Powered By Kitlog Pro v2.0
Chris's RV-14A Site
RV-14A
Final assembly
Work Logs Found:
22
Category Work Time:
97 Hours
Date
Hours
Work Log Summary
Details
12-01-2018
1.00
First oil change
Details
11-30-2018
5.00
Pants on and flight testing
Details
11-24-2018
2.00
Details
11-04-2018
0.10
First flight
Details
10-23-2018
3.00
RV-14 dual time and training
Details
10-18-2018
4.00
Airworthiness Certificate issued
Details
10-05-2018
3.00
Fuse panel and wing tips
Details
10-04-2018
5.00
engine start
Details
10-03-2018
4.00
Install cooler and solenoid
Details
10-02-2018
5.00
Engine oiling
Details
10-01-2018
6.00
Heat muffs / scat tubes
Details
09-30-2018
6.00
GAP 26 pitot install
Details
09-29-2018
6.00
Weight and balance
Details
09-26-2018
4.00
Snorkel and filter
Details
09-25-2018
6.00
Fuel flow testing
Details
09-24-2018
5.00
Engine prep
Details
09-21-2018
6.00
ailerons
Details
09-20-2018
6.00
Flaps install
Details
09-19-2018
3.00
Wing gap fillers
Details
09-16-2018
5.00
Installed wings and final torque
Details
09-14-2018
5.00
More tail asssembly
Details
09-13-2018
7.00
Tail assembly
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
517
2694
Avionics
59
320
Avionics/Electrical
59
320
Empennage
38
157
Engine
24
111
Final assembly
22
97
Finish Kit
34
170
Firewall Forward
11
49
Fuselage
112
667
Miscellaneous
4
8
Painting
38
218
Prop
1
2
Rear Fuselage
14
67
Shop Supplies
1
4
Wings
100
504
Copyright © 2001-2025 Matronics. All Rights Reserved.