KitLog pro

Powered By Kitlog Pro v2.0

Mark's Web Site
Work Logs Found: 632
Category Work Time: 1257 Hours
 Date
Hours
Work Log Summary

Details

 06-06-2019
0.00
First pictures of painted fuselage
Details
       

 06-01-2019
0.00
In the paint booth
Details
       

 04-27-2019
0.00
Flight to Paint shop - Smoketown, PA
Details
       

 04-26-2019
10.00
Finish fairings and prep for paint
Details
       

 04-24-2019
5.00
Nose wheel fairing (36is)
Details
       

 04-23-2019
2.00
Nose wheel & gear leg fairing (36is)
Details
       

 04-22-2019
1.00
More tools needed (36is)
Details
       

 04-20-2019
1.00
Complete nose fork (35 & 36is)
Details
       

 04-19-2019
2.00
Paint nose wheel fork (35)
Details
       

 04-15-2019
8.00
Re-install main gear
Details
       

 04-13-2019
10.00
Remove and paint main gear legs (35)
Details
       

 04-06-2019
10.00
Main Wheel Fairings (36A)
Details
       

 03-27-2019
0.00
Flight to paint shop
Details
       

 02-17-2019
0.00
First flight with Cyndi
Details
       

 02-16-2019
0.00
Flight Testing (PAP-F5)
Details
       

 02-09-2019
0.00
Flight Testing (PAP-F4)
Details
       

 02-02-2019
2.00
Wheel Fairings (36-03)
Details
       

 01-27-2019
1.00
Wheel Fairings (36-02)
Details
       

 01-26-2019
0.00
Flight Testing (PAP-F3)
Details
       

 01-12-2019
0.00
Flight Testing (PAP-F2)
Details
       

 12-07-2018
2.00
Flight Testing (PAP-F1)
Details
       

 12-04-2018
1.00
N418MJ First Flight RV-12 S/N 120812
Details
       

 12-02-2018
2.00
Carb Synchronization (PAP - G6)
Details
       

 11-20-2018
1.00
Airworthiness Certificate
Details
       

 11-02-2018
3.00
Fuel Calibration (PAP - G8)
Details
       

 10-29-2018
1.00
Add N number to interior (PAP - G9)
Details
       

 10-25-2018
1.00
Weight & Balance (PAP - G7)
Details
       

 10-24-2018
3.00
Weight & Balance (PAP - G7)
Details
       

 10-13-2018
0.00
Transition Training
Details
       

 09-29-2018
1.00
Calibrate Compass (PAP-T1)
Details
       

 09-17-2018
0.00
Rebuild the work shop at the hanger
Details
       

 09-15-2018
3.00
Moved plane to hanger - I68
Details
       

 09-10-2018
2.00
Tail cone install (12-11)
Details
       

 09-09-2018
2.00
Tail cone plate nuts (12-10)
Details
       

 09-08-2018
1.00
Wing tip lights final install (40-10)
Details
       

 09-04-2018
2.00
Engine ground run (PAP-G6)
Details
       

 09-01-2018
1.00
wing tip light check (40-10)
Details
       

 08-31-2018
3.00
Rear Window install (25-06)
Details
       

 08-26-2018
2.00
Pitot and Static system check (PAP-G5)
Details
       

 08-19-2018
0.50
Trim tab (7A-02)
Details
       

 08-18-2018
2.50
Fill brake system (35-08)
Details
       

 08-15-2018
1.00
Cockpit Light Install (40-13)
Details
       

 08-08-2018
3.00
Throttle and choke cables (50-02)
Details
       

 08-07-2018
3.00
Cabin heat cable (49-09)
Details
       

 08-02-2018
1.00
Finishing covering panel
Details
       

 07-31-2018
2.00
Panel covering - pseudo carbon fiber
Details
       

 07-28-2018
0.00
Oshkosh 2018
Details
       

 07-16-2018
1.00
Rotax Push Rod Inspect (SB-912-070UL)
Details
       

 07-15-2018
2.00
Avionics power up (58-04)
Details
       

 07-14-2018
1.00
Cabin Heat Control Linkage (49-08)
Details
       

 07-07-2018
1.00
ADS-B install (53-05 & 42M-07)
Details
       

 07-06-2018
1.00
Rudder pedal access covers (33-03)
Details
       

 07-05-2018
1.00
Fuel tank filler neck install (37-09)
Details
       

 07-04-2018
1.00
Misc items and covers (33-02)
Details
       

 07-03-2018
1.00
Mounting the ELT (42F-03)
Details
       

 07-02-2018
2.00
ELT install (42F-03)
Details
       

 07-01-2018
1.00
ADS-B Atenna Install (53-11)
Details
       

 06-30-2018
0.50
Pitch Servo (44A-04)
Details
       

 06-29-2018
0.50
Roll Servo installed (44A-03)
Details
       

 06-24-2018
0.50
Auto pilot servo install (44A-02)
Details
       

 06-23-2018
0.50
ELT bracket attach holes (42F-03)
Details
       

 06-22-2018
2.00
Paint remaining floor sections (42C-11)
Details
       

 06-21-2018
2.00
Installing ADAHRS (42C-09)
Details
       

 06-12-2018
0.50
GPS install (42C-07)
Details
       

 06-09-2018
0.00
HDX install (42C-05)
Details
       

 06-08-2018
0.50
XPNDR install and panel prep (42C-05)
Details
       

 06-07-2018
0.50
Installed GTR200 (42G-03)
Details
       

 06-06-2018
0.50
Install Stack Angles (42G-02)
Details
       

 06-05-2018
0.50
Skyview AP-Knob Install (58-04)
Details
       

 06-04-2018
1.00
Skyview AP-Knob Install (58-01)
Details
       

 05-21-2018
0.50
Control Module Install (42M-03)
Details
       

 05-20-2018
0.50
Tail cone install (12-09)
Details
       

 05-18-2018
0.50
Tail cone (12-08)
Details
       

 05-17-2018
0.50
Tail cone install (12-07)
Details
       

 05-16-2018
1.00
Start tail cone install (12-05)
Details
       

 04-28-2018
0.50
HS Front Spar Service Bulletin (SB 18-02-02) Log
Details
       

 04-24-2018
2.00
Avionics arrives
Details
       

 04-23-2018
2.00
HS Front Spar Service Bulletin (SB 18-02-02) Log
Details
       

 04-21-2018
2.00
HS Front Spar Service Bulletin (SB 18-02-02) Log
Details
       

 04-07-2018
1.00
HS Front Spar Service Bulletin (SB 18-02-02) log
Details
       

 04-06-2018
2.00
HS Front Spar Service Bulletin (SB 18-02-02) log
Details
       

 03-31-2018
1.00
HS Front Spar Service Bulletin (SB 18-02-02) log
Details
       

 03-29-2018
0.50
HS Front Spar Service Bulletin (SB 18-02-02) log
Details
       

 03-28-2018
0.50
HS Front Spar Service Bulletin (SB 18-02-02) log
Details
       

 03-27-2018
1.50
HS Front Spar Service Bulletin (SB 18-02-02) log
Details
       

 03-26-2018
0.50
Anti Servo Tab Service Bulletin (SB 18-02-03) log
Details
       

 03-24-2018
1.00
Anti Servo Tab Service Bulletin (SB 18-02-03) log
Details
       

 03-23-2018
1.00
Install canopy catch (34-25)
Details
       

 03-05-2018
2.00
Nose Fork Service Bulletin (16-05-23) log
Details
       

 02-21-2018
1.00
Oil Hose Install (49-17)
Details
       

 02-20-2018
1.00
Apply Heat Shield (49-16)
Details
       

 02-18-2018
0.50
Prep for heat shield (49-16)
Details
       

 02-17-2018
1.00
Attach remaining air duct seals (49-15)
Details
       

 02-16-2018
0.50
Air Duct Seal (49-15)
Details
       

 02-11-2018
0.50
Touch up fiberglass work (49-14)
Details
       

 02-10-2018
0.50
Fiberglass Air Duct (49-14)
Details
       

 02-09-2018
2.50
Air Duct Attachment (49-13)
Details
       

 02-03-2018
0.50
Fiting Air duct (49-13)
Details
       

 01-29-2018
1.00
Fitting Air duct (49-13)
Details
       

 01-27-2018
1.50
Fitting Air Duct (49-13)
Details
       

 01-26-2018
0.50
Attach Oil Cooler (49-12)
Details
       

 01-25-2018
0.50
Attach Oil Cooler (49-12)
Details
       

 01-24-2018
0.50
Oil Cooler Box Assembly (49-11)
Details
       

 01-22-2018
1.00
Oil Cooler Box (49-11)
Details
       

 01-20-2018
2.00
Radiator hose install (49-07)
Details
       

 01-18-2018
1.50
Radiator installation (49-05)
Details
       

 01-16-2018
0.50
Cooler box door gasket (49-04)
Details
       

 01-15-2018
1.00
Attach Cooler box and door (49-04)
Details
       

 12-28-2017
1.00
Cooler door hinge (49-03)
Details
       

 12-27-2017
2.00
Wing Skin Replace (17-05)
Details
       

 12-19-2017
0.00
More pics with wings on (30-04)
Details
       

 12-18-2017
3.00
1 yr later, another wing fit check (30-04)
Details
       

 12-17-2017
1.00
Oil tank installation (49-04)
Details
       

 12-16-2017
2.00
Cooler Door & hinge (49-02)
Details
       

 12-15-2017
1.50
Exhaust system install (48-02)
Details
       

 12-14-2017
0.50
Spinner final assembly (47-06)
Details
       

 12-13-2017
1.00
Set propeller and install (47-07)
Details
       

 12-12-2017
2.00
Spinner gap filler install (47-06)
Details
       

 12-11-2017
1.00
Install nut plates on spinner plates (47-05)
Details
       

 12-10-2017
1.00
Install spinner gap filler (47-05)
Details
       

 12-09-2017
1.00
Finish lower cowl close out (38-09)
Details
       

 12-08-2017
2.00
Lower cowling close out (38-09)
Details
       

 11-15-2017
1.00
Attach oil access door (38-08)
Details
       

 11-14-2017
1.00
Cut out oil door and access hole (38-07)
Details
       

 11-13-2017
1.00
Attach nut plates to fwd cowling (38-07)
Details
       

 11-12-2017
6.00
Set cowling rivets (38-06)
Details
       

 11-08-2017
2.00
Countersink all the cowling holes (38-06)
Details
       

 11-07-2017
3.00
Drill hinge attachment holes (38-06)
Details
       

 11-04-2017
6.00
Cowling trim/fit (38-05)
Details
       

 10-31-2017
2.00
Cowling fit / trim (38-05)
Details
       

 10-30-2017
1.00
Spinner gap edge fix (47-05)
Details
       

 10-29-2017
1.00
Spinner gap filler (47-05)
Details
       

 10-28-2017
1.00
Spinner install (47-05)
Details
       

 10-27-2017
2.00
Spinner install (47-04,05)
Details
       

 10-26-2017
3.00
Fabricating cowling hinges and pins (38-03,04)
Details
       

 10-11-2017
3.00
Prep cowling for install (38-02)
Details
       

 10-10-2017
2.00
Propeller on (47-03)
Details
       

 10-09-2017
1.00
Trimming Spinner (47-03)
Details
       

 10-08-2017
1.00
Secure pitot line (47-02)
Details
       

 10-07-2017
1.00
Re-routing pitot line (47-02)
Details
       

 10-06-2017
0.50
Pitot tube (47-02)
Details
       

 10-05-2017
1.50
Attach hoses to fuel drain line (46-16,17,18,19)
Details
       

 10-04-2017
1.00
Attach fuel drain line (46-16)
Details
       

 10-03-2017
0.50
Fuel Drain (46-16)
Details
       

 10-02-2017
0.50
Wire starter and manifold pressure hose (46-14,15)
Details
       

 10-01-2017
1.00
Sensor wire installs (46-12,13)
Details
       

 09-30-2017
3.00
Install fuel lines and wireing (46-09,10,11)
Details
       

 09-29-2017
3.00
Hanging the engine (46-08)
Details
       

 09-28-2017
0.50
Prep to hang engine (46-08)
Details
       

 09-27-2017
1.00
Final size engine mounts (46-08)
Details
       

 09-26-2017
1.00
Fuel lines and banjo bolts (46-07)
Details
       

 09-25-2017
0.50
Re-attach carbs (46-07)
Details
       

 09-23-2017
0.50
Attach homemade bridge gap filler (46-06)
Details
       

 09-22-2017
0.50
attach drip trays (46-06)
Details
       

 09-21-2017
0.50
gap bridge solution (46-06)
Details
       

 09-20-2017
0.50
Prepare bridge for carb to drip tray (46-06)
Details
       

 09-16-2017
1.00
Seal drip trays (46-06)
Details
       

 09-15-2017
2.00
Drip trays (46-06)
Details
       

 09-14-2017
1.00
Engine mount installation (46-05)
Details
       

 09-13-2017
1.00
Prep engine mount (46-05)
Details
       

 09-12-2017
1.00
Hack saw off starter lug (46-04)
Details
       

 09-11-2017
0.50
Disconnect engine ignition wires (46-02)
Details
       

 09-10-2017
0.50
Engine Installation (46-02)
Details
       

 09-09-2017
1.00
Hooking up the relays (45A-08)
Details
       

 09-06-2017
1.00
Engine wiring (46A-06)
Details
       

 09-05-2017
1.00
Firewall fwd wire harness (45A-03)
Details
       

 09-04-2017
1.00
Secure Battery (45A-02)
Details
       

 09-02-2017
1.00
Instal fuel vent lines (37-08)
Details
       

 09-01-2017
2.00
fuel vent line install (37-08)
Details
       

 08-26-2017
1.00
Fuel vent line (37-08)
Details
       

 08-25-2017
1.00
Fuel vent lines (37-08)
Details
       

 08-24-2017
0.50
Fule neck plate nuts (37-07)
Details
       

 08-23-2017
0.50
Fule neck plate nuts (37-07)
Details
       

 08-22-2017
2.00
Fuel Tank Install (37-07)
Details
       

 08-21-2017
3.00
Canopy sanding (34-16)
Details
       

 08-19-2017
5.00
Inventory Engine Kit
Details
       

 08-18-2017
1.00
Engine Delivery
Details
       

 08-05-2017
2.00
Canopy trim work (34-15)
Details
       

 07-26-2017
0.00
Looked at some good and not so good canopy work
Details
       

 07-25-2017
0.00
New RV-12is
Details
       

 07-24-2017
0.00
Oshkosh 2017
Details
       

 07-22-2017
1.00
More trimming on canopy (34-15)
Details
       

 07-21-2017
3.00
Canopy re-install (34-15)
Details
       

 07-20-2017
0.50
Trim Tab Installation (11-08)
Details
       

 07-19-2017
0.50
Trip tabs installed (11-08)
Details
       

 07-01-2017
1.00
Detailed finishing on canopy (34-15)
Details
       

 06-03-2017
1.00
Remove canopy (34-15)
Details
       

 06-02-2017
2.00
Remove canopy (34-15)
Details
       

 05-21-2017
1.00
Locate bolt hole through fiberglass (34-15)
Details
       

 05-20-2017
4.00
Lots of sanding sanding (34-15)
Details
       

 05-07-2017
1.00
Peel-ply off and added some epoxy flox (34-15)
Details
       

 05-06-2017
1.00
Last layer and peel-ply (34-14)
Details
       

 05-06-2017
1.00
Continue layup (34-14)
Details
       

 05-05-2017
1.00
Fiberglass Layup (34-14)
Details
       

 05-04-2017
1.00
starting the fiberglass (34-14)
Details
       

 05-03-2017
1.00
Cut out fiberglass (34-14)
Details
       

 05-02-2017
1.00
Fiberglass prep (34-14)
Details
       

 05-01-2017
0.50
Smoother transition for masking line (34-14)
Details
       

 04-29-2017
0.50
Mask edge for fiberglass (34-14)
Details
       

 04-28-2017
0.50
Mask edging for fiberglass (34-14)
Details
       

 04-27-2017
0.50
Shape foam (34-13)
Details
       

 04-26-2017
1.00
Attach foam blocks (34-13)
Details
       

 04-25-2017
0.50
Cut foam blocks to canopy (34-13)
Details
       

 04-24-2017
0.50
Prep for foam blocks (34-13)
Details
       

 04-22-2017
0.50
Masking prep (34-13)
Details
       

 04-21-2017
0.50
Masking Prep (34-13)
Details
       

 04-20-2017
0.50
Masking in prep for fiberglass (34-13)
Details
       

 04-19-2017
0.50
Wire canopy latch switch (34-11)
Details
       

 04-04-2017
1.00
Install canopy latch micro switch (34-11)
Details
       

 04-02-2017
0.50
Canopy latch (34-11)
Details
       

 04-01-2017
0.50
Install canopy latch (34-10)
Details
       

 03-26-2017
2.00
Canopy guide blocks (34-12)
Details
       

 03-25-2017
2.00
Attach canopy (34-09)
Details
       

 03-22-2017
1.00
Attach canopy to frame (34-09)
Details
       

 03-19-2017
2.00
Attach canopy side and skirt (34-09)
Details
       

 03-18-2017
1.00
Don't drop the canopy (34-09)
Details
       

 03-17-2017
1.00
Additional clearance for canopy edge (34-09)
Details
       

 03-16-2017
3.00
Attaching canopy to rear frame (34-09)
Details
       

 03-15-2017
1.00
Canopy back on (34-09)
Details
       

 03-11-2017
1.00
Attach turtle skins (25-05)
Details
       

 03-10-2017
2.00
Attach turtle back skins (25-05)
Details
       

 03-09-2017
3.00
Touch up paint for side rails
Details
       

 03-08-2017
2.00
Fabricate canopy lift handles (34-09)
Details
       

 03-04-2017
3.00
Paint canopy frame and other misc hardware
Details
       

 03-04-2017
3.00
Paint canopy frame and other misc hardware
Details
       

 02-18-2017
1.00
Canopy guide plate installation (34-08)
Details
       

 02-10-2017
2.00
Canopy install (34-07)
Details
       

 02-04-2017
1.00
Guide plate and block installation (34-08)
Details
       

 01-28-2017
0.50
Canopy handle (34-07)
Details
       

 01-27-2017
0.50
Canopy latch (34-07)
Details
       

 01-26-2017
2.00
Tension stabilator cables (32-14)
Details
       

 01-25-2017
4.00
Attach stabilator (11-03 & 32-13)
Details
       

 01-24-2017
1.00
Install canopy (34-06)
Details
       

 01-22-2017
3.00
Install canopy (34-06)
Details
       

 01-21-2017
2.00
Canopy intallation (34-05)
Details
       

 01-20-2017
1.00
Canopy Installation (34-04)
Details
       

 01-19-2017
1.00
Canopy installation (34-04)
Details
       

 01-18-2017
1.00
Canopy installation (34-03)
Details
       

 01-17-2017
1.00
fix bolt orientation for flight control (32-05)
Details
       

 01-16-2017
3.00
Aft window fit (25A-03)
Details
       

 01-14-2017
3.00
Canopy Frame (34-02)
Details
       

 01-09-2017
0.50
Canopy Struts (34-02) - NOTIFICATION 16-11-04
Details
       

 01-07-2017
0.50
Completed front gear stops (35-07)
Details
       

 01-06-2017
1.00
Remove damaged ES-00078 connector (30-03)
Details
       

 01-05-2017
1.00
Finsh falperon torque arms (32-10)
Details
       

 01-04-2017
2.00
Flaperon torque arms (32-10)
Details
       

 01-03-2017
2.00
Flaperon torque arms (32-10)
Details
       

 01-02-2017
1.00
Wings on (30-04)
Details
       

 01-01-2017
3.00
Wings trial fit (30-03)
Details
       

 12-31-2016
2.00
Horizontal stabilizer control cables (32-13)
Details
       

 12-30-2016
3.00
Attach rudder cables (32-12)
Details
       

 12-29-2016
2.00
Rudder cables (32-11 &12)
Details
       

 12-29-2016
2.00
Rudder cables (32-11 & 12)
Details
       

 12-28-2016
3.00
Flaperon torque arm spacer (32-08)
Details
       

 12-27-2016
5.00
Flaperon bell cranks & flap handle (32-07)
Details
       

 12-26-2016
3.00
Flaperon control arms (32-06)
Details
       

 12-25-2016
3.00
Install mixer and control rods (32-05)
Details
       

 12-24-2016
2.00
Attach flap handle (32-04)
Details
       

 12-23-2016
2.00
Installed brake lines (32-02)
Details
       

 12-22-2016
1.00
Plane is on it's feet (35-07)
Details
       

 12-22-2016
3.00
Install vertical stabilzer (32-02 & 11-02)
Details
       

 12-22-2016
3.00
Install brake lines (35-06)
Details
       

 12-21-2016
2.00
Attach front wheel (35-07)
Details
       

 12-20-2016
4.00
Install axils main gear (35-04)
Details
       

 12-19-2016
5.00
Install right gear spar (35-03)
Details
       

 12-18-2016
3.00
Tires (35-02)
Details
       

 12-17-2016
1.00
Install engine mount (35-02)
Details
       

 12-16-2016
2.00
Canopy roll bar wires (31B-26)
Details
       

 12-15-2016
3.00
Group wires and add shield (31B-25)
Details
       

 12-14-2016
3.00
Wing connect cover plates (31B-24)
Details
       

 12-13-2016
3.00
Noise filter intall (31B-22)
Details
       

 12-10-2016
2.00
Complete tail cone wiring (31B-21)
Details
       

 12-09-2016
3.00
Tailcone wire routing (31B-21)
Details
       

 12-08-2016
1.00
Wire wing connectors (31B-18)
Details
       

 12-07-2016
2.00
Headset connections (31B-17)
Details
       

 12-06-2016
3.00
Attach power outlet (31B-16)
Details
       

 12-05-2016
3.00
Started routing Options wire harness (31B-15)
Details
       

 12-03-2016
3.00
Attach control sticks and wire PTT (31B-12)
Details
       

 12-01-2016
1.50
Fule pump wire (31B-11)
Details
       

 11-30-2016
3.00
Spar pin switch installation (31B-10)
Details
       

 11-12-2016
1.00
Prep plane for some weekend visitors (31B-04)
Details
       

 11-09-2016
0.50
Trail fit spar pins
Details
       

 11-08-2016
2.50
Paint spar pins and other misc parts (30-02)
Details
       

 11-07-2016
0.50
Spar pin assembly (30-02)
Details
       

 11-05-2016
0.50
Wing spar pin (30-02)
Details
       

 11-04-2016
0.50
Wire fuel sensor and aux music jack (31B-06,07)
Details
       

 11-03-2016
0.50
Install CPU fans (31B-05)
Details
       

 11-02-2016
0.50
Complete WH-00046 plug (31B-05)
Details
       

 10-10-2016
1.00
Run WH-00046 wire harness (31B-05)
Details
       

 10-08-2016
2.00
Finish riveting tail section to fuselage (25-04)
Details
       

 10-07-2016
3.00
Attach baggage corner skins (25-04)
Details
       

 10-01-2016
2.00
Attach tail section (25-03)
Details
       

 09-30-2016
1.00
Tail cone attachment (25-02)
Details
       

 09-29-2016
0.50
Run ELT line (31B-03)
Details
       

 09-28-2016
0.50
Run cables (31B-03)
Details
       

 09-24-2016
1.00
Grommet and cushion clamp installation (31B-02)
Details
       

 09-17-2016
2.00
Panel and top skin in place (29A-11)
Details
       

 09-16-2016
3.00
Attach map box and inst panel (29A-10)
Details
       

 09-10-2016
1.00
Engine mount Service Bulletin (SB 16-08-24) log
Details
       

 09-09-2016
1.00
Engine mount Service Bulletin (SB 16-08-24) log
Details
       

 09-08-2016
1.00
Attach map box to right panel (29A-08)
Details
       

 09-07-2016
1.00
Attach map box (29A-08)
Details
       

 09-03-2016
2.00
Attach map box (29A-08 & 29A-10)
Details
       

 09-02-2016
1.00
Pulling off the fwd upper fuselage skin
Details
       

 09-01-2016
5.00
Attach Fwd Upper Fusalge skin (29A-06)
Details
       

 08-27-2016
2.00
Sealed up all the opening and rivets (29A-06)
Details
       

 08-26-2016
3.00
Install canopy ribs & oil tank assembly (29A-06)
Details
       

 08-25-2016
1.00
Install instrumentation shelf (29A-05)
Details
       

 08-24-2016
2.00
Re-assemble after painting interior
Details
       

 08-20-2016
5.00
Prep & paint the rest of the misc. interior parts
Details
       

 08-19-2016
5.00
Prep & paint the rest of the misc. interior parts
Details
       

 08-13-2016
2.00
Rear baggage panel prep (33-03)
Details
       

 08-12-2016
2.00
Assembly and prep Map box for paint (29A-07)
Details
       

 08-06-2016
0.00
More interior pictures
Details
       

 08-05-2016
0.00
More pictures of the interior
Details
       

 08-04-2016
1.00
Re-coat interior
Details
       

 08-03-2016
3.00
Re-coat interior
Details
       

 07-14-2016
4.00
Final color coat for interior paint
Details
       

 07-13-2016
2.00
Interior primer
Details
       

 07-12-2016
2.00
Interior primer coat
Details
       

 07-11-2016
3.00
Prep interior surface for paint
Details
       

 07-09-2016
3.00
More masking...paint booth finished, I think
Details
       

 07-06-2016
3.00
Paint boothe and masking
Details
       

 07-05-2016
3.00
Building a paint booth
Details
       

 07-04-2016
0.00
Making room for the paint booth
Details
       

 06-25-2016
5.00
Prep for paint interior
Details
       

 06-18-2016
0.00
Air system and paint supplies
Details
       

 06-11-2016
2.00
Final drill longeron holes for panel base (29A-05)
Details
       

 06-10-2016
1.00
complete riveting canopy rib attachment hardware (
Details
       

 06-09-2016
1.00
Attach doubler and bracket to canopy ribs (29A-05)
Details
       

 05-23-2016
1.00
Gascolator safety wire (28-05)
Details
       

 05-15-2016
0.50
Adding parts to see how it looks (29A)
Details
       

 05-14-2016
7.50
Canopy ribs (29A-05)
Details
       

 05-09-2016
2.00
Attach fwd skin stiffeners (29A-03)
Details
       

 05-07-2016
1.00
Attached side hinges and antenna shelf (29A-03)
Details
       

 05-04-2016
1.00
Attach upper firewall (29A-03)
Details
       

 05-02-2016
1.00
Prep for upper firewall attachment (29A-03)
Details
       

 04-30-2016
0.25
Strut attach angle - step 4 (29A-05)
Details
       

 04-29-2016
0.25
Strut attach angle - step 3 (29A-05)
Details
       

 04-28-2016
0.25
Strut attach angle - step 2 (29A-05)
Details
       

 04-27-2016
1.25
Strut attach angle - step 1 (29A-05)
Details
       

 04-23-2016
1.00
Fwd upper fuselage (29A-02)
Details
       

 04-20-2016
2.00
Fwd upper fuselage (29A-02)
Details
       

 04-19-2016
1.00
Fwd upper fuselage - hinge drilling (29A-02)
Details
       

 04-18-2016
1.00
Fwd upper fueslage - hinge drilling (29A-02)
Details
       

 04-13-2016
3.00
Upper fuselage doubler (29A-02)
Details
       

 04-12-2016
1.00
Upper firewall spacer (29A-02)
Details
       

 04-11-2016
2.00
Upper fwd fuselage doubler (29A-02)
Details
       

 04-09-2016
1.50
Finish break lines (27-05)
Details
       

 04-08-2016
0.50
Brake line assembly jig (27-04)
Details
       

 04-07-2016
6.00
Rudder pedals - left side (27-03 & 27-04)
Details
       

 04-06-2016
6.50
Rudder pedals (27-02 & 27-03)
Details
       

 04-04-2016
0.50
Seats arrive from Flightline
Details
       

 04-02-2016
1.00
Completed fuel lines (28-07)
Details
       

 04-01-2016
2.00
Long fuel return line from fire wall shelf (28-06)
Details
       

 03-31-2016
1.00
Completed fuel tank return line (28-06)
Details
       

 03-31-2016
1.00
Apply thread sealant and torque seal at each joint
Details
       

 03-30-2016
2.00
Long fuel line- round 2 (28-04)
Details
       

 03-23-2016
2.00
Completed fuel line to gascolator
Details
       

 03-21-2016
3.00
Long Fuel Line (F-1259E) Woes (28-04)
Details
       

 03-19-2016
1.50
Fuel shut off valve (28-02)
Details
       

 03-17-2016
0.50
Pump to tank fuel line (28-03)
Details
       

 03-16-2016
1.00
Start working the fuel lines (28-03)
Details
       

 03-14-2016
4.00
Right Seat back assembly (26-04)
Details
       

 03-12-2016
4.00
Final assembly left seatback (26-04)
Details
       

 03-09-2016
2.00
Seatback assembly (26-03)
Details
       

 03-08-2016
4.00
Seatback assembly (26-02)
Details
       

 03-07-2016
1.00
Seatback assembly (26-02)
Details
       

 03-05-2016
0.00
More paint and interioir ideas
Details
       

 03-04-2016
0.00
Snap bushing differences from manual (24-06)
Details
       

 03-03-2016
1.00
Bulkhead stiffener (24-06)
Details
       

 03-02-2016
2.00
Finished riveting baggage bulkhead (24-05)
Details
       

 02-29-2016
1.00
Assemble baggage bulkhead (24-05)
Details
       

 02-27-2016
1.00
Assembly baggage bulkhead (24-05)
Details
       

 02-25-2016
2.00
Finish Deburr and prime bulkhead (24-05)
Details
       

 02-23-2016
4.00
Baggage bulhead prep (24-05)
Details
       

 02-22-2016
1.00
Baggage bulkhead prep (24-03)
Details
       

 02-20-2016
2.00
Rivet roll bar to bases (24-03)
Details
       

 02-19-2016
2.00
Finish riveting the roll bar (24-02)
Details
       

 02-18-2016
2.00
Started riveting roll bar (24-02)
Details
       

 02-17-2016
1.00
Fit roll bar - round 2 (24-02)
Details
       

 02-10-2016
3.00
Final drill holes for roll bar base (24-02)
Details
       

 02-08-2016
2.00
Prime inside of roll bar (24-02)
Details
       

 02-06-2016
4.00
Roll bar assembly and fit prep (24-02)
Details
       

 02-05-2016
4.00
Roll Bar prep (24-02)
Details
       

 01-30-2016
2.00
Install lower cowl hinge (23-08)
Details
       

 01-25-2016
4.00
Install vent doors (23-07)
Details
       

 01-23-2016
8.00
Finish up side skin attachment (23-06)
Details
       

 01-18-2016
3.00
Prep side skins (23-06)
Details
       

 01-16-2016
8.00
Inventory Finishing Kit
Details
       

 01-15-2016
8.00
Finishing Kit Inventory
Details
       

 01-14-2016
4.00
Installing side skins (23-06)
Details
       

 01-09-2016
4.00
Side skin trial fit in prep for dilling (23-06)
Details
       

 01-08-2016
2.00
Side skin prep (23-05)
Details
       

 01-07-2016
2.00
Mid fuselage skeleton
Details
       

 01-06-2016
6.00
Mid Fuselage Skeleton (23-04)
Details
       

 01-02-2016
4.00
Mid Fuselage Brace (23-03)
Details
       

 01-01-2016
8.00
Conitnued work on the longerons (23-02)
Details
       

 12-31-2015
6.00
Longeron shaping (23-02)
Details
       

 12-30-2015
4.00
Started longerons (23-02)
Details
       

 12-30-2015
2.00
Finished attaching front section (22-05)
Details
       

 12-29-2015
6.00
Attached stiffener and flow bracket (22-04)
Details
       

 12-28-2015
0.00
New steel vice
     

 12-28-2015
2.00
F-1201L Bracket (22-03)
Details
       

 12-27-2015
6.00
Adding Shelf and Stiffners (22-03)
Details
       

 12-26-2015
2.00
Attached lower cowling brackets (22-02)
Details
       

 12-25-2015
2.00
Attached Cooler Stiffner (22-02)
Details
       

 12-24-2015
4.00
Attached Tunnel panels to floor (22-02)
Details
       

 12-23-2015
4.00
Attached Engine Mount Brackets (22-02)
Details
       

 12-22-2015
4.00
Fwd Tunnel Assembly (22-02)
Details
       

 12-21-2015
2.00
Last touches on section 21 (21-20)
Details
       

 12-20-2015
4.00
Right step floor attached (21-19)
Details
       

 12-19-2015
4.00
Left step floor attached (21-19)
Details
       

 12-18-2015
2.00
Attached F-1202F bulk head (12-18)
Details
       

 12-17-2015
2.00
Attach step angles (21-18)
Details
       

 12-16-2015
1.00
Prepared nut plate brackets (21-18)
Details
       

 12-15-2015
2.00
Final drill step holes (21-17)
Details
       

 12-14-2015
2.00
Prepare step attach angles (21-17)
Details
       

 12-12-2015
3.00
Attach bottom skin (21-16)
Details
       

 12-10-2015
3.00
Attach bottom skin (21-16)
Details
       

 12-09-2015
2.00
Prep bottom skin (21-16)
Details
       

 12-08-2015
1.00
Attached bulkhead fuel line fitting (28-06)
Details
       

 12-07-2015
1.00
Attached fuselage corner skins (21-15)
Details
       

 12-05-2015
3.00
Fuselage corner skins (21-15)
Details
       

 11-30-2015
4.00
Attach step ribs (21-14)
Details
       

 11-29-2015
1.00
Control column assembly (21-14)
Details
       

 11-28-2015
3.00
Attaching seat ramp floors (21-13)
Details
       

 11-27-2015
3.00
Bulkhead attached (21-12)
Details
       

 11-26-2015
1.00
Adding control column mounts to bulkhead (21-11)
Details
       

 11-25-2015
2.00
Bulkhead doubler assembly (21-11)
Details
       

 11-24-2015
1.00
Rivet stub spar receptacle (21-10)
Details
       

 11-23-2015
3.00
Stub spar recepticle and bulk head prep (21-10)
Details
       

 11-22-2015
3.00
Control column mount assembly (21-10)
Details
       

 11-21-2015
2.00
Bulkhead cap (21-09)
Details
       

 11-20-2015
1.00
Fwd upright assemblies (21-09)
Details
       

 11-18-2015
1.00
Seat floor assembly (21-08)
Details
       

 11-17-2015
2.00
Seat floor assembly (21-07)
Details
       

 11-16-2015
3.00
Seat back hinge (21-06)
Details
       

 11-14-2015
1.00
Crotch strap brackets installed (21-06)
Details
       

 11-14-2015
2.00
Crotch Strap Bracket (21-06)
Details
       

 11-13-2015
0.50
Auto pilot bracket installed (39-02)
Details
       

 11-13-2015
1.00
Auto pilot bracket install (39-02)
Details
       

 11-12-2015
0.50
Auto Pilot Servo Bracket (39-01)
Details
       

 11-11-2015
1.00
Flaperon Mixer Bracket/Seat Rib Assembly (21-05)
Details
       

 11-09-2015
2.00
Pulley Bracket/Seat Rib Assembly (21-05)
Details
       

 11-08-2015
0.00
Interior Seat Options
Details
       

 11-07-2015
3.50
Started Seat ribs (21-04)
Details
       

 11-04-2015
1.00
Flaperon Mixer Assembly (21-04)
Details
       

 11-02-2015
0.50
Flaperon mixer assembly (21-04)
Details
       

 10-31-2015
0.50
Pully Bracket Assembly (21-03)
Details
       

 10-30-2015
1.00
Bearing bracket attached (21-03)
Details
       

 10-29-2015
1.00
Bearing bracket assembly (21-03)
Details
       

 10-28-2015
0.50
Rivet bagage floor to rear bulkhead (21-03)
Details
       

 10-26-2015
0.50
Rear bagage ribs (21-03)
Details
       

 10-24-2015
0.50
Rear bagage ribs & bulkhead (21-03)
Details
       

 10-23-2015
0.50
Complete Bearing bracket assembly (20-02)
Details
       

 10-21-2015
0.50
Bearing bracket prep ()21-02)
Details
       

 10-19-2015
1.00
Aft bagage rib preped for assembly (21-02)
Details
       

 10-17-2015
1.50
Wing socket assembly (21-02)
Details
       

 10-10-2015
0.50
Attach nut plates to bagage floor (21-02)
Details
       

 10-07-2015
1.00
Bagage ribs to mid fuselage (21-02)
Details
       

 10-03-2015
3.00
Bagage ribs (21-02)
Details
       

 09-28-2015
1.00
Finished attaching bagage floor (21-02)
Details
       

 09-26-2015
3.00
Rivet bagage floors to mid fuselage (21-02)
Details
       

 09-05-2015
0.50
Wing tip fiberglass (40-08)
Details
       

 09-04-2015
0.50
Wing tip light fiberglass work (40-08)
Details
       

 08-29-2015
0.00
Paint Scheme options
Details
       

 08-17-2015
0.00
Wing Service Bulletin (SB 14-11-03) Log
Details
       

 08-15-2015
3.00
Left Wing Service Bulletin (SB 14-11-03)
Details
       

 08-14-2015
2.00
Left Wing Service Bulletin (SB 14-11-03)
Details
       

 08-08-2015
1.00
Mounted side brackets on center section (20-05)
Details
       

 08-04-2015
2.00
Attach aft side bulkheads (20-04)
Details
       

 08-03-2015
2.00
Rivet Center Section (20-04)
Details
       

 07-22-2015
0.00
Oshkosh 2015
Details
       

 07-17-2015
2.00
Attach corner flanges (20-04)
Details
       

 07-11-2015
2.00
Center Section Assembly (20-03)
Details
       

 06-27-2015
2.00
Set bulkhead to bottom skin (20-03)
Details
       

 06-25-2015
1.00
Installed retainer blocks (20-02)
Details
       

 06-20-2015
1.00
Added plate nuts to bulkhead (20-02)
Details
       

 06-19-2015
1.00
Started Fuselage (20-02)
Details
       

 06-16-2015
1.00
Attach Flaperon Temperorarily (18-06)
Details
       

 06-15-2015
2.00
Finish up right flaperon (18-06)
Details
       

 06-13-2015
2.00
Right flaperon skins attached (18-06)
Details
       

 06-06-2015
5.00
Right Flaperon assembly (18-05)
Details
       

 05-30-2015
1.00
Left flaperon complete (18-06)
Details
       

 05-29-2015
2.00
Attaching nose skins to flaperon (18-06)
Details
       

 05-28-2015
2.00
Attach flaperon trail edge skin (18-06)
Details
       

 05-27-2015
4.00
Prepare and assembly flaperon ribs (18-05)
Details
       

 05-26-2015
1.00
Attached pivot brackets (18-05)
Details
       

 05-25-2015
1.00
Assembled inbd nose rib & hinge bracket (18-04)
Details
       

 05-23-2015
2.00
Drilled Counterbalance leading edge holes (18-03)
Details
       

 05-22-2015
1.00
Prep for match-drill counterbalance
Details
       

 05-19-2015
1.00
Rivet outboard nose rib to counterbalance (18-03)
Details
       

 05-18-2015
2.00
Start Flaperon assembly (18-02)
Details
       

 05-16-2015
2.00
Right wing tip (17-06)
Details
       

 05-14-2015
5.00
Fuselage inventory/storage
Details
       

 05-05-2015
1.00
Received the Fuselage Kit (5-5-2015)
Details
       

 04-25-2015
1.00
Right Wing Service Bulletin (SB 14-11-03)
Details
       

 04-18-2015
3.00
Right Wing Service Bulletin (SB 14-11-03)
Details
       

 04-11-2015
3.00
Right Wing Service Bulletin (SB 14-11-03)
Details
       

 03-28-2015
4.00
Rivet and close up the right wing (17-06)
Details
       

 03-14-2015
6.00
Right Wing Tip underside (17-06)
Details
       

 02-28-2015
1.00
Right Wing Tip (17-05)
Details
       

 02-21-2015
4.00
Finished main skins on right wing (17-04)
Details
       

 02-20-2015
4.00
Final shaping of wing doubler (17-04)
Details
       

 02-14-2015
8.00
Instsal top skins on right wing (17-04)
Details
       

 01-30-2015
3.00
Complete landing light installation (40-03)
Details
       

 01-29-2015
3.00
Right wing outboard hing bracket (17-03)
Details
       

 01-26-2015
3.00
Right wing leading dege and hinge (17-03)
Details
       

 01-24-2015
3.00
Right wing lower skins (17-02)
Details
       

 01-15-2015
6.00
Landing light cutout, and lens fabricate (40-03)
Details
       

 01-10-2015
3.00
Landing light cutout (40-02)
Details
       

 01-08-2015
1.00
Finsh access hole for right wing tip light (40-02)
Details
       

 01-07-2015
1.00
Right Wing tip access opening (40-02)
Details
       

 01-06-2015
1.00
Replacement skin damage
Details
       

 01-05-2015
2.00
Finshed up the left Wing for now (17-05)
Details
       

 01-03-2015
5.00
Wing tip light prep (40-08)
Details
       

 01-02-2015
6.00
Left wing tip attachment (17-05)
Details
       

 01-01-2015
2.00
Wing tip edges riveted in place (17-05)
Details
       

 01-01-2015
3.00
Wing tip edge rib channels (17-05)
Details
       

 12-31-2014
2.00
Left wing tip upper skin (17-05)
Details
       

 12-30-2014
4.00
Left wing handle and wing tip (17-05 & 40-02)
Details
       

 12-29-2014
6.00
Wing walk doubler installation (17-04)
Details
       

 12-29-2014
3.00
Adding the final skin to the Left wing (17-04)
Details
       

 12-29-2014
2.00
Access pannel cover (17-04)
Details
       

 12-27-2014
4.00
Left wing upper skins (17-03)
Details
       

 12-26-2014
6.00
Attaching hinge ribs (17-03)
Details
       

 12-23-2014
8.00
Left wing skins (17-02)
Details
       

 12-22-2014
1.00
Landing light cut-out mishap (14-02)
Details
     

 12-20-2014
6.00
Landing light cut out (40-02 & 40-04)
Details
       

 12-18-2014
8.00
Underside wing skin install (17-02)
Details
       

 12-17-2014
5.00
Right wing fwd rib & wire install (15-07 & 40-05)
Details
       

 12-16-2014
3.00
Right wing, aft ribs installation (15-06)
Details
       

 12-15-2014
0.00
Building wing stand
Details
       

 12-13-2014
5.00
Attach Left inboard wing skin (17-02)
Details
       

 12-06-2014
2.00
Stall Warning attachment (16-03)
Details
       

 12-02-2014
3.00
Stall Warning Assembly (16-02)
Details
       

 12-01-2014
2.00
Attachin more nose ribs - left wing (15-05)
Details
       

 11-26-2014
2.00
Attaching the nose ribs on left wing (15-05)
Details
       

 11-25-2014
1.00
Left Wing Assembly (15-04)
Details
       

 11-25-2014
1.00
Left Wing Assembly (15-04)
Details
       

 11-24-2014
4.00
Finished the last of the ribs (15-03)
Details
       

 11-22-2014
10.00
Finishing up all the wing ribs (15-03)
Details
       

 11-08-2014
8.00
Fwd Wing Rib deburr and prep (15-02)
Details
       

 10-06-2014
1.00
Wing rib flange tab removal process (15-02)
Details
       

 10-04-2014
1.00
Deburring wing ribs (15-02)
Details
       

 09-30-2014
0.00
Local air show - Red Stuart Airfield (Waynesville,
Details
       

 09-29-2014
3.00
Wing Rib Deburring (15-02)
Details
       

 09-27-2014
2.00
Right & Left Rear spar assembly (14-03)
Details
       

 09-20-2014
4.00
Right & Left Rear spar assembly (14-03)
Details
       

 09-15-2014
2.00
Hinge bracket - lesson learned (14-02)
Details
       

 09-12-2014
1.00
Rivet Hinge Brackets (14-02)
Details
       

 09-08-2014
5.00
Prime & Rivet Stub Spar Assembly (14-02)
Details
       

 09-06-2014
3.00
Stub Spar countersink (14-02)
Details
       

 09-05-2014
5.00
Stub Spar Assembly (14-02)
Details
       

 09-01-2014
3.00
Complete spar assembly rivets (13-03)
Details
       

 08-30-2014
1.00
Drill and tap AEX tie downs (13-02)
Details
       

 08-23-2014
5.00
Match drill rib doubler and prep brackets (13-02)
Details
       

 08-16-2014
3.00
Wing spar (13-02)
Details
       

 08-16-2014
2.00
Trim Servo Molex connections (11-07)
Details
       

 08-09-2014
1.00
Hanging up the Empennage
Details
       

 08-04-2014
2.00
Trim Servo Pushrod Assembly
Details
       

 07-26-2014
3.00
Wing Kit Inventory
Details
       

 07-23-2014
0.00
Wing Kit Arrives
Details
       

 07-21-2014
2.00
Servo tray - round 2 (11-05)
Details
       

 07-19-2014
1.00
Servo Tray prep (11-05)
Details
       

 07-12-2014
0.00
Boundary Waters vacation
Details
       

 06-23-2014
2.00
Final attachment for Empennage skins (10-11)
Details
       

 06-21-2014
4.00
Prep and install top skin (10-11)
Details
       

 06-19-2014
3.00
Attach bracket and prep top plate (10-11)
Details
       

 06-07-2014
6.00
Rivet side and upper side skins in place (10-10)
Details
       

 06-05-2014
1.00
F-1238 bracket prep and drill (10-10)
Details
       

 06-04-2014
4.00
Tailcone upper left skin prep (10-10)
Details
       

 05-19-2014
1.00
Staic Port installation (10-09)
Details
       

 05-17-2014
1.00
Routing wire and control cable string (10-08)
Details
       

 05-15-2014
5.00
Side Skin Installation (10-08)
Details
       

 05-14-2014
1.00
Stabilator Hinge Washer placement (10-05)
Details
       

 05-12-2014
4.00
Finished lower skin installation (10-07)
Details
       

 05-10-2014
6.00
Lower skin intallation (10-07)
Details
       

 05-09-2014
4.00
Clecoed Bottom skins and tail cone frames (10-06)
Details
       

 05-08-2014
3.00
Attach J-stiffners to bottom skins (10-06)
Details
       

 04-22-2014
2.00
Attaching J-stiffner to bottom skin (10-06) and sq
Details
       

 04-19-2014
5.00
Bottom tail cone skin preperation (10-06)
Details
       

 04-17-2014
2.00
Talked to VANS about missing part (10-04)
Details
       

 04-12-2014
0.00
Missing parts from bulkhead assembly (10-04)
Details
       

 04-10-2014
4.00
Fuselage bulkhead assembly (10-04)
Details
       

 04-08-2014
6.00
Fuselage bulkhead prep (10-03)
Details
       

 04-07-2014
3.00
FabricatedTail skid bracket (10-03)
Details
       

 04-05-2014
3.00
Started Fuselage frames (10-02)
Details
       

 04-04-2014
1.00
Hang up Stabilator and start tail cone
Details
       

 04-03-2014
1.00
Control Horn Installation (09-10)
Details
       

 03-31-2014
2.00
Aft Stabilator attachment (09-09)
Details
       

 03-29-2014
4.00
Stabilator skin installation (09-08)
Details
       

 03-28-2014
1.00
Stabilator main skin installation (09-08)
Details
       

 03-27-2014
1.00
Hinge bracket installation (09-07)
Details
       

 03-25-2014
0.00
Built another work table
Details
       

 03-22-2014
5.00
Horizontal Stabilizer skeleton (09-06)
Details
       

 03-14-2014
5.00
Spar box assembly (09-04)
Details
       

 03-13-2014
3.00
Drill nut plate holes and hinge brakets (09-04)
Details
       

 03-11-2014
2.00
Spar Box assembly (09-03)
Details
       

 03-10-2014
1.00
HS- spar cap assembly (09-03)
Details
       

 03-08-2014
3.00
Stabilator Spar cap assembly
Details
       

 03-01-2014
2.00
Deburring spar caps (09-02)
Details
       

 02-22-2014
2.00
Countersink 101 (09-02)
Details
       

 02-21-2014
2.00
Start Horizontal Stabilizer (09-02)
Details
       

 02-15-2014
4.00
Anti-servo tab (08-03 & 08-04)
Details
       

 02-11-2014
2.00
Anti-servo tab (08-02)
Details
       

 02-08-2014
3.00
Rudder completion (07-04 & 07-05)
Details
       

 02-04-2014
2.00
Rudder skeleton assembly (07-03)
Details
       

 02-01-2014
2.00
Start rudder assembly (07-02)
Details
       

 02-01-2014
1.00
Rudder fit check with VS (07-03)
Details
       

 01-28-2014
0.00
Crompressor for the shop
Details
       

 01-18-2014
2.00
Finished VS skin (06-07)
Details
       

 01-16-2014
3.00
Started riveting VS skin (06-07)
Details
       

 01-15-2014
3.00
VS fit check (06-07)
Details
       

 01-14-2014
3.00
VS skin prep (06-06)
Details
       

 01-11-2014
3.00
Prep & prime VS spar and ribs (06-05)
Details
     

 01-09-2014
2.00
Rivet spar caps to rear spar (06-05)
Details
       

 01-09-2014
0.00
Complete rear spar assembly (06-05)
Details
       

 01-08-2014
0.50
Rivetting lower spar cap to VS spar (06-05)
Details
       

 01-04-2014
1.00
Waiting on parts, so did some advance prep work on
Details
     

 01-03-2014
2.00
VS Fwd skin and Main skin prep work (06-06)
Details
       

 01-02-2014
0.50
The good the bad and the ugly (06-04)
Details
       

 01-01-2014
5.00
Vertical Stabilizer Spar (06-04)
Details
       

 12-31-2013
2.00
Organized, practiced and set first rivets (06-02)
Details
       

 12-30-2013
3.00
Repair dent on VS, build paint booth (06-02)
Details
       

 12-29-2013
0.00
Reserved N number
Details

 12-28-2013
2.00
Upper & Lower hinge assembly (06-02)
Details
       

 12-27-2013
2.00
Started vertical stabilizer (06-02)
Details
       

 12-26-2013
0.00
Storage shelves for empennage kit parts
Details
       

 12-25-2013
3.00
Day One
Details
       

 12-20-2013
0.00
Tools and First Kit (Empennage) Arrives
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.