|
4.00
|
Deburr and rivet baggage bulkhead and floor ribs
|
Details
|
|
|
12-29-2010
|
3.00
|
Rivet rear seat ribs, fit baggage ribs
|
Details
|
|
|
12-28-2010
|
4.50
|
Rivet aft spar bulkhead
|
Details
|
|
|
12-27-2010
|
5.00
|
Assemble rear spar and seat ribs
|
Details
|
|
|
12-26-2010
|
4.00
|
Riveted outboard seat ribs, assembled to rear spar
|
Details
|
|
|
12-22-2010
|
3.00
|
Fuselage ribs aft of spar
|
Details
|
|
|
06-16-2010
|
1.50
|
Assemble oxygen tank mount and bellcrank
|
Details
|
|
|
06-09-2010
|
6.00
|
More systems installation planning and install
|
Details
|
|
|
06-07-2010
|
5.00
|
Riveted bellcrank rib assemblies, systems installa
|
Details
|
|
|
06-06-2010
|
6.00
|
Tailcone prep / register assembly and riveting
|
Details
|
|
|
06-05-2010
|
6.00
|
riveting bottom tailcone skin, dimpling
|
Details
|
|
|
06-04-2010
|
4.00
|
Deburr and riveting
|
Details
|
|
|
06-03-2010
|
2.00
|
Nutplates to rear center bulkhead, inboard seat ri
|
Details
|
|
|
06-02-2010
|
1.50
|
Fuselage bulkhead riveting
|
Details
|
|
|
06-01-2010
|
4.00
|
Riveting wing spar aft bulkhead, tail cone
|
Details
|
|
|
05-29-2010
|
5.50
|
Assembled rear spar bulkhead
|
Details
|
|
|
05-27-2010
|
4.00
|
Assemble aft wing carrythrough bulkhead
|
Details
|
|
|
05-26-2010
|
3.50
|
Assemble aft wing spar carrythrough
|
Details
|
|
|
05-25-2010
|
6.00
|
Bulkhead riveting; other assembly
|
Details
|
|
|
05-23-2010
|
3.00
|
Assembly of forward center spar carrythrough
|
Details
|
|
|
05-20-2010
|
4.00
|
Match Drill landing gear mounts to spar
|
Details
|
|
|
05-19-2010
|
6.00
|
Modify battery mount, cut A/C louvers
|
Details
|
|
|
05-18-2010
|
1.50
|
Forward spar fabrication
|
Details
|
|
|
11-21-2009
|
3.50
|
Riveted last three tailcone bulkheads
|
Details
|
|
|
11-20-2009
|
3.00
|
Disassemble tailcone for deburr and dimple
|
Details
|
|
|
11-19-2009
|
2.60
|
Installed the rear deck
|
Details
|
|
|
11-17-2009
|
7.00
|
Match Drilling; adding top skins
|
Details
|
|
|
11-15-2009
|
4.00
|
Added longerons, rear deck
|
Details
|
|
|
11-13-2009
|
3.70
|
Tail cone skeleton assembly and skinning
|
Details
|
|
|
11-12-2009
|
3.50
|
Assemble tail cone skeleton
|
Details
|
|
|
11-10-2009
|
3.00
|
Assemble the rear two bulkheads
|
Details
|
|