Powered By Kitlog Pro v2.0
Doug's Web Site
CH 750 Cruzer
Wiring
Work Logs Found:
27
Category Work Time:
97 Hours
Date
Hours
Work Log Summary
Details
01-09-2019
4.00
Trim plug and Rewired trim widgets
Details
12-21-2018
3.00
Found the Trim indicator problem
Details
05-27-2018
4.50
PVC cover for flaperon weight
Details
05-18-2018
5.00
Added fuel shutoff valve, found wiring fault
Details
05-09-2018
3.50
Wired plugs for strobes,lights
Details
03-29-2018
4.00
Finished wiring and intercom
Details
03-10-2018
3.00
Constructed ExBus ground wire
Details
12-22-2017
3.00
Wired the start switch
Details
12-19-2017
2.00
Added mounting piece to CBs
Details
12-14-2017
3.00
Bundled wires
Details
12-07-2017
3.50
Moved CBs from panel to console
Details
12-03-2017
4.50
Wiring
Details
11-15-2017
3.50
Tamining wires; Cabin Heat flexible wire
Details
11-09-2017
3.00
Cut wires for main power
Details
11-07-2017
4.00
Wired relays, fuel pumps
Details
11-01-2017
3.50
Finished intercom and comm wiring
Details
10-30-2017
3.00
Installed grounding wires for fuel pumps
Details
10-25-2017
3.50
Wired stick
Details
10-23-2017
3.00
Added second battery
Details
10-18-2017
4.00
Wired autopilot, trim and flaps
Details
10-11-2017
4.00
Wired switches and bundles
Details
10-09-2017
3.00
Wired Nav/Strobe switches
Details
10-04-2017
4.00
Wired network
Details
08-05-2017
4.00
Installed capacitor and ECU
Details
07-19-2017
5.00
Separating, labeling, wires
Details
07-14-2017
3.00
Cut wires and installed terminals
Details
07-12-2017
3.50
Installed wiring for USB and Dome light
Details
SITE NAVIGATION
Contact Builder
CH 750 Cruzer Home
Category
# Logs
# Hours
All
323
1149
Aircraft
1
5
Avionics
5
16
Avionics
16
61
Avionics
38
126
Brakes
38
126
Controls
20
72
Cowl
16
61
Doors
11
38
Empennage
7
26
Engine
29
112
Fuel
9
32
Fuselage
50
184
Miscellaneous
3
8
W&B
38
126
Windows
4
14
Wings
11
45
Wiring
27
97
Copyright © 2001-2024 Matronics. All Rights Reserved.